Loading…
Loading…
Tender Value
₹1.4 Cr
EMD Value
₹2.9 L
Closing Date
27 Jul 2026, 12:00 pm
DIRECTOR GENERAL (ROADS)
CHAPLIN BHAVAN, 5/1, CHOWRINGHEE PLACE KOLKATA-700 013
REPAIRING OF DAMAGED ROAD AT RAJA RAMMOHAN SARANI FROM HRISHIKESH PARK PUMPING STATION TO THE JN. OF SURYA SEN STREET UNDER BR- IV AND V.
2026_KMC_1029169_1
KMC/ROADS/2026-2027/73
Open Tender
CIVIL WORKS
60 days
RAJA RAM MOHAN SARANI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.9 L
Chamber of DG(Roads)
24 Jun 2026
24 Jun 2026
29 Jul 2026
24 Jun 2026
27 Jul 2026
24 Jun 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoil not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works | 6,848.41 | M3 | 89.9 | ₹6,15,671.88 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. | 1,798.88 | M3 | 1,400.03 | ₹25,18,485.97 |
| 3 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) ( Ref :PWD (Rds & Brdgs)-2018, It. No. 4.09 Page No.247 & page-222 sl. No- 2 & 5 (g)) | 1,124.3 | M3 | 2,130.8 | ₹23,95,658.44 |
| 4 | Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site, laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting. guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work) , page-249(item-4.12) & 212(table3.3-1) and 4th Addenda & Corrigenda) | 1,114.3 | M3 | 2,421.44 | ₹26,98,210.59 |
| 5 | PRIME COAT Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i)For WBM / WMM Surface:...(with primer @ 0.70-1.0 kg/sqm)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.01)) | 4,497.2 | SQM | 28.92 | ₹1,30,059.02 |
| 6 | Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular Surfaces treated with primer (Using Bitumen Emulsion at the rate of 0.25 to 0.30 kg per sqm.)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02)) | 4,372.2 | SQM | 10.17 | ₹44,465.27 |
| 7 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed.
(a) By manual means :
(ii) From 50 mm to 100 mm thick. ( Ref :PWD (Rds & Brdgs)-2018, It. No. 18.02 Page No.331) | 1,425 | SQM | 30.4 | ₹43,320 |
| 8 | Tack Coat Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.)(Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02)) | 6,097.2 | SQM | 9.36 | ₹57,069.79 |
| 9 | DENSE BITUMINOUS MACADAM [Using Bitumen VG-40 (30/40)] Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregate of specified grading, filler(Cement /hydrated lime / Rock dust) premixed with bituminous binder of approved grade @4.0% (min) for Grading -1 and 4.5% (min) for Grading -2 by weight of total mix as per table 500-10 and mix design done as per table 500-11 and job mix formula as per clause 505.3.3 of MoRT&H (5th Revision), including screening, cleaning of chips, transporting the hot mix to work site, laying the mixed materials at specified laying temperature, as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 Mpa, to achieve the desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges of machinery and equipment for construction and quality control complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.) (i) Using Batch Type HMP of minimum capacity 100-120 TPH. (Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table-3.3-1) & 253(item 5.05)./ 8th Addenda & Corrigenda , SOR:2018,7th Addenda & Corrigenda SOR 2018) | 354.92 | M3 | 7,500.3 | ₹26,61,968.97 |
| 10 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. ( Ref :Rate based on PWD Current SOR. [PWD(B)2017,p-303]) | 250 | MTR | 8.17 | ₹2,042.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
FORM.pdf
Tender Documents • 0.85 MB
BOQ_2527640.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid