Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC | L1 | Accepted-AOC Quoting Lowest Rate | |
| 2 | L2₹23.0 L+₹48,980 (2.17%)Rejected-Finance | L2 | Rejected-Finance Quoting Higher rate | |
| 3 | L3₹23.1 L+₹57,255 (2.54%)Rejected-Finance | L3 | Rejected-Finance Quoting Higher rate |
| Sl No | Description | Qty | Unit | P.S.Enterprise L1 | IRP Enterprise L2 | Hipotronics Engineers L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply, installation, testing & commissioning IGBT BASED DSP CONTROLED 15kVA UPS with on-line double conversion with PWM Hi-Frequency technology & 60 Mins Back-up 3phase input 3phase out put etc having following specification- | 3 | Item | 4,76,000 ₹14,28,000 Lowest | 4,85,760 ₹14,57,280 | 4,87,085 ₹14,61,255 |
| 1.01Topology- IGBT BASED DSP CONTROLED | ||||||
| 1.02Rating of UPS(KVA/KW): 15 KVA / 12 KW (Make: Switching AVO,Emerson,PowerOne, APC, NUMERIC, Schineder) | ||||||
| 1.03Input Voltage: 310----400----415 VAC 165-288 Volt /Phase(selectble) | ||||||
| 1.04Input Frequency: 45 to 65 Hz | ||||||
| 1.05Isolation Transformer: Inbuilt Isolation Transformer with 1:1 ratio at UPS Input to be provided at output | ||||||
| 1.06Back feed Protection: UPS should have back feed protection | ||||||
| 1.07Charging: Autometic float cum Boots Charging Capability with setteble flote & boost charging voltages and current levels and boots charger timer | ||||||
| 1.08Output Voltage: 380/400/415V 3PH + N( for 3 Phase), 220/230/240V ( for 1 Phase) | ||||||
| 1.09Output Voltage Regulation: Static Variation +/_ 1% and Dynamic variation +/-3% | ||||||
Tender Value
Refer Docs
EMD Value
₹41,000
Closing Date
7 Nov 2022, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Construction of Proposed Up-gradation of Rural Hospital to 100 bedded State General Hospital along with Residential Officers Staff Quarters at Sainthia, in the district of Birbhum--------------- SITC of UPS with Battery Bank.
2022_WBPWD_414563_1
WBPWD/SEWEC /BRED /NIQ-68 /2022-23
Open Tender
ELECTRICAL WORKS ORG
Item Rate
30 days
Birbhum
Please refer Tender documents.
5 documents required · 5 mandatory
₹41,000
Office of the Superintending Engineer, Western Ele
24 Jun 2026
14 Oct 2022
9 Nov 2022
14 Oct 2022
7 Nov 2022
18 Oct 2022
14 Oct 2022 - 17 Oct 2022
17 Oct 2022
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .