| 1 | 1₹2.3 CrAccepted-AOC CHIEF ENGINEER DRAINAGE CUM MINING AND GEOLOGY 2 | ₹2.3 Cr Quoted ₹2.4 Cr | 1 | Accepted-AOC RANK 1 |
| 2 | 2₹2.5 Cr+₹15.9 L (6.75%)Rejected-Finance PUNJAB | HOSHIARPUR | PUNJAB | 144105 | ₹2.5 Cr+₹15.9 L (6.75%) | 2 | Rejected-Finance RANK 2 |
| Sl No | Description | Qty | Unit | BALJIT SINGH GILL L2 | MANINDER PAL SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 1 | cum | 100 ₹100 | 90 ₹90 Lowest |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 1 | cum | 125 ₹125 | 120 ₹120 Lowest |
| 3.00 | Dressing of New Earthwork | 1 | sqm | 2 ₹2 | 1.3 ₹1.3 Lowest |
| 4.00 | Re-handling of earthwork recently executed | 1 | cum | 80 ₹80 | 70 ₹70 Lowest |
| 5.00 | Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications. | 1 | cum | 105 ₹105 | 100 ₹100 Lowest |
| 6.00 | Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres | 1 | cum | 220 ₹220 | 200 ₹200 Lowest |
| 7.00 | Dismantling Brick Work in Cement | 1 | cum | 770 ₹770 | 760 ₹760 Lowest |
| 8.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 1 | sqm | 15 ₹15 | 12 ₹12 Lowest |
| 9.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls | 1 | cum | 7,000 ₹7,000 | 6,550 ₹6,550 Lowest |
| 10.00 | Cement Conc. 1:4:8 with brick ballast mixing by manual means | 1 | cum | 5,000 ₹5,000 | 4,600 ₹4,600 Lowest |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
13 Oct 2025, 10:00 amClosed
EXECUTIVE ENGINEER LUDHIANA CANAL AND GROUND WATER
EXECUTIVE ENGINEER LUDHIANA CANAL AND GW DIVN WRD PHASE 1 DUGRI NEAR DURGA MATA MANDIR LUDHIANA
Estimate for Construction/ Renovation of the water courses of outlet at RD 27335/L of 1-L Minor of Zira Disty (Open watercourse)
2025_WR_148031_3
2813/28A
Open Tender
Civil Works
Item Rate
120 days
ZIRA DISTY
Estimate for Construction/ Renovation of the water courses of outlet at RD 27335/L of 1-L Minor of Zira Disty (Open watercourse)
2 documents required · 2 mandatory
₹2,000
₹4.2 L
Yes
24 Dec 2025
21 Aug 2025
13 Oct 2025
21 Aug 2025
13 Oct 2025
21 Aug 2025
Amount
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of New Earthwork
Re-handling of earthwork recently executed
Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications.
Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres
Dismantling Brick Work in Cement
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls
Cement Conc. 1:4:8 with brick ballast mixing by manual means
Cement Conc. 1:2:4 for bed with stone ballast mixing by manual means.
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
RCC work hand mixed 1:2:4 for slab including steel reinforcement
Shuttering for faces of Concrete foundations and foundation beam & plinth beam (Vertical or battering
Providing & placing of Steel foot steps complete.
Providing lowering and joining RCC Pipe 450 mm dia in trenches and laying same to correct alignment (complete) as per IS 456-2003
Fixing of frame
Supplying & Laying Dry Brick Bats
Dag belling single kassi stroke minimum 7.5 cm depth
BALJIT SINGH GILL (BID ID -689295)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .