| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹82.8 LAccepted-AOC CHANDIGARH | ₹82.8 L Quoted ₹90.3 L | 1 | Accepted-AOC being lowest |
| 2 | 2₹90.8 L+₹45,858.50 (0.51%)Rejected-AOC SECOND FLOOR SCO 5 TDI CITY SECTOR 118 MOHALI PUNJAB | ₹90.8 L+₹45,858.50 (0.51%) | 2 | Rejected-AOC Being Highest |
Tender Value
₹91.7 L
EMD Value
₹1.8 L
Closing Date
3 Jul 2026, 11:00 amClosed
Divisional Soil conservation officer hoshiarpur
Room no 440 to 444, 4th floor admin complex hoshiarpur
Const of SMWR and Crate Wire RT wall of pond and Pucca Open Channel at Vill Suna Mehdood in sub div Mahilpur atvill Koi Chak Fala Toe Makhowal Gagg Jallon Haler under sub div Dasuya and at Vill Chatarpur Fatehpur Dharampur labbar in talwara
2026_DOA_170713_1
DSWC/HSP/2026-2027/06
Open Tender
Civil Works
Percentage
120 days
different Villages talwara, mahilpur and dasuya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.8 L
24 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
3 Jul 2026
23 Jun 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/HSP/2026-2027/06
Construction of Stone Masonry Water Recharging, Crate Wire, Retaining wall of pond and Pucca Open Channel Structures at Vill. Suna and Mehdood under Sub Division Mahilpur, at Vill. Koi, Chak Fala, Toe Makhowal, Gagg Jallon and Haler under Sub Division Dasuya and at Vill. Chatarpur, Fatehpur, Dharampur and Labbar under Sub Division Talwara
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost 9171700
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
1. Stone Masonry Water Recharging and Crate Wire Structure
Village Suna Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 7652 dated 20/05/2026 Amount = 23,34,900/- o/o CCS Punjab, Chandigarh
1.1 Stone Masonry Water Recharging structures 1 & 2
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 153.54 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 26.29 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 191.4 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 & 12.25 as per PWD specifications. 106.13 Per Cum 6089.23 646219.53
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 25.61 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 197.3 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 0.99_ Per Cum 511.78 0.29_
1.2 Crate Wire structures 1 & 2
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 33.5 Per Cum 38.98
2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 54 Per Cum 1458.04
3 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 259.5 Per Sqm 197
4 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 259.5 Per Sqm 73.75
5 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 54 Per Cum 511.78
1.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6;X4' in size Complete in all respect) 1 no. 3000
TOTAL (A) SAY = 2334900
2. Stone Masonry Water Recharging and Crate Wire Structure
Village Mehdood Tehsil Garhshankar & Distt. Hoshiarpur
Estimate Sanction No. 7660 dated 20/05/2026 Amount = 17,94,200/- o/o CCS Punjab, Chandigarh
2.1 Stone Masonry Water Recharging structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 96.35 Per Cum 38.98
2 C.C. 1:8:16 in foundation with 40 mm gauge stone aggregate CSR 10.6(b)(ii) as per PWD specifications. 15.9 Per Cum 3433.35
3 Squared Rubbled Masonary 1:5 Below ground level CSR 12.17 127.6 Per Cum 5602.51
4 Square rubble boulder masonary 1:5 above ground level CSR 12.17 & 12.25 as per PWD specifications. 78.38 Per Cum 6089.23
5 Cement concerete 1:2:4 with stone aggregate CSR 10.13 a(i) as per PWD specifications. 15.82 Per Cum 5058.9
6 Plaster 1:4 12.5 mm thick CSR 15.9 as per PWD specifications. 127.21 Per Sqm 213.54
7 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 226.58 Per Cum 511.78
2.2 Crate Wire structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 58 Per Cum 38.98
2 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 100.5 Per Cum 1458.04
3 Weaving of wire mesh 15x15cm as per PWD specifications CSR 23.29 433.5 Per Sqm 197
4 Spreading of wire mesh 15x15cm as per PWD specifications CSR 23.37 433.5 Per Sqm 73.75
5 Extra Carriage of material like Boulder, Sand, Bajri, Gatka etc. 100.5 Per Cum 511.78
2.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6;X4' in size Complete in all respect) 1 no. 3000
TOTAL (B) SAY = 1794200
3. Stone Masonry Water Recharging Structure
Village Koi Tehsil Dasuya & Distt. Hoshiarpur
Estimate Sanction No. 7254 dated 15/05/2026 Amount = 10,60,000/- o/o CCS Punjab, Chandigarh
3.1 Stone Masonry Water Recharging structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w in excavation of foundation in gravel mix soil 50.5 Per Cum 38.98
2 Cement concerete 1:2:4 wall 2.6 Per Cum 0.99_
3 Laying of stone aggregate in foundation beds in 1:8:16 7.8 Per Cum 3433.35
4 Squared Rubbled Stone Masonary 1:5 Below Ground Level 35.46 Per Cum 5602.51
5 Squared Rubbled Stone Masonary 1:5 below plinth level 22.35 Per Cum 5602.51
6 Squared Rubbled Stone Masonary 1:5 above plinth level 41.55 Per Cum 6089.23
7 Plaster work 1:4 12.5 mm thick 72.69 Per Sqm 213.54
8 Filling of stones into wire crates hand pack as per PWD specifications 6 Per Cum 1458
9 Weaving of wire crates in size 15x15cm as per PWD specifications 26 Per Sqm 197
10 Spreading of wire crates as per PWD specifications 26 Per Sqm 73.75
3.2 Stone Masonry Water Recharging structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w in excavation of foundation in gravel mix soil 31.71 Per Cum 38.98
2 Cement concerete 1:2:4 wall 1.76 Per Cum 0.99_
3 Laying of stone aggregate in foundation beds in 1:8:16 5.12 Per Cum 3433.35
4 Squared Rubbled Stone Masonary 1:5 Below Ground Level 21.11 Per Cum 5602.51
5 Squared Rubbled Stone Masonary 1:5 below plinth level 14.24 Per Cum 5602.51
6 Squared Rubbled Stone Masonary 1:5 above plinth level 25.24 Per Cum 6089.23
7 Plaster work 1:4 12.5 mm thick 56.39 Per Sqm 213.54
8 Filling of stones into wire crates hand pack as per PWD specifications 4.7 Per Cum 1458
9 Weaving of wire crates in size 15x15cm as per PWD specifications 20.8 Per Sqm 197
10 Spreading of wire crates as per PWD specifications 20.8 Per Sqm 73.75
3.3 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6;X4' in size Complete in all respect) 2 no. 3000
TOTAL (C) SAY = 1060000
4. Crate Wire Structure
Village Chak FalaTehsil Dasuya & Distt. Hoshiarpur
Estimate Sanction No. 934 dated 27/05/2026 Amount = 2,80,500/- o/o COS, SAS Nagar
4.1 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation 65 Per Cum 38.98
2 Weaving of wire mesh 15x15cm as per PWD specifications 407.6 Per Sqm 197
3 Spreading of wire mesh 15x15cm as per PWD specifications 407.6 Per Sqm 73.74
4 Filling of stones into wire crates hand pack 115 Per Cum 1458
TOTAL (D) SAY = 280500
5. Crate Wire Structures
Village Dharampur Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 452 dated 28/04/2026 Amount = 4,93,100/- o/o COS, SAS Nagar
5.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 82.8 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 739 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 739 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 159 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 159 Per Cum 364.86
TOTAL (E) SAY = 493100
6. Crate Wire Structures
Village Chatarpur Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 127 dated 13/04/2026 Amount = 4,23,700/- o/o COS, SAS Nagar
6.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 68.63 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 611.25 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 611.25 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 140.63 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 140.63 Per Cum 337.94
6.2 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6;X4' in size Complete in all respect) 1 no. 3000
TOTAL (F) SAY = 423700
7. Crate Wire Structures
Village Labbar Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 657 dated 08/05/2026 Amount = 4,87,900/- o/o COS, SAS Nagar
7.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 79.5 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 735 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 735 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 157.5 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 157.5 Per Cum 337.94
7.2 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6;X4' in size Complete in all respect) 1 no. 3000
TOTAL (G) SAY = 487900
8. Crate Wire Structures
Village Fatehpur Tehsil Mukerian & Distt. Hoshiarpur
Estimate Sanction No. 130 dated 13/04/2026 Amount = 3,70,700/- o/o COS, SAS Nagar
8.1 Crate Wire Structures
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 62.63 Per Cum 38.98
2 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 541.25 Per Sqm 197
3 Spreading of wire crates as per PWD specifications CSR 23.37 541.25 Per Sqm 73.75
4 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 125.63 Per Cum 1458.04
5 Carriage of material like Boulder, Sand, Bajri, Gatka etc. 125.63 Per Cum 0.00_
8.2 Display Board
Sr. No. Particulars Qty unit Rate Amount
1 Display Board (6;X4' in size Complete in all respect) 1 no. 3000
TOTAL (H) SAY = 370700
9. Stone Masonry Retaining wall for pond protection
Village Toe Makhowal Tehsil Dasuya & Distt. Hoshiarpur
Estimate Sanction No. 1051 dated 05/06/2026 Amount = 7,48,900/- o/o COS, SAS Nagar
9.1 Stone Masonry Retaining wall
Sr. No. Particulars Qty unit Rate Amount
1 E/w in excavation of foundation of structure 69 Per Cum 35.82
2 Laying of stone aggregate in foundation beds in 1:8:16 11.04 Per Cum 3294.29
3 Cement concerete 1:2:4 0.999_ Per Cum 4919.84
4 Squared Rubbled Stone Masonary 1:5 129.375 Per Cum 5329.65
5 Inner Side Plaster 1:4 12.5 mm thick 77.625 Per Sqm 199.11
TOTAL (I) SAY = 748900
10. Stone Masonry Pucca Open Channel for Irrigation and Crate Wire Structure
Village Gagg Jallon Tehsil Dasuya & Distt. Hoshiarpur
Estimate Sanction No. 1049 dated 05/06/2026 Amount = 5,71,000/- o/o COS, SAS Nagar
10.1 Stone Masonry Retaining wall
Sr. No. Particulars Qty unit Rate Amount
1 E/w in excavation of foundation of structure 66 Per Cum 35.82
2 Laying of stone aggregate in foundation beds in 1:8:16 16.5 Per Cum 3294.29
3 Cement concerete 1:2:4 8.25 Per Cum 4919.84
4 Squared Rubbled Stone Masonary 1:5 36 Per Cum 5329.65
5 Inner Side Plaster 1:4 12.5 mm thick 90 Per Sqm 199.11
10.2 Crate Wire structure
Sr. No. Particulars Qty unit Rate Amount
1 E/w excavation 52.5 Per Cum 35.82
2 Weaving of wire mesh 15x15cm as per PWD specifications 384.75 Per Sqm 191.74
3 Spreading of wire mesh 15x15cm as per PWD specifications 384.75 Per Sqm 67.42
4 Filling of stones into wire crates hand pack 113.75 Per Cum 1427.49
TOTAL (J) SAY = 571000
11. Stone Masonry Pucca Open Channel for Irrigation
Village Haler Tehsil Dasuya & Distt. Hoshiarpur
Estimate Sanction No. 1060 dated 05/06/2026 Amount = 6,06,800/- o/o COS, SAS Nagar
11.1 Stone Masonry Retaining wall
Sr. No. Particulars Qty unit Rate Amount
1 E/w in excavation of foundation of structure 0.99_ Per Cum 35.82
2 Laying of stone aggregate in foundation beds in 1:8:16 27.39 Per Cum 3176.3
3 Cement concerete 1:2:4 13.64 Per Cum 4801.17
4 Squared Rubbled Stone Masonary 1:5 79.68 Per Cum 5329.65
5 Inner Side Plaster 1:4 12.5 mm thick 124.5 Per Sqm 199.11
TOTAL (K) SAY = 606800
GRAND TOTAL (A+B+C+D+E+F+G+H+I+J+K) =
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
DNIT6.pdf
Tender Documents • 0.51 MB
FinBid.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .