Executive officer
nagar panchayat jansath old office
Construction of a drain in Ward No. 03, extending from Shahzad shop to Dr. Amarpal house.
2026_DOLBU_1194382_1
123/NPJ/2026-27(3)
Open Tender
Civil Works
Percentage
90 days
nagar panchayat jansath
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,740
Executive officer
₹3.3 L
8 Oct 2026
8 Oct 2026
14 Oct 2026
8 Oct 2026
14 Oct 2026
8 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavallon in foundation in ordinary soll (Loom,
day or sand) Including lift upto 1.50 M. and load
upto 30 M. and including filling watering and
ramming of excavated earth Into the trenchs or
into the space between the building and the sidos
of foundation trenches or Into the plinth and
removal and disposal of surplus earth as directed
by the Engineer-in-charge uplo a distance of 30
M. from the foundation trencho. (Whore machine)
can not move). S.I.No. 251. | 574.97 | cum | 95 | ₹54,621.68 |
| 2 | Disposal of malba from the site load up to 2.00 | 195.18 | cum | 183.5 | ₹35,815.53 |
| 3 | Disposal of malba from the site load up to 2.00
Dewatering by diesel pumping set of 5 H.P.
Capacity during the construction of bridge &
culvert etc. Including hire charges of pumping set
and its POL labour all T&P etc.complete in all
respect. As per S.I. No. Chapter 19 Now Itom 2 | 256 | cum | 165 | ₹42,240 |
| 4 | Cement Concrete with 4 cm gauge Brick
Ballast, Fine sand & cement in the proportion of
(12:6:1) Including supply of all materials,labour, Tools & plants etc.required for proper completion of the work. Asper S.I. No. 273 | 75 | cum | 2,930 | ₹2,19,750 |
| 5 | Cement Concrete with 4 cm gauge approved
stone grit, coarse sand & cement in the proportion
of (4:2:1) Including supply of all materials, labour, 1Tools & plants elc. required for proper completion
of the work. S.I. No. 279(a) | 38 | cum | 5,650 | ₹2,14,700 |
| 6 | |R.C.C. Work with cement,approved coarse sand
& 2 cm gauge approved stone grit in proportions
of (1:1.5:3) in slab excluding supply of
reinforcement and its bending,but including its
fixing and binding the same with 24
B.W.G.G.I.binding wire and Including necessary
centering and shuttering etc. and supply of all
materials, labour, Tools & plants etc.required for
proper completion of the work Including cost of
binding wire. Asper S.I. No. 287(a) | 56 | cum | 6,310 | ₹3,53,360 |
| 7 | IR.C.C. Work with cement, approved coarse sand
& 2 cm gauge approved stone grit in proportions
of (1:1.5:3) In slab excluding supply of reinforcement and its bending, but including its same with 24and binding the fixing B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants otc.required for proper completion of the work including cost of binding wire. Asper 5.1. No. 289 | 119.38 | cum | 7,800 | ₹9,31,164 |
| 8 | R.C.C. Work with cement,approved coarse sand
& 2 cm gauge approved stone grit in proportions
of (1:1.5:3) in slab excluding supply of
reinforcement and its bending, but including its
with 24 the same fixing and binding B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc.required for proper completion of the work including cost of binding wire. Asper S.I. No. 284a | 4.8 | cum | 7,400 | ₹35,520 |
| 9 | M.S. (lor steel or plain) In Plain work such as
R.C.C. or R.B. work Including bending for proper
shape and including supply of steel & its wastage,bend.hooks, and authorised over lapping
shall be measured and Including cost of binding
wire.S.I.No. 504 As per Analysis with SAIL TOR
STEEL ATES | 125 | Qtl | 8,408 | ₹10,51,000 |
| 10 | Supply and Fixing Inauguration stone with all
completion. (L.S.) | 1 | Job | 4,200 | ₹4,200 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.64 MB
BOQ_2254777.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .