Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 5A 582 CALDWELL COLONY TUTICORIN 628008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
26 Feb 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE VGTPS
VGTPS, Ramanathapuram - 623536
Periodical, regular, running maintenance and Breakdown Maintenance of IA/PA Compressors
2021_EB_195538_1
SE/VGTPS/RMD/WC.NO.172/20-21
Open Tender
Miscellaneous Works
Works
180 days
VGTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,700
Yes
1 Mar 2021
12 Feb 2021
1 Mar 2021
12 Feb 2021
26 Feb 2021
12 Feb 2021
180 days
Amount
Periodical and Regular maintenance
Attending Periodical and running maintenance works in Instrument Air system: Charges for periodical maintenance of Instrument Air system, its drier units, IA/PA Cooling water system, Inspection & associated pipe lines, valves etc., attending air / water / oil leaks, maintaining lube oil level of IA / PA Compressors and its cooling water pumps, topped up if necessary, external cleaning of related equipment's and its auxiliaries and keeping clean & tidy and attending any minor defects as per the direction of Engineer - in -charge
Attending Periodical and running maintenance works in Process Air system: Charges for periodical maintenance of Nitrogen generation system, checking for proper operation of angle seat valve, Pressure control valve, 3 way tower change over valve,maintaining Nitrogen purity as per site requirement (attending minor instrument air / Nitrogen leaks), keeping clean & tidy as per the direction of Engineer - in –charge
Attending Periodical and running maintenance works in CCW circulation system: Charges for visual inspection of closed cooling water circulation pumps for any abnormal sound, temperature, mechanical seal / gland leaks , any water leaks in the pipe lines, valve packing leaks, vibration of piping , general checks. Up keeping of the CCW make up tank by maintaining the tank level and thorough external cleaning of CCW pump by removing the dusts and dirty oil. Check the lube oil level of the pump and topped up as per the direction of Engineer - in - charge.
Attending Periodical and running maintenance works in ACC system: Charges for visual inspection of Air-Cooled Condenser system, including ACC Fans, ACC Gear Boxes, ACC Heat Exchanger Bundles etc., observation for any abnormal sound, temperature, vibration, leaks etc, in the above system, external cleaning of ACC Gear Boxes, ACC lube oil pumps etc., attending leaks and minor defects in the above system, checking the oil level in all ACC gear boxes and topped up if necessary as per the direction of Engineer in-charge.
Attending Periodical and running maintenance works for inspection of Belt tension / replacement of belt in ACHE / IA PA compressor: Removal of IA/PA Compressor Belt, Belt tension inspection of ACHE / IA/PA Compressor, checking and replacement of new belt (belt will be supplied by the Board) if necessary, checking alignment and normalizing as per the direction of Engineer - in - charge
Attending Periodical and running maintenance works for replacement of Lubrication oil in IA PA compressor: Draining of oil from the oil sump of IA/PA Compressor, inspection, cleaning of the sump and filter element, replacing of filter element if necessary (oil filter will be provided by the Board) filling with lube oil and normalizing as per the direction of Engineer - in - charge
Attending Periodical and running maintenance works for cleaning of Suction filter in IA PA compressor: Disassembly of suction air filter of IA/PA Compressor, disassembly of suction pipe line from LP cylinder, inspection, thorough cleaning of suction air filter and suction pipe line, replacement of suction filter (suction filter will be supplied by the Board) if necessary, reassembling and normalizing as per the direction of Engineer - in - charge.
Attending Periodical and running maintenance works of 100 NB NRV in IA PA compressor: Charges for routine inspection of 100NB NRV in the discharge air line of the IA PA compressor, attending of minor rectification work , Replacement of NRV ( if necessary) as per the direction of Engineer - in - charge.
Special and Breakdown maintenance works
Breakdown maintenance work for Inter cooler / After cooler in IA PA compressor: Disassembly of inter cooler / after cooler and taking out tube nest from the shell, inspection, cleaning, leak checking by hydraulic testing, renewal of O rings, gaskets,(O rings, gasket etc., all be provided by the Board) reassembling and normalizing as per the direction of Engineer - in - charge
Breakdown maintenance work for Water jacket units in IA PA compressor: Disassembly of LP or HP water jacket inspection covers of IA/PA Compressor, cleaning the sump, renewal of gasket packing, reassembling and normalizing as per the direction of Engineer - in - charge
Breakdown maintenance works for cleaning and inspection of Valve plates in IA PA compressor: Disassembly of suction side and discharge side valve covers, valve plates of LP or HP cylinder of IA/PA Compressor, inspection, cleaning, Renewal / Rectification of valve plates assembly, re-assembly and normalizing as per the direction of Engineer - in charge.
Breakdown maintenance works for ovehauling of Cooling water pump in IA PA compressor: Disassembly of cooling water pump for IA/PA Compressor system, inspection of internal parts, cleaning, rectification / renewal of parts, re-assembly (gaskets, spares will be supplied by the Board), normalizing as per the direction of Engineer - in - charge.
Breakdown maintenance works for cleaning & inspection of Water cooling tower in IA PA compressor: Inspection of IA/PA cooling tower fans, cleaning the towers, basin and its valves and normalizing as per the direction of Engineer - in - charge.
Breakdown maintenance work for inspection & Replacement of Pressure Packing Rings in IA PA compressor: Disassembly of HP or LP cylinder outer cover and removal of piston and pressure packing rings cleaning and renewal of pressure packing rings assembling piston, adjusting the piston clearances, assembling the cylinder outer cover, normalizing as per the direction of Engineer - in - charge.
Breakdown maintenance works for overhauling of Lube oil gear pump in IA PA compressor: Disassembly of lube oil gear pump of IA PA compressor, inspection , cleaning , removal of spares if necessary reassembling and normalizing as per the direction of Engineer - in – charge.
Breakdown maintenance works for overhauling / inspection of Air drier system: Disassembly of inspection cover for Instrument Air dryer unit activated alumina tower, removal of activated alumina, cleaning of internals, refilling of new activated alumina and closing of inspection cover disassembly of prefilter and after filter, inspection, cleaning, assembly of filters supplied by the Board, disassembly and cleaning of purge control valve and change over valve and normalizing the operation of Instrument Air dryer unit as per the direction of Engineer - in charge.
Breakdown maintenance works for overhauling / inspection of PSA system: Disassembly of inspection cover for Process Air Nitrogen gas unit Carbon molyculer sieves tower, removal of Carbon molyculer sieves , cleaning of internals, refilling of new Carbon molyculer sieves ,if necessary and closing of inspection cover, disassembly of prefilter , inspection, cleaning, assembly of filters supplied by the Board, disassembly and cleaning of Pressure control valve and change over valve and normalizing the operation of Process Air Nitrogen gas unit as per the direction of Engineer - in charge.
Breakdown maintenance works for overhauling / inspection of Closed cooling water pump: Inspection / cleaning of 600 NB suction strainer by dismantling the strainer removing the fasteners, cleaning and reassembling (OR) inspection of 600 NB / 450 NB butterfly valve by replacing / attending any other unforeseen minor defects related to mechanical maintenance work, completion and normalizing as per the direction of Engineer- in-charge.
Breakdown maintenance works for cleaning & inspection of ACHE fans: Inspection of flywheel & motor pulley for any damages, alignment checking of motor pulley to flywheel & attending any other unforeseen minor defects related to mechanical maintenance work (OR) Fan top and bottom side grease packing of 8 Nos of fan, completion and normalizing as per the direction of Engineer - in - charge.
Breakdown maintenance works for overhauling of ACC Lube oil pump: Decoupling of ACC Lube oil pump from motor, disassembly of ACC lube oil pump, removing bearings and oil seals, inspection, cleaning and changing bearings, seals if necessary, asssembling of pump, check the operation of pump at workshop, assembling the pump at gear box, couple with motor, alignment checking and normalizing as per the direction of engineer in charge.
Breakdown maintenance works for inspection / Replacement of cone ring coupling in ACC Gear Box and motor: ACC Gear Box and motor pulley is removed from the motor shaft and inspection of the pully bolt with bushes and the damaged bushes are replaced by new bushes and the coupling inserted with bolt, coupled with motor and normalizing as per the direction of Engineer - in - charge.
Attending for minor Welding works in GT II / SD equipments / structure / pipe lines: Charges for attending any minor weld defects in pipe lines and support structures by welding , as per the direction of engineer in charge.
Decoupling and coupling of fan motors in ACC / ACHE fan: Attending breakdown works by Decoupling of ACC and ACHE vertical motors, removing the fasteners of motor bed, removal of coupling / pulley, replacement of coupling / bush / pulley if necessary (after lifting, shifting of motor by electrical team) allignment and coupling of motors to fecilitate electrical maintenance, motor rewinding / bearing replacement / motor replacement works by electrical maintenance wing.
Decoupling and coupling for motors in IA / PA compressor / CCW pump: Attending breakdown works by Decoupling of IA / PA compressor and CCW motors, removing the fasteners of motor bed and belt, removal of coupling / pulley, replacement of coupling / bush / pulley if necessary, after work completion, allignment checking and coupling of motors to facilitate electrical maintenance, motor rewinding / bearing replacement / motor replacement works by electrical maintenance wing.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .