SE ETC UPPTCL GREATER NOIDA
400 KV SUB STATION PALI GAUTAM BUDH NAGAR GREATER NOIDA
ELECTRICAL WORK
2020_UPTCL_430874_1
T-226/2019-20ETC/GN
Open Tender
Electrical Works
Fixed-rate
15 days
BULANDSHAHR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ELECTRICITY 400 KV SUB STATION GREATER NOIDA
₹3,000
10 Feb 2020
4 Feb 2020
10 Feb 2020
4 Feb 2020
10 Feb 2020
4 Feb 2020
Amount
The work of intallation of 63MVA, 132/33kV Technical Associate make transformer in place of defective T&R make 63MVA, 132/33kV Transformer at 220kV Sub-Station Sikandrabad. The work involves as following- Shifting of new 63 MVA 132/33 KV T/F from unloaded place to towards plinth up to 20 mtr Distance including turning to tank, including all T & P and work required to complete the job satisfactory.
Complete erection of new 63 MVA T/F by erection of radiators, conservator tank, all bushing, their turrets, connecting all pipe line, cooling fans, motor driver mechanism of tap changer, RTCC panels, and associated oil pipe lines etc. to complete the job satisfactory including first filing of oil the topping of Transformer oil (Not circulation) in tank, radiators, oil pipe lines, conservator tank etc. and other associated works for satisfactorily completion of work. No, department crane/ T & P shall be provided.
Centrifuging of complete oil (Aaprox. Qty 25KL) in T/F by connecting centrifuging pipes circulating the T/F oil through centrifuging machine to be provided by the contractor and taking the BDV and IR value of the oil and Transformer periodically till the required value is achieved as per direction of supervising engineer. The work includes all the work related to centrifuging the Oil and filling the oil in T/F tank.
Termination of cable in 63 MVA to RTCC Marshalling box, DM box and CR panel after re-ferruling and redressing as per drawing and instruction of suppervising engineer after tracing of existing control cable and laying of new cable if required.
Making of additional new delta point below the ground lavel of 1000mm for earthing of new transformer by three 5100mm electrode having 100 conical shape and insurt in to earth vertically by hammering or bore. Connect these electrode by 75x10mm MS flat to make delta of electrode. (MS Electrode and MS flat provided by the department)
Earthing of T/F body, MB DM box OLTC, RTCC at two points using 75x10/50x6mm M.S. flat with connecting earthmat grid as per spacification. Make the proper earthing of transformer neutral from new delta point. ( MS flat provided by the department). Make proper paint on earth flat with one coat of red oxide and two coat of enamal bus green paint.
Jumpering of T/F from HV with single Zebra/Panther and LV side with double zebra complete up to 33 KV main bus and replaced the same if required.
SUN ENGINEERING WORKS
Perfect Power Transformer Associates
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .