| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.3 LAccepted-AOC SHIVNANDANPUR SHANTINAGAR VISHRAMPUR SURAJPUR CHHATTISGARH 497226 | VISHRAMPUR | SURAJPUR | CHHATTISGARH | 497226 | ₹31.3 L Quoted ₹26.5 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹27.3 L+₹80,402.66 (3.03%)Rejected-Finance SHANTINAGAR BISHRAMPUR DISTT SURAJPUR C G | BISHRAMPUR | SURAJPUR | CHHATTISGARH | ₹27.3 L+₹80,402.66 (3.03%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹27.3 L+₹82,272.49 (3.10%)Rejected-Finance | ₹27.3 L+₹82,272.49 (3.10%) | L3 | Rejected-Finance Being L3 |
| 4 | Rejected-Technical MAIN ROAD FAUJI GALI P O BISHRAMPUR DISTT SURAJPUR C G PIN 497226 | BISHRAMPUR | SURAJPUR | CHHATTISGARH | 497226 | - | - | Rejected-Technical Turnover document not as per NIT/BSC |
Tender Value
₹55.2 L
EMD Value
₹69,000
Closing Date
26 Feb 2026, 5:00 pmClosed
Staff Officer (Civil)
GM office SECL Bishrampur Area
Heightening of existing Hume pipe culvert over Jobga nallah at RGK Sub Area of Bishrampur Area
2026_SECL_352852_1
GM/BSPR/Civil/e-tender/ 2025-26/49 Dt.10.02.2026
Open Tender
Civil Works - Others
Percentage
150 days
Bishrampur Area
As per NIT and GCC
5 documents required · 5 mandatory
₹69,000
19 Jun 2026
11 Feb 2026
28 Feb 2026
11 Feb 2026
26 Feb 2026
12 Feb 2026
11 Feb 2026 - 19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 21.51 | cum | 215.05 | ₹4,625.73 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1.44 | cum | 4,731.65 | ₹6,813.58 |
| 3 | Providing and laying in position specified grade of Reinforced cement concrete work l, excluding the cost of centering, shuttering finishing and reinforcement All work up to plinth level with 1:1.5:3 (1cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size. | 74.03 | cum | 6,630.23 | ₹4,90,835.93 |
| 4 | Reinforced cement concrete work in walls,( in all thickness), including attached plister,buttress, plinth and string coarse, fillets,columns,pillers,piers, abutments,post and struts// etc. upto floor five level, excluding the cost of centering, shuttering fibnishing and reinforcement 1:1.5:3 (1cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size. | 40.66 | cum | 7,994.7 | ₹3,25,064.5 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 3.73 | cum | 8,382.59 | ₹31,267.06 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 59.07 | sqm | 266.92 | ₹15,766.96 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 229.02 | sqm | 574.12 | ₹1,31,484.96 |
| 8 | Centering and shuttering including strutting propping etc.and removal of form for column | 30.6 | sqm | 689.06 | ₹21,085.24 |
| 9 | Providing and laying in position specified grade of plain cement concrete work l, excluding the cost of centering, shuttering fibnishing and reinforcement All work up to plinth level with 1:1.5:3 (1cement:1.5 coarse sand:3 graded stone aggregate 20mm nominal size. | 40.68 | cum | 6,708.59 | ₹2,72,905.44 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 37.26 | sqm | 529.09 | ₹19,713.89 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 1.35 MB
Tendernotice_3.pdf
PDF • 0.28 MB
BOQ_365645.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .