| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.1 LAccepted-AOC | ₹49.1 L | L1 | Accepted-AOC accepted |
| 2 | L2₹49.1 L+₹4,915.13 (0.10%)Rejected-AOC RA VASHI MAHAGAON TA TALA DIST RAIGAD | MAHAGAON | RAIGAD | MAHARASHTRA | ₹49.1 L+₹4,915.13 (0.10%) | L2 | Rejected-AOC rejected |
| 3 | L3₹50.3 L+₹1.2 L (2.53%)Rejected-AOC AT RAJAPE POST AMBIVALI TAL KARJAT DIST RAIGAD | KARJAT | RAIGAD | MAHARASHTRA | ₹50.3 L+₹1.2 L (2.53%) | L3 | Rejected-AOC rejected |
Tender Value
₹49.2 L
EMD Value
₹49,151
Closing Date
21 May 2026, 5:00 pmClosed
Executive Engineer (RWS), kunthebag, alibag tal- a
Executive Engineer (RWS), kunthebag, alibag tal- alibag dist- raigad
Construction of protection wall to Nala Near by at Wadgaon ghatatamor G.P. Wadgaon Tal. Alibag. Dist. Raigad
2026_RAIGA_1301533_2
RAIGAD/RWSS/20/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
G.P. Wadgaon Tal. Alibag. Dist. Raigad
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
₹49,151
28 Jul 2026
8 May 2026
22 May 2026
8 May 2026
21 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item No. 1 - Excavation for foundation/pipe trenches in Soft murum, road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in charge, normaldewatering, preparing the bed for foundation and excluding backfilling, etc.complete | 93.5 | Cum | 165 | ₹15,427.5 |
| 2 | Item No. 2 - Excavation for foundation/pipe trenches by all means in hard murum including removing the excavated material upto a distance of 50 M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc, complete. | 136 | Cum | 211 | ₹28,696 |
| 3 | Item no.3-Providing dry/trap/granite/quartzite rubble stone soling 15 cm... etc complete | 25.5 | Cum | 1,316 | ₹33,558 |
| 4 | Item No.4 - Providing & laying in situ. C.C of trap granite/quartzite /gneiss/metal for foundation & bedding including dewatering, from work,compacting, curing, finishing etc. complete. M 150 | 25.5 | Cum. | 5,881 | ₹1,49,965.5 |
| 5 | Item No.5:- Providing and casting in situ C.C. of trap/granite/quartzite / gneiss metal of approved quality for RCC works as per detailed drawings and designs or as directed by Engineer-in-charge including normal dewatering, centering, form work, compaction, finishing the formed surfaces with C.M. 1:3 of sufficient minimum thickness to give a smooth and even surface wherevermecessary or roughening if special finish is to be provided and curing, etc. complete. (By weigh batching and mix design for M-250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S.orTorreinforcement) R.C.C. M-200 for protection wall | 362.95 | Cum. | 9,313 | ₹33,80,153.35 |
| 6 | Item no 6 - Providing & fixing in position steel bar reinforcement of various diameters for R.C.C. Pipes caps,footing, foundation, slab,beams,columns, canopies, staircase, newels, chajjas, lintels,pardies, coping, fine arches etc.-as per detailed designs, drawing & schedule s including cutting,bending, hooking the bars, bindingwith wires or tack welding & supporting as required etc. complete (including cost of binding wire). Tor steel | 5.7 | MT | 80,681 | ₹4,59,881.7 |
| 7 | Item no - 7 Providing & fixing 80 mm dia. AC/PVC pipe weep holes at 1.5 m c/c straggererd including cost of all materials and labours involved with all leads and lifts etc. complete. | 203.4 | RMT | 231 | ₹46,985.4 |
| 8 | Item No 8 - Dewatering the excavated trenches and pools of water in the building trenches/pipeline. trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. | 450 | BHP.Hr | 89 | ₹40,050 |
| 9 | Item no - 9 Providing and fixing board displaying information such as'Nameofwork, Tendercost, Nameof Contractor, Workco | 1 | No | 9,963 | ₹9,963 |
| 10 | Item no.10-Compressive Strength OF C.C. Cube | 1 | No | 690 | ₹690 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.16 MB
BOQ_2234919.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .