| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.1 LAccepted-AOC NA | ₹82.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹82.2 L+₹6,581.05 (0.08%)Rejected-Finance | ₹82.2 L+₹6,581.05 (0.08%) | L2 | Rejected-Finance L2 |
| 3 | L3₹82.2 L+₹8,226.32 (0.10%)Rejected-Finance MISSION HOSPITAL KE PEECHE JAL NIGAM ROAD ROBERTSGANJ SONBHADRA | ₹82.2 L+₹8,226.32 (0.10%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical PRE BID not QUALIFY |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
9 Mar 2026, 12:00 pmClosed
SE RED MZP
JHANVI HOTEL PUTLIGHAR MIRZPAUR
GRAM BAT ME VARANASI SHAKTI NAGAR MUKHYA MARGE SE PANCHAYAT BHAWAN TAK CC ROAD KA NIRMAN
2026_REDUP_1121638_1
697/RED SBR/ 2025-26 DT- 30.01.2026
Open Tender
Civil Works
Percentage
BAT
AS PER NIT AND T2
2 documents required · 2 mandatory
₹3,701
₹2 L
25 Jul 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation ordinary soil for structures as per drawing and techanical specification clause 305 including setting out, construction of shoring and bracing, removal of stumps and other deleterous material and disposal up to a lead of 50m dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 450.24 | Cum | 381.52 | ₹1,71,775.56 |
| 2 | Plain Cement Concrete (PCC) M-10 (1:3:6 Nominal Mix) in open foundation complete as per drawing and techanical specification Clause 802 | 110.04 | Cum | 5,174.27 | ₹5,69,376.67 |
| 3 | Stone Masonary work in cement mortor ( 1:4 ) in foundation complete asper drawing and techanical specification clause 702,704,1202 and 1203 (2nd sort) | 242.34 | Cum | 5,166.2 | ₹12,51,976.91 |
| 4 | Stone Masonary work in cement mortor ( 1:5 ) in super structure complete asper drawing and techanical specification clause 702,704,1202 and 1203 (2nd sort) | 223.23 | Cum | 4,749.05 | ₹10,60,130.43 |
| 5 | Cement pointing with cement mortar consisting of 1 part cement and 3 part of coarse sand as per drawing and specification clauses 613.3,1204 | 376.25 | sqm | 81.42 | ₹30,634.28 |
| 6 | Providing PCC M-20 (1:2:4) archtectural coping on the top of wing / return wall . Etc. complete asper drawing and techanical spec.clause 615,710 and 1204.3.11 | 5.94 | Cum | 6,922.56 | ₹41,120.01 |
| 7 | Providing and laying Reinforcement cement concrete pipe Np3 ( burried conducts) on first class bedding of granular material in Single row including collar with cement mortar 1:2 but excluding excavation, protection work, backing, concrete and masonary works in head walls and parapet. ( 150 mm dia ) MORD 1100 | 17.5 | R/M | 322.05 | ₹5,635.88 |
| 8 | Construction of Embankment with Material Obtained from Borrow pits with a lift upto 1.50m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Techinacal Specification Clause 301.5 | 2,200 | Cum | 228.67 | ₹5,03,074 |
| 9 | Construction of granular sub-base by providing ready mix material spreading in uniform layers with motor grader on prepared surface and compacted with 80-100 KN Smooth wheel static rollar to achieve the desired density at OMC complete as per Technical specification Clause 401. (GSB) | 324 | Cum | 1,703.26 | ₹5,51,856.24 |
| 10 | Providing, laying, spreading and compacting stone aggregates of 53 mm to 22.4 mm sizes ( Crusher broken) to water bound macadam (WBM!!!) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405 (WBM!!!) | 225.01 | Cum | 2,422.22 | ₹5,45,023.72 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_2087091.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .