Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
19 Oct 2026, 4:00 pmDue tomorrow
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Bangalore International Airport Limited
Published by the portal on this tender, for queries and grievance redressal.
SITC Of New FSS Implementation at NEC,PHN,SS3-Battery and UPS Rooms
RFX0000635
SAFETY & SECURITY
Karnataka
28 Sept 2026
28 Sept 2026
28 Sept 2026
Amount
ADDRESSABLE FIRE PANEL NFS2-640 ( Notifier Inspire Series 2 Loop Panel including network card (N16)
Addressable Control Modules-FCM-1 (Notifier FCM/1)
Relay Module (AHU Tripping) (Notifier FRM/1)
Addressable Control Modules-FMM-1 (Notifier FMM/1)
Control Module FCM-1 (Notifier FCM-1-REL)
Agent release station - NBG-12LRA (NBG-12LRA (Inbuild abort & Release switch)
Sounder Strobe P2RL-K (P2RLED-System Sensor Make)
Notifier 9 Series Detector FSP 951P (FSP/951T+WHITE)
Response Indicator (Response Indicator(RI))
Isolator Module-IXO-X (Isolator Module - ISO/X)
Key Switch
FRLS 1.5X2SQMM TWISTED CORE CABLE
FSS CYLINDERS (34 Litres Capacity Seamless Cylinder CCOE Approved, complete with valve)
FSS CYLINDERS (80 Litres Capacity Seamless Cylinder CCOE Approved, complete with valve)
GAS NOVEC1230 (FK-5-1-12 Fire Protection fluid compound of carbon, fluorine and oxygen)
24VDC SOLENOID VALVE COIL (Electric Control Head operated electrically from the Detection & Control System)
FSS ACCESSORIES (Discharge Nozzles are designed to provide the proper flow rate and distribution - 6 NO Discharge Hose, 1-1/2" (use with 34, 80, 120 Ltr. Cylinders)-3 NO Manifold Supervisory Switch for indication of discharge of system - 3 N0 Cylinder Protective Cap for 42 Bar System-3 NO Cylinder Strap for 34 Ltr. Cylinder-2 NO Cylinder Strap for 80 Ltr. Cylinder-6 N)
Novec Piping-Sch40 (SITC of piping)
FSS ACCESSORIES (Pipeline pressure test (nitrogen))
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
General Guidelines.pdf
Guideline • 0.19 MB
BOQ_FSS ADDRESSABLE FIRE PANEL NFS2-640.xlsx
Guideline • 0.01 MB
Scope of work FSS_Installation.docx
Guideline • 0.06 MB
RFX0000635 -Guidelines.docx
Guideline • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .