Loading…
Loading…
Tender Value
₹25.7 L
EMD Value
₹51,400
Closing Date
29 Jun 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
ST CON CKP
2 conditions
Please check once all the attachment before submitting the final offer.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
:Provision of Telecom installation in connection with " Augmentation of ELS/TATA for increasing holding from 150 to 200 Loco in CKP division of S.E.Railway.
ST_CON_ROU_ELS_TATA_LAN
ST_CON_ROU_ELS_TATA_LAN
Open
Works - General
6 Months
Unknown (Unspecified Location)
₹0
₹51,400
29 Jun 2026
2 Jun 2026
15 Jun 2026
122 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 356159.43 Below/P | ||
| — | Numbers | — | — | ||
| Installation, splicing and commissioning of Fibre Distribution Management system (FDMS) for 12 Fiber complete with all accessories with patch cord & pigtail as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor. | — | — | — | 25,032 | |
| — | Numbers | — | — | ||
| Installation, splicing and commissioning of Fibre Distribution Management system (FDMS) for 24 Fiber complete with all accessories such as patch cord & pigtail etc. as per TEC Spec. with latest amendment. The sundry material if required any to be supplied by contractor. | — | — | — | 8,032 | |
| — | Kilometre | — | — | ||
| Excavation of trench in all kinds of soils including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. Depth 1.0 meter, Width 0.3 meter. | — | — | — | 79,869 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
telecomcirculars1.pdf
ATTACHMENT
techcircular2.pdf
ATTACHMENT
gcccorrslip1.pdf
ATTACHMENT
GCCCORRECTIONSLIP11BD.pdf GCC COR SLIP 11
ATTACHMENT
boardcircular.pdf
ATTACHMENT
JPOfordiggingwork.pdf
ATTACHMENT
GCC2022.pdf
ATTACHMENT
SpecialConditionsofcontract.pdf special conditions
ATTACHMENT
GCCCORRECTIONSLIP11BD.pdf
ATTACHMENT
SpecialConditionsofcontract.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .