| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAccepted-Finance | L1 | Accepted-Finance Lowest Bidder | |
| 2 | L2₹43.4 L+₹9.6 L (28.2%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹46.7 L+₹12.9 L (38.1%)Rejected-Finance | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹47.8 L+₹13.9 L (41.1%)Rejected-Finance C 204 NANGLI EXTN NEW DELHI | WEST | DELHI | 110043 | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹48.4 L+₹14.5 L (43.0%)Rejected-Finance D 154 ADARSH NAGAR NARMADA ROAD JABALPUR 482001 M P | JABALPUR | MADHYA PRADESH | 482001 | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | M/S Malik Construction Corporation L2 | S GOURAV PRAKASH ENTERPRISES L4 | R.P Builders L3 | R C Sharma and Co L1 | RADHEY CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for rendering 10 mm thick with ready mix plaster on stone masonary surface/ other than fair faces surfaces finished even and smooth without using extra cement including taking down existing cement plaster complete all as specified & as directed.
Note: Rate for scaffolding arrangement to carry out the work upto 4 storey building deemed to be included in the quoted rate. | 250 | Sqm | 180 ₹45,000 | 198 ₹49,500 | 140 ₹35,000 Lowest | 150 ₹37,500 | 140 ₹35,000 Lowest |
| 2.00 | M&L for rendering 5 mm thick with ready mix plaster on stone masonary surface/ other than fair faces surfaces finished even and smooth without using extra cement including taking down existing cement plaster complete all as specified & as directed.
Note: Rate for scaffolding arrangement to carry out the work upto 4 storey building deemed to be included in the quoted rate. | 100 | Sqm | 250 ₹25,000 | 250 ₹25,000 | 140 ₹14,000 | 155 ₹15,500 | 120 ₹12,000 Lowest |
| 3.00 | M&L for complete removal of existing treatment (OBD/oil paint/white wash etc) by scrapping with mechanical wall sander on wall/ceiling (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 80 grit having dia of 7"/9" to make the surface free from dust, loose paint, removal of nails etc & filling cracks/hole & windows/doors jambs repair in good shape by skilled labour and M&L for two coats of oil bound distemper over and including cement base wall care putty @ 1 Kg (undiluted) per sqm of average thickeness 1 mm over and including primer the plastered/old painted wall/ceiling after scrapping to prepare the surface with mechanical wall sander (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 240 grit or above to make the surface free from dust etc. by skilled labour as per following steps:-
Step - 1) Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute.
Step - 2) Applying the first coat the prepared mixer with the help of fully autometic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a miximum pressure 3300 PSI
Step - 3) Allow 6-8 hrs time to dry the putty surface. | 21,000 | Sqm | 32 ₹6,72,000 | 51 ₹10,71,000 | 33 ₹6,93,000 | 20 ₹4,20,000 Lowest | 36 ₹7,56,000 |
| 4.00 | M&L for preparation of old painted surfaces of wood & wood based surface of any description not otherwise described over 10 cm width & girth and applying one coat of synthetic enamel paint complete all as specified and as directed. | 500 | Sqm | 25 ₹12,500 Lowest | 25 ₹12,500 Lowest | 40 ₹20,000 | 65 ₹32,500 | 25 ₹12,500 Lowest |
| 5.00 | M&L for preparation of old painted surfaces of steel & steel based surface of any description not otherwise described over 10 cm width & girth and applying one coat of synthetic enamel paint complete all as specified and as directed. | 800 | Sqm | 25 ₹20,000 Lowest | 25 ₹20,000 Lowest | 30 ₹24,000 | 52 ₹41,600 | 25 ₹20,000 Lowest |
| 6.00 | M&L for preparation of newly plastered surfaces of wall/ceiling sufraces and applying 1mm thick (average thickness) waterproof cement based putty and thereafter apply two coats of oil bound distemper on wall/ceiling surfaces over a coat of primer and using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 Mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and as directed. | 350 | Sqm | 25 ₹8,750 Lowest | 55 ₹19,250 | 40 ₹14,000 | 85 ₹29,750 | 30 ₹10,500 |
| 7.00 | M&L for preparation of old plastered surfaces of wall/ceiling thereafter filling of holes and cracks with wall care putty to obtain an even and smooth wall surface and applying one coat of white wash alongwith including scaffolding arrangement, trestles, ladders complete all as specified and as directed. | 600 | Sqm | 15 ₹9,000 | 15 ₹9,000 | 10 ₹6,000 Lowest | 25 ₹15,000 | 15 ₹9,000 |
| 7.01Notes:- Applicable to srl item No 3.00 to 7.00 (a) The smart periodical work under this contract shall be executed by manufacturers authorized applicator after approval of name of manufacturar's by GE. (b) The contractor shall produce the name brandof material and it manufacurar's within 10 days from the date of award of tender. After approval of paint manufracturer and product brand, the contractor shall produce a "Memorandum of Understanding" (MoU) between contractor, applicator and the manufacturer within 28 days from the award of of tender date or before commencement date of work. wherein the manufacturer shall own the responsibility of use premium quality products in adequate quality and workmanship. The Contractor shall also produce purchase Vouchers/Invoice for all product/materialutilised in work for their full quantity and Engineer-in-charge shall ensure to kept in record duly defaced& verified. (c) Sanding of surfaces shall be carried out by mechanical sander having speed 1500–2700 RPM with internal dust extraction system to maintain clean environment and certified by paint manufacturer. (d) Electrical fittings such as tube lights, bed lights, switch boards etc. shall be carefully taken down before commencement of painting work and refixed after completion of painting work. (e) Furnitures in the quarters shall be shifted and stored in one room before commencement of painting work and rearranged to original position after completion of work. (f) Entire quarters including flooring, doors and windows shall be cleaned by the contractor after completion of painting work. (g) The rates quoted by the tenderer shall be deemed to include all the above provisions and nothing extra shall be paid on this account. | ||||||||
| 8.00 | Taking down chowkhats or frames with shutter exc. 1.5 sqm and n exc.4.00 Sqm each but without taking off shutters from the frame including make good disturb portion as the existing surfaces complete all as specified and as directed. | 15 | Each | 50 ₹750 Lowest | 200 ₹3,000 | 100 ₹1,500 | 200 ₹3,000 | 180 ₹2,700 |
| 9.00 | Taking down chowkhats or frames with shutter n exc 1.5 sqm each including making good disturb portion as per the existing surfaces complete all as specified and as directed. | 50 | Each | 50 ₹2,500 Lowest | 100 ₹5,000 | 110 ₹5,500 | 200 ₹10,000 | 180 ₹9,000 |
Tender Value
₹48.5 L
EMD Value
₹97,000
Closing Date
28 Aug 2026, 6:00 pmClosed
GE South Delhi Cantt-10
GE South Delhi Cantt-10
WELCOME MAINT AND OTHER CONNECTED B/R AND E/M WKS FOR OFFICERS MD ACCN AT VIKRAM VIHAR UNDER AGE B/R-I AND AGE E/M OF GE (SOUTH), DELHI CANTT-10
2026_MES_781941_1
GE/TOKEN-46/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE South Delhi Cantt
As per Tender Documents
11 documents required · 11 mandatory
₹500
GE South Delhi Cantt
₹97,000
Yes
8 Oct 2026
31 Jul 2026
31 Aug 2026
31 Jul 2026
28 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for rendering 10 mm thick with ready mix plaster on stone masonary surface/ other than fair faces surfaces finished even and smooth without using extra cement including taking down existing cement plaster complete all as specified & as directed.
Note: Rate for scaffolding arrangement to carry out the work upto 4 storey building deemed to be included in the quoted rate. | 250 | Sqm | 1.25 | ₹312.5 |
| 2 | M&L for rendering 5 mm thick with ready mix plaster on stone masonary surface/ other than fair faces surfaces finished even and smooth without using extra cement including taking down existing cement plaster complete all as specified & as directed.
Note: Rate for scaffolding arrangement to carry out the work upto 4 storey building deemed to be included in the quoted rate. | 100 | Sqm | - | - |
| 3 | M&L for complete removal of existing treatment (OBD/oil paint/white wash etc) by scrapping with mechanical wall sander on wall/ceiling (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 80 grit having dia of 7"/9" to make the surface free from dust, loose paint, removal of nails etc & filling cracks/hole & windows/doors jambs repair in good shape by skilled labour and M&L for two coats of oil bound distemper over and including cement base wall care putty @ 1 Kg (undiluted) per sqm of average thickeness 1 mm over and including primer the plastered/old painted wall/ceiling after scrapping to prepare the surface with mechanical wall sander (having mechanical vaccum mechanism) having RPM not less than 1500, sanding pad of 240 grit or above to make the surface free from dust etc. by skilled labour as per following steps:-
Step - 1) Mix the putty powder by adding water as per manufacturer instructions and mix it with putty mixer with the mixing capacity of min 2.5 kg putty per minute.
Step - 2) Applying the first coat the prepared mixer with the help of fully autometic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a miximum pressure 3300 PSI
Step - 3) Allow 6-8 hrs time to dry the putty surface. | 21,000 | Sqm | - | - |
| 4 | M&L for preparation of old painted surfaces of wood & wood based surface of any description not otherwise described over 10 cm width & girth and applying one coat of synthetic enamel paint complete all as specified and as directed. | 500 | Sqm | - | - |
| 5 | M&L for preparation of old painted surfaces of steel & steel based surface of any description not otherwise described over 10 cm width & girth and applying one coat of synthetic enamel paint complete all as specified and as directed. | 800 | Sqm | - | - |
| 6 | M&L for preparation of newly plastered surfaces of wall/ceiling sufraces and applying 1mm thick (average thickness) waterproof cement based putty and thereafter apply two coats of oil bound distemper on wall/ceiling surfaces over a coat of primer and using Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 Mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure and paint usage and certified by paint manufacturer and accessories for applying distemper should be able to spray in hard to reach areas and penetration of distemper on the surface complete all as specified and as directed. | 350 | Sqm | 11 | ₹3,850 |
| 7 | M&L for preparation of old plastered surfaces of wall/ceiling thereafter filling of holes and cracks with wall care putty to obtain an even and smooth wall surface and applying one coat of white wash alongwith including scaffolding arrangement, trestles, ladders complete all as specified and as directed. | 600 | Sqm | 10 | ₹6,000 |
| 8 | Taking down chowkhats or frames with shutter exc. 1.5 sqm and n exc.4.00 Sqm each but without taking off shutters from the frame including make good disturb portion as the existing surfaces complete all as specified and as directed. | 15 | Each | 1.25 | ₹18.75 |
| 9 | Taking down chowkhats or frames with shutter n exc 1.5 sqm each including making good disturb portion as per the existing surfaces complete all as specified and as directed. | 50 | Each | 1.25 | ₹62.5 |
| 10 | Taking down shutter of any description exc 1.00 sqm nexc 2.00 sqm each complete all as specified and as directed. | 32 | Per leaf | 1.25 | ₹40 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_875982.xls
BOQ • 0.36 MB
TenderpagesT46.pdf
Tender Documents • 1.22 MB
SoC46.pdf
Additional Documents • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .