| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹52,608 (12.0%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MTB ENTERPRISES L2 | THIRUMURUGAN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Applying prime coat over Existing BT Road surface of 3KG/10m2 including cost and conveyance of bituminous emulsion, labour charges for preparing the surface for applying required quantity of emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of MORTH specification | 548 | m2 | 68 ₹37,264 | 60 ₹32,880 Lowest |
| 2.00 | Laying 40mm consolidated thick dense Bituminous macadam using 0.40 cum for 37.50-13.20, 0.35cum of 13.2-2.36mm and 0.36 cum of 2.36mm & below size IRC metal with 71.30kgs of VG30/VG40 bitumen for premixing per 10squ including cost and conveyance of all materials, to site, heating the bitumen and aggregate to require temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, spreading the mix to uniform thickness of 40mm and consolidated by 8-10 tone Vibratory / Pneumatic roller to the required density, etc., including labour, including hire charges and fuel charges for 20-30t CMP with bitumen boiler, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges, etc., complete as per specification using CMP as per clause 55 of Ministry of Road Transport and Highways (MORTH)-REV-5. | 548 | m2 | 440 ₹2,41,120 | 400 ₹2,19,200 Lowest |
| 3.00 | Laying Tack Coat over existing BT surface using 2.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTY Rev-5. | 548 | m2 | 30 ₹16,440 | 25 ₹13,700 Lowest |
| 4.00 | Laying Bituminous concrete to 20mm compacted thickness using 0.10 cum of 13.20mm IRC HBG metal, 0.16 cum of 6.70mm IRC HBG metal, 0.18m3 of 2.80mm and below with 38 kgs of bitumen per 10sqm, for premixing including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature and mixing them in required temperature in central hot mix plant 20-30t capacity conveying the mix by tipper trucks to paver site. Spreading the mix required temperature f uniform thickness of 40mm to the specified grade and cross sections and compaction by 80-100KN power roller to the required density etc., including labour charges for loading bitumen into bitumen tank and metal in to feeder unit, labour for attending to pavers site including hire charges and fuel charges for 20-30T CMP with bitumen boiler, tipper tracks, pavers finishes, power rollers and all other T&Ps required including all other incidental charges etc., complete as per specification using CMP clause 511 of MOST specification. | 548 | m2 | 360 ₹1,97,280 | 317 ₹1,73,716 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
22 Sept 2025, 2:30 pmClosed
SE CM NCTPS II
Office of CE NCTPS II Chennai-120
NCTPS II Civil Maintenance Circle Civil Project Division Providing Bituminous macadam over the damaged existing T type Q type quarters road at Vallur Camp
2025_EB_601617_1
CE/NCTPS-II/SE/CM/21/2025-26
Open Tender
Civil Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,000
Yes
10 Dec 2025
8 Sept 2025
23 Sept 2025
8 Sept 2025
22 Sept 2025
8 Sept 2025
Amount
Applying prime coat over Existing BT Road surface of 3KG/10m2 including cost and conveyance of bituminous emulsion, labour charges for preparing the surface for applying required quantity of emulsion as tack coat by bitumen sprayer etc., complete as per clause 503 of MORTH specification
Laying 40mm consolidated thick dense Bituminous macadam using 0.40 cum for 37.50-13.20, 0.35cum of 13.2-2.36mm and 0.36 cum of 2.36mm & below size IRC metal with 71.30kgs of VG30/VG40 bitumen for premixing per 10squ including cost and conveyance of all materials, to site, heating the bitumen and aggregate to require temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, spreading the mix to uniform thickness of 40mm and consolidated by 8-10 tone Vibratory / Pneumatic roller to the required density, etc., including labour, including hire charges and fuel charges for 20-30t CMP with bitumen boiler, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges, etc., complete as per specification using CMP as per clause 55 of Ministry of Road Transport and Highways (MORTH)-REV-5.
Laying Tack Coat over existing BT surface using 2.00Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTY Rev-5.
Laying Bituminous concrete to 20mm compacted thickness using 0.10 cum of 13.20mm IRC HBG metal, 0.16 cum of 6.70mm IRC HBG metal, 0.18m3 of 2.80mm and below with 38 kgs of bitumen per 10sqm, for premixing including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature and mixing them in required temperature in central hot mix plant 20-30t capacity conveying the mix by tipper trucks to paver site. Spreading the mix required temperature f uniform thickness of 40mm to the specified grade and cross sections and compaction by 80-100KN power roller to the required density etc., including labour charges for loading bitumen into bitumen tank and metal in to feeder unit, labour for attending to pavers site including hire charges and fuel charges for 20-30T CMP with bitumen boiler, tipper tracks, pavers finishes, power rollers and all other T&Ps required including all other incidental charges etc., complete as per specification using CMP clause 511 of MOST specification.
MTB ENTERPRISES (BID ID -1466834)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .