Loading…
Loading…
Tender Value
₹64.4 L
EMD Value
₹1.3 L
Closing Date
30 Jul 2026, 3:00 pm4d left
Director
IISER Mohali
Construction of Drone cage for the Innovation lab at IISER Mohali
2026_IISRM_916718_1
IISERM/EE/26-27/Tender-13(02)
Open Tender
Civil Works
Percentage
180 days
IISER Mohali
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
Registrar, IISER Mohali
₹1.3 L
30 Jul 2026
10 Jul 2026
31 Jul 2026
10 Jul 2026
30 Jul 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.1 | All kinds of soil. | 72 | cum | 253.27 | ₹18,235.58 |
| 2 | Filling available excavated earth (excluding rock ) in trenches plinth sides of foundation etc. in layers not exceeding 20cm in depth, consolditing each deposited layer by ramming and watering lead up to 50 and for all lift | 70 | cum | 190.71 | ₹13,349.7 |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 150 | cum | 2,066.41 | ₹3,09,961.35 |
| 4Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 4.1 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 51.2 | cum | 6,628.08 | ₹3,39,357.7 |
| 5Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 5.1 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 56 | cum | 8,801.52 | ₹4,92,884.84 |
| 6Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 6.1 | Foundations, footings, bases of columns, etc. for mass concrete | 200 | sqm | 381.56 | ₹76,312.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.08 MB
BOQ_963388.xls
BOQ • 0.31 MB
Corrigendum1.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].