Tender Value
₹100.0 L
EMD Value
₹2.0 L
Closing Date
29 Aug 2026, 2:00 pm2d left
BLOCK DEVELOPMENT OFFICER
SABANG DEVELOPMENT BLOCK
Development of Collage ground at Sabang Sajani Kanta Mahavidyalay Mouza-Lutunia,JL no-123,Plot no-007, G.P.-debhog, Under Sabang Development Block in the Dist of Paschim Medinipur.
2026_ZPHD_5018614_1
WB/PMZP/SBG/NIET-007/2026-27 3RD CALL
Open Tender
CIVIL WORKS
Percentage
365 days
DEBGOG
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
₹2.0 L
Yes
13 Aug 2026
13 Aug 2026
31 Aug 2026
13 Aug 2026
29 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm depth and disposal of the rubbish within a lead upto 75 m as directed. | - | Sqm | 10 | - |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. | - | Cum | 119.27 | - |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. | - | Cum | 192.38 | - |
| 4 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by through Saturation with water,ramming complete including the cost of supply of sand (Payment to be made on measurement of finished quantity) | - | Cum | 599.61 | - |
| 5 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) | - | Cum | 77.54 | - |
| 6 | Cement concrete with Graded Stone ballast(40mm. Size) Excluding shuttering,if any ground floor(A) Pakur Variety(a)1:3:6 | - | Cum | 5,079.44 | - |
| 7 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety | 0.4 | Cum | 5,998.75 | ₹2,399.5 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. | 1 | Sqm | 55,394.04 | ₹55,338.65 |
| 9 | Brick work with 1st class bricks in cement mortar (1:6) | - | Cum | 5,317.06 | - |
| 10 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 0.6 | Sqm | 697.51 | ₹418.51 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_5089791.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].