Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC | L1 | Accepted-AOC ok | |
| 2 | L2₹5.7 L+₹46,421 (8.80%)Rejected-Finance | L2 | Rejected-Finance Quoted higher rates | |
| 3 | Not Admitted-Fee/PreQual/Technical 00 BALAJI ENTERPRISES NEW ROAD NEW ROAD RATLAM MADHYA PRADESH 457001 | RATLAM | MADHYA PRADESH | 457001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.4 L
EMD Value
₹4,420
Closing Date
2 Nov 2019, 5:00 pmClosed
EE (Civil) Jabalpur
Shed No. 9 Rampur Jabalpur
ANNUAL INTERNAL AND EXTERNAL CLEANING AND SWEEPING WORK OF 3 NOS. TRAINEE NIWAS AND 1 NOS. LADIES HOSTEL BUILDING M.P.P.K.V.V.C.L NAYAGAON JABALPUR. (PERIOD 12 Months).
2019_PKVVC_56605_1
TS12
Open Tender
Civil Works - Buildings
Item Rate
365 days
SE (Civil) Jabalpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹560
Yes
Payable To
₹4,420
Yes
19 Jun 2020
7 Oct 2019
4 Nov 2019
7 Oct 2019
2 Nov 2019
18 Oct 2019
Amount
Dry sweeping of all the kota stone floors, staircases, entrance, covered corridors, elevators, terraces etc. with soft brooms including collection of debries, dust and waste paper etc. and disposing it at suitable locations as directed by Engineerin in charge including all leads and lifts cost of all tools and tacles, materials, labour etc. required for complete works as per instructions of engineer in charge. (a) office areas for CTI i) Frequency - once in a day. ii) Qty for sweep per day - 1600 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per sweep v) Total Qty - 1600 x 300 = 480000/100 = 4800
Dry sweeping of all the kota stone floors, staircases, entrance, covered corridors, elevators, terraces etc. with soft brooms including collection of debries, dust and waste paper etc. and disposing it at suitable locations as directed by Engineerin in charge including all leads and lifts cost of all tools and tacles, materials, labour etc. required for complete works as per instructions of engineer in charge. (b) Entrance corridors and staircase i) Frequency - twice in a day. ii) Qty for sweep per day - 550 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per sweep v) Total Qty - 550 x 300 = 165000/100 = 1650
Dry sweeping of all the kota stone floors, staircases, entrance, covered corridors, elevators, terraces etc. with soft brooms including collection of debries, dust and waste paper etc. and disposing it at suitable locations as directed by Engineerin in charge including all leads and lifts cost of all tools and tacles, materials, labour etc. required for complete works as per instructions of engineer in charge. (c) Terrace i) Frequency - once in a month. ii) Qty for sweep per day - 800 sqm. iii) Total Frequency per year - 12. iv) Unit - 100 m2 per sweep v) Total Qty - 800 x 12 = 9600/100 = 96
Moping/ wet sweeping for all the floors, entrance, staircases, lifts, corridors etc. with phenyl water (Aromatic) (by using phenyl of approved quality like product o bengal chemicals ltd. As per instructions of engineer in charge, withcotton threaded mopper of approved quality including cost of all materials, tools, tacles, labour etc. complete as per instructions of engineer in charge. i) Frequency - once in a day. ii) Qty for sweep per day - 2950 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per sweep v) Total Qty - 2950 x 300 = 885000/100 = 8850
Washing/cleaning of floors, dado skirting including dado skirting of kitches, and toilets having height more than 30 cm by approved washing powder/ soap and following dring with clean cloth and removing waste materials from dust bins and disposal at specified locations decided by engineer in charge i/c cleaning of all mateirlas, labours, tools and tackles etc. complete as per instructions of engieer in charge. (a) General kitchens i) Frequency - once in a day. ii) Qty for sweep per day - 2 nos. iii) Total Frequency per year - 300. iv) Unit - each v) Total Qty - 2 x 300 = 600
Washing/cleaning of floors, dado skirting including dado skirting of kitches, and toilets having height more than 30 cm by approved washing powder/ soap and following dring with clean cloth and removing waste materials from dust bins and disposal at specified locations decided by engineer in charge i/c cleaning of all mateirlas, labours, tools and tackles etc. complete as per instructions of engieer in charge. (d) Attached toilets/bathroom i) Frequency - once in a day. ii) Qty for sweep per day - 64 nos. iii) Total Frequency per year - 300. iv) Unit - each v) Total Qty - 64 x 300 = 19200
Cleaning/ removal of cobwebs from each and every rooms, walls of block including toilets, kitches, terraces, entrances, staircases, corridors, elevators, shaft etc. from inside and outside complete at all floors at various elevations as per instructions of engineer in charge. (a) For trainee niwas i) Frequency - once in a month. ii) Qty for sweep per day - 4 nos. iii) Total Frequency per year - 12. iv) Unit - per building v) Total Qty - 4 x 12 = 48
Dusting both sides of doors and windows i/c shutters, glass panels, grills etc. i/c all materiasl tools and tackls labour etc. complete as per the instruction of engineer in charge (area of one side of the opening only be considered for payment). i) Frequency - once in a week. ii) Qty for sweep per day - 400 sqm. iii) Total Frequency per year - 50. iv) Unit - 100 m2 per cleaning v) Total Qty - 400 x 50 = 20000/100 = 200
Cleaning of glass panels of windows (eigther side with cleaning chemicals, colin including all materials, labour tools and tackles complete as per instructions of engineer in chage. (Net exposed surface area of the glass panels on eighter side shall only be considered for measurement and payment). i) Frequency - once in a week. ii) Qty for sweep per day - 130 Sqm. iii) Total Frequency per year - 50. iv) Unit - 100 m2 per cleaning v) Total Qty - 130 x 50 = 6500/100 = 65
Disinfectin of toilets sinks, kitchens sinks, wash basins, sanitary fixtures in kitchens and toilets wih harpic or other equivelent sanitary cleaner including cost of all materials labours tools and tackles as per instructions of engineer in charge (a) Kitchen Sink i) Frequency - once in a week. ii) Qty for sweep per day - 2 nos. iii) Total Frequency per year - 50. iv) Unit - each v) Total Qty - 2 x 50 = 100
Disinfectin of toilets sinks, kitchens sinks, wash basins, sanitary fixtures in kitchens and toilets wih harpic or other equivelent sanitary cleaner including cost of all materials labours tools and tackles as per instructions of engineer in charge. (b) wash basin urinals i) Frequency - once in a week. ii) Qty for sweep per day - 18 nos. iii) Total Frequency per year - 50. iv) Unit - each v) Total Qty - 18 x 50 = 900
Disinfectin of toilets sinks, kitchens sinks, wash basins, sanitary fixtures in kitchens and toilets wih harpic or other equivelent sanitary cleaner including cost of all materials labours tools and tackles as per instructions of engineer in charge. (b) wc seat i) Frequency - once in a week. ii) Qty for sweep per day - 40 nos. iii) Total Frequency per year - 50. iv) Unit - each v) Total Qty - 40 x 50 = 2000
Providing air fresher cake (50 gms) each of approved make in toilets as per insructions of engineer in charge. i) Frequency - once in a month. ii) Qty for sweep per day - 64 nos. iii) Total Frequency per year - 12. iv) Unit - each v) Total Qty - 64 x 12 = 768
Providing napthalins balls in urinal pots/ wash basins of toilets in sufficient quantity as per instructions of engineer in charge (minimum 5 balls are to be kept every time). i) Frequency - twice in a month. ii) Qty for sweep per day - 20 nos. iii) Total Frequency per year - 24. iv) Unit - each v) Total Qty - 20 x 24 = 480
Sweeping and cleaning of area of front and back side of both building approach and roads, 2 wheeler and 4 wheeler parking area and all area inside compund wall. i) Frequency - once in a day. ii) Qty for sweep per day - 2400 sqm. iii) Total Frequency per year - 300. iv) Unit - 100 m2 per cleaning v) Total Qty - 2400 x 300 = 720000/100 = 7200
Cleaning of all type of drains of any size and depth i.c removal of deposited spoil, begitation waste and other garbage, gladges, brick bats, hedge waste, uprooting and removal of gazar grass and other plants, collecting and disposal of the same as per direction of engineer incharge length of drains approx 150 m i) Frequency - once in a month. ii) Qty for sweep per day - 1 sqm. iii) Total Frequency per year - 12. iv) Unit - per job v) Total Qty - 1 x 12 = 12
Cleaning of sever lines, manholes, including disposal of waste matierals etc. as per direction of engineer in charge length of sever line approx 100 m i) Frequency - once in a month. ii) Qty for sweep per day - 1 sqm. iii) Total Frequency per year - 12. iv) Unit - per job v) Total Qty - 1 x 12 = 12
AMAN TRADERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .