| Sl No | Description | Qty | Unit | SBS&CO L1 | R SELVI L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and deposting on bank with initial lead of 10m& intial lift of 2m in hard stiff clay, stiff black cotton, hard red earth shales ,murram, gravel, stoney earth mixed with small size boulders etc completed as per std specification.SS20B | 38 | M3 | 219 ₹8,322 Lowest | 225 ₹8,550 |
| 2.00 | Supplying and filling in foundation and basement with filling sand in layers of not more than 15 cm thick well rammed consolidated etc. complete complying with standard specification . | 7 | M3 | 2,011 ₹14,077 Lowest | 2,020 ₹14,140 |
| 3.00 | Plain Cement concrete of mix 1:4:8 (One part of cement, four part of sand and eight part of aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour chargesetc., complete as per standard specification | 8 | M3 | 5,874 ₹46,992 Lowest | 5,880 ₹47,040 |
| 4.00Steel centering for sides and soffits including supports and strutting upto 1m height for plain surface such as RCC slab with all cross bracings using mild steel sheet of size 90cmx60cmx10 gauge stiffened with welded miled steel angles of size 25x25x6mm for laid over silver oak for coundary wood joints of size 10x6.5 cm spaced at about 90cm centre to centre and supported by casurials props of 10cm to 13 cm dia spaced at about 75cm centre to centre and suppor etc completed as per std specification. | |||||
| 4.01 | Ground Floor Columns | 24 | M2 | 1,302 ₹31,248 Lowest | 1,310 ₹31,440 |
| 4.02 | B) Grade beam | 38 | M2 | 525 ₹19,950 Lowest | 530 ₹20,140 |
| 4.03 | C) Lintel. Beam &slab | 91 | M2 | 1,085 ₹98,735 Lowest | 1,090 ₹99,190 |
| 5.00 | Supplying fabricating and placing in position of steel rods using TMT Steel ISI including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 1,700 | Kgs | 91.85 ₹1,56,145 Lowest | 92 ₹1,56,400 |
| 6.00 | Vibrated Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part of sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry for Reinforced Concrete Works including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete | 18.5 | M3 | 7,867 ₹1,45,539.5 Lowest | 7,870 ₹1,45,595 |
| 7.00 | Brick Work in Cement Mortor 1:5 Mix (one cement, five sand) using best Country III Class Bricks of size 8¾"x4¼x2¾ from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications | 32 | M3 | 7,544 ₹2,41,408 Lowest | 7,550 ₹2,41,600 |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
19 Aug 2025, 3:00 pmClosed
The Commissioner
The Commissioner,Devakottai Muncipality
CONSTRUCTION OF ANGANWADI CENTER AT WARD 6 SCHOOL IN DEVAKOTTAI MUNICIPALITY
2025_MAWS_591814_1
2025_MAWS_1(1)
Open Tender
Civil Works - Buildings
Lump-sum
Devakottai Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹15,000
Yes
6 Oct 2026
12 Aug 2025
20 Aug 2025
12 Aug 2025
19 Aug 2025
12 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_706854.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .