Tender Value
₹26.2 L
EMD Value
₹26,200
Closing Date
26 Sept 2022, 2:00 pmClosed
CE / TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler from 08 10 2022 to 31 03 2023 or till the date of completion of entire quantity whichever comes earlier.
2022_EB_250557_1
CE/TTPS/SE/M-II No.238/2022-2023
Open Tender
Miscellaneous Works
Item Rate
175 days
TTPS
As per BQR conditions in NIT
7 documents required · 7 mandatory
₹0
₹26,200
Yes
6 Feb 2023
8 Sept 2022
27 Sept 2022
8 Sept 2022
26 Sept 2022
8 Sept 2022
Charges for identification, rectification of tube puncture up to 10 Joints including Arc filling by spool piece, edge preparation and assisting for hydraulic test including IBR welding charges.
Charges for additional joint of tube size between 44.5 to 76.1mm OD exceeding 10 joints.
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for boiler tube replacement work and removal of sky climber, return back to stores after completion of works.
Charges for Shifting the position of sky climber inside the furnace for Boiler tube replacement and erosion fill up work inside the furnace.
Charges for water washing of boiler inter-pass area (area inclusive of re-heater coils, water wall Screen tubes, S.H Screen tubes etc.)
Charges for IBR welder for Arc filling of area 150 x 25 M2 area for 3 layers
Charges for fin welding by cleaning, surface preparation and welding.
Removal & relaying of Insulation and Re fixing Skin casing inclusive of necessary Scaffolding arrangements for replacement of failed tubes & bends in pressure parts.
Charges for providing refractory in the pressure parts tubes where ever necessary including transportation of refractory from stores and water from 0 m level to the required elevation, etc complete.
STEBY ENTERPRISES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .