Loading…
Loading…
Tender Value
₹12.1 L
EMD Value
₹24,202
Closing Date
27 Jul 2026, 3:00 pmDue tomorrow
Chief Executive Officer
Chief Executive Officer, South Goa Zilla Panchayat, Old Collectorate Bldg., 3rd Floor, Margao-Goa
Construction of badminton court near Shree Sateri Gramdevi Temple at Assolda in V.P. Assolda of Xeldem Constituency
2026_ZP_30456_1
3/6/SGZP/2026-27/TN-190/L28
Open Tender
Civil Works - Buildings
Percentage
120 days
V.P. Assolda
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹24,202
17 Jul 2026
17 Jul 2026
29 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding as directed in: (a) All kinds of soil | 144 | cu.m | 286 | ₹41,184 |
| 2 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. (a) All kinds of soil | 11 | cu.m | 291 | ₹3,201 |
| 3 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 37.5 | cu.m | 2,211 | ₹82,912.5 |
| 4 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in:(a)All works upto plinth level | 25 | cu.m | 6,325 | ₹1,58,125 |
| 5 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level | 8.1 | cu.m | 6,810 | ₹55,161 |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 15.9 | cu.m | 5,186 | ₹82,457.4 |
| 7 | Cement concrete flooring 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement. C) 75 mm thick | 240 | sq.m | 636 | ₹1,52,640 |
| 8 | Steel work welded (SAIL, TATA. VIZAG & using electrodes of Ador or ES4B or Deh Secheron make only)in built up sections trusses and framed work including cutting, hoisting, fixing in position and applying priming coat of red lead paint. (b) In tees, angles, flats and channels | 20.32 | Qtl | 13,023 | ₹2,64,627.36 |
| 9 | Providing and fixing G.I. chain link mesh 6.35cm x 6.35 cm x 10 gauge (2.5” x 2.5” x 10 gauge) fixed with angle iron posts and struts by G.I. or M.S. staples at 20cms apart with welding with the iron posts (placed at 3 meters centre to centre) including providing barbed wire stiffeners | 138 | sq.m | 285 | ₹39,330 |
| 10 | 12mm cement plaster 1:4 (1 cement : 4 fine sand) | 77 | sq.m | 223 | ₹17,171 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 1.82 MB
Tendernotice_3.pdf
PDF • 0.85 MB
BOQ_30869.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].