Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
27 Aug 2020, 2:00 pmClosed
SUPERINTENDING ENGINEER
33/11KV SUB STATION PURANIA ALIGANJ LUCKNOW
Repairing and Maintenance work of 15 MVA Power Transformer No. 01 and 02 installed at 33/11 KV S/S Puraniya, Under the jurisdiction of EUDD-Daliganj, LESA, Tans Gomti, LESA, Lucknow.
2020_MVVNL_500848_1
44/EUDC-X/2020-21
Open Tender
Electrical Works
Lump-sum
180 days
EUDD-DALIGANJ LESA LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
EE EDD BKT LESA LUCKNOW
₹4,000
5 Sept 2020
12 Aug 2020
28 Aug 2020
12 Aug 2020
27 Aug 2020
12 Aug 2020
Amount
Stopping of oil leakage is done by application of steel putty composite of two component steel filled epoxy resin and hardener before applying this material for stopping oil leakage remove the degreasing & sludge removal from the transformer and also remove the paint over surface where oil leakage is to be stopped.
Stopping Oil Leakage from Top Cover
6 Nos Radiator Flenge
Inspection Cover
Maa enterprises & A to Z BUSINESS CENTRE
M/S AARADHYA AND ADHYATM ASSOCIATES
PRACHI ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .