| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.3 LAccepted-AOC | 1 | Accepted-AOC Being lowest and reasonable | |
| 2 | 2₹35.0 L+₹8,807 (0.25%)Rejected-Finance | 2 | Rejected-Finance Not being the lowest bidder | |
| 3 | 3₹35.0 L+₹10,012 (0.29%)Rejected-Finance | 3 | Rejected-Finance Not being the lowest bidder |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
25 Jul 2022, 6:00 pmClosed
GE(I) R AND D RCI, HYDERABAD
GE(I) RND RCI, MILITARY ENGINEER SERVICES, VIGNYANAKANCHA, RCI, HYDERABAD
REPAIR MAINT OF SCREW TYPE AND SEALED TYPE COMPRESSORS CONDENSERS AND CHILLER CONNECTED PIPE AND PUMPS UNDER GE I RND RCI HYDERABAD
2022_MES_533829_1
8713
Open Tender
Electrical and Maintenance Works
Item Rate
210 days
GE(I) R AND D RCI
MES enlisted Class D category c i Un enlisted Meeting enlistment criteria of D class in MES and having no recovery pending. For further details ref NIT
8 documents required · 8 mandatory
₹500
Yes
GE(I) R AND D RCI, HYDERABAD
₹80,000
Yes
3 Oct 2022
27 Jun 2022
1 Aug 2022
27 Jun 2022
25 Jul 2022
11 Jul 2022
Amount
Taking down display board of chiller package AC plant of capacity 120 TR to160 TR Make : Carrier/Blue star/Trane and supply and fix new display board to micro process based control panel capacity of 160 TR chiller package unit for smooth functioning, testing complete all as directed. Note : The work shall be executed through OEM of make Trane.
Taking down unserviceable SMPS board of 120 TR water cooled/ air cooled chiller package unit and supply and fix new SMPS board of 120 TR capacity of Make : Blue star/Carrier/Trane complete all as specified and directed.
Inspection of complete central AC plants of following capacities through representative of OEM(orginal Equipement Manufacture) of voltas/Carrier/Blue star and checking refrigeration system,Microprocessor control panel, connected PCBs,compressors, evaporators and all connected equipements and including submit inspection report for the further course of action to smooth run of AC plant complete all as specifed and directed.
11 TR to 30 TR
50 TR to upto 120 TR
Inspection of complete central AC plants of capacity of 65 TR to 95 TR through representative of OEM(orginal Equipement Manufacture) of TRANE and checking refrigeration system,Microprocessor control panel, connected PCBs,compressors, evaporators and all connected equipements and including submit inspection report for the further course of action to smooth run of AC plant complete all as specifed and directed.
Taking down micro process based control panel of chiller package AC plant MAKE BLUE STAR /voltas/ Carrier /dhanbush of various capacities and remove the unserviceble PCB and supply and fix new PCB to micro process based control panel capacity of 75 to 125 TR and refixing to chiller package and programing to the entire panel for smooth functioning, testing complete all as directed. Note : The work shall be executed through OEM of make trane.
Taking down unserviceable module adaptive control clear language display keyboard, supply and fix new module adaptive control clear language display keyboard of TRANE series chiller at EHSV,MEMS plants of capacity 120 TR. Note : The work shall be executed through OEM of make trane.
Leak testing of the system of air cooled /water cooled/Package type chiller/unit of various capacities with nitrogen (N2) pressure after evacuating of existing gas from the system in to empty cylinder by separating the entire system like compressors, condensors, cooling coil and refrigerant lines and rectifying of the leakage including cutting welding brazing etc and reconnecting with ‘O’ rings. Washers, gaskets etc flushing out the Nitrogen and vacuumising, recharging the taken out refrigerant gas complete all as directed.
11 TR to upto 50 TR
50 TR to upto 100 TR
100 TR to upto 160TR
Descaling of condenser of various capacities by circulating descaling agent (DC-96) through condensers by forced feed method removing the end covers of the condensers, cleaning the each tube of condenser thoroughly by machine brushing sytem, fixing back the end coversew with new rubber gasket, nuts bolts, washers etc and testing complete all as directed.
11 TR to upto 50 TR
50 TR to upto 100 TR
100 TR to upto 160TR
Disconnecting and isolating the compressor of YORK and bluestat make and following model No JS-44FN50B of 60TR from the system by placing dummy plates to suction and discharge valves opening the compressor removing all internal parts cleaning of all parts thoroughly, overhauling of compressers, supply and replacing the worn out parts viz piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and refixing/reassembling the compressor unit, oil charging, testing for oil pressure removing the dummy plates leak testing of the compressor and testing the compressor complete all as directed by Engineer-in-Charge
Disconnecting & isolating the compressor of YORK make and model JS 84F-T50B of 120TR from the system,at CSL AC plant evacuation of gas flushing out the system with Nitrogen, separating suction, discharge, liquid lines opening the compressor removing all internal parts & cleaning thoroughly with soap solution replacing the worn out parts viz piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and reassembling the compressor unit, checking of electrical and electronic controls, set points and adjust to the facory levels gas/ oil charging, testing for oil pressure leak testing of the compressor and testing the compressor complete all as directed.
Disconnecting and isolating the compressor of the Kirloskar make and model No MCQUAY-904 Screw sealed of 50 TR capacity from the system by placing dummy plates to suction and discharge valves opening the compressor removing all the internal parts, cleaning of all parts thoroughly supply and replacing the worn out parts of piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and refixing/reassembling the compressor unit, oil charging, testing for oil pressure removing the dummy plates leak testing of the compressor and testing the compressor complete all as directed by Engineer-in-Charge
Disconnecting and isolating the compressor of the Blue star/YORK make and model JS43F-N50B, of 50 TR capacity from the system by placing dummy plates to suction and discharge valves opening the compressor removing all internal parts cleaning of all parts thoroughly supply and replacing the worn out parts of piston pins, lock rings, piston rings, oil rings, DV/SV springs, DV washers, DV lock plates valve lifter spring, Nylon nuts, gasket sets etc with new ones and refixing/reassembling the compressor unit, oil charging, testing for oil pressure removing the dummy plates leak testing of the compressor and testing the compressor complete to the entire satisfaction all as directed by Engineer-in-Charge. NOTES for ser item No 9 to 12: Repalced parts will be measured and paid for separately as supply only and labour elements for fixing the same is deemed to be included in the unit rate quoted. 2. All consumable items like cleaning oil, grease and tools for testing are to be provided by the tenderer and cost of the same shall be deemed to be included in in the quoted rates 3 :works shall be executed through Rep of OEM and authorities letter of OEM shall be produced by the contractor to this effect before commencement of works. Supply and charging of oil & Refrigerant gas will be measured and paid for seperately under relevant items.
Rewinding, varnishing, insulation, ovening, greasing of compressor motor suitable for model DXS24LA-A46/50/MCQUAY /JS43F-N50B JS 94 of 120TR Compressor of AC plants 50/60/120 TR capacity all as directed
Remetling grinding, polishing of crank shaft model DXS24LA-A46/50/MCQUAY /JS43F-N50B JS 94 of 120TR Compressor of AC plants 50/60/120 TR capacity all as directed
Supply only gasket set for compressor of Models/makes :- (A) YORK Make : DXS24LA-A46/50 (B) Kirloskar make MCQUAY /JS43F-N50B
All as per item No. 15 above but Piston
All as per item No. 15 above but Suction valve assembly
All as per item No. 15 above but Discharge valve assembly
All as per item No. 15 above but Connecting rod assembly
All as per item No. 15 above but Bearings
All as per item No. 15 above but Piston rings
All as per item No. 15 above but Thrust washer
All as per item No. 15 above but Discharge reeds
All as per item No. 15 above but Suction reeds
All as per item No. 15 above but Spring set suction
All as per item No. 15 above but Spring set discharge
All as per item No. 15 above but Cylinder sleeve
All as per item No. 15 above but Unloader assembly
All as per item No. 15 above but Pin lift unloader
All as per item No. 15 above but Springs for pin lift unloder
All as per item No. 15 above but Springs retainer clips for lift unloader
All as per item No. 15 above but Oil pump
Disconnecting and isolating the screw compressors (model AFHX85, 30GX 180,30GX-092/ 37.50/ 47.50TR/75TR capacity) electrically and mechanically from the system after pumping down the system, opening othe end cover gear system, checking of the high speed gears, low speed gears, male & female rotors( asymetric rotor), bearings, overhauling of the same, replacing of the wornout, unserviceable spares like trust anchor, roller, tapers, Gasket set etc with new ones, reassembling, refixing back to the system, flushing of the system with dry nitrogen (N2), charging of the oil checking of the oil pressure, leak testing and gas charging complete all as directed. Note : ( a) Supply and charging of compressor oil and Refrigerna gas will be measured and paid for separately. (b) Spares replaced will be measured and paid for separately as supply only. Labour elements for fixing of spares shall be deemed to be included in the unit rate quoted.
All as per item No.33 above but screw compressors of make TRANE ( Model DXS 24 LA/DXS 36LA/RTAA 100K-YQ01A0COB/ RTAA 125K-YR01A0COB of 50/75/80 TR capacity)
Suply only Thrust taper bearings of screw comprssor YORK make of (Model AFHX85, DXS 24LA/DXS 36LA/30GX/60GX :-
All as per item No. 35 above but Rotor bearing
All as per item No. 35 above but Screw balance bearing
All as per item No. 35 above but Slide valve bearing
All as per item No. 35 above but Gasket set
Disconnecting and opening of screw compressor of any make and model after pumping down of the system, varnishing for improvement of insulation resistance inspecting of the cables of the motor end and control panel end of the terminations of the screw compressor (Heli rotor), Inspecting of the conductor, cutting and removing of the burntout end portions, reterminating, rewinding of compressor motors as required, connecting back of the compressor motor connections at both ends of TRANE, YORK, Dunham bush, Carrier series of capacity 37.TR to 80 TR all as directed.
Supply and filling synthetic oil RL 220. Make : RL
Supply and filling synthetic oil SW 220.
Draining out the old existing used compressor oil from the various compressor and supply and Charging of compressor oil of make York C oil complete all as directed by Engineer-in-charge.
Supply and filling compressor oil DB 18/SG 160Z all as directed.
Supply and filling compressor frezol 68 all as directed.
Supply and filling charging any type of Refrigerant gas R-22 /134A/407 C all as directed.
Disconnecting of unserviceable water pressure cut out, IPS-70 and supply and fix new water pressure cut out IPS-70 all as directed. Make : Indofoss/Donfoss
Disconnecting and removing of unserviceable leaking condenser safety valve after making system pumping down and supply and fix new condenser safety valve 0 to 300/0 to 400 PSI all as directed. Make : HENRY/BAP/CASTLE
Disconnecting and removing of unserviceable snap activiation switch from the chiller and supply and fix new snap activiation switch 0.10 to 1 Kg/Cm2 pressure all as directed. Make :- Indofoss/Donfoss
Disconnecting and removing of unserviceable damaged loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of 25 TR to 50 TR capacity complete all as directed. Make : Donfoss or Equivalent in Sahalan
Disconnecting and removing of unserviceable loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of above 50TR to 120 TR complete all as directed. Make : Donfoss or Equivalent in Sahalan
Disconnecting and removing of unserviceable loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of model AKS32R all as directed. Make : Donfoss or Equivalent in Sahalan
Disconnecting and removing of unserviceable damaged loading unloading coil from the existing position after making system pumping down and supply and fix new loading unloading coil of the compressors of model NM 22-021 all as directed. Make : PARKER or Equivalent in in Donfoss
Disconnecting and removing of unserviceable crank case heater and supply and fix nex crank case heater fix of York/screw of compressers.
Disconnecting and removing of unserviceable flow switch from the system and supply and fix new flow switch model M9109-GGA-4 all as directed Make : Johnson Controls/Rapid controls/Penn
Disconnecting and removing of chilled water sensor from the existing positon and supply and fix new chilled water sensor for Trane series, Dhan bush, carrier,York,MCQUAY chillers all as directed. Make : Danfoss/ALERTON
Disconnecting and removing of unserviceable low pressure cut out and supply and fix new low pressure cut out MP1 all as directed Make : Indofoss/Danfoss/YORK
All as per item No 57 but high pressure cut out MP-5
All as per item No 57 but high pressure cut out MP-15
All as per item No 57 but high pressure cut out MP-55
All as per item No 57 but water pressure cut out IP-70
Disconnecting and removing of unserviceable checked CATCH-ALL drier filter after pumping down the system and supply and fix new CATCH-ALL drier filter or liquid line filter/ strainer of suitable model and make of AC plants all as directed.
Disconnecting and removing of unserviceable pressure gauge of any rating 0 to 150/0 to 300 PSI or equivalent in Kgs/Cm2 and supply and fix new pressure gauge all as directed. Make : Fiebig/H-Guru/KI
Disconnecting and removing of unserviceable electronic expansion valve after pumping down the system and supply and fix new electronic expansion valve of any model of AC plants of capacity following capacities complete all as directed. Make : Danfoss/indofoss
11 TR to upto 30 TR
30 TR to upto 50 TR
50 TR to upto 120 TR
Opening the condensing unit system by removing the covers, opening of the fan system, servicing to the fan motors, cleaning of the blades, shafts, lubricating to the motors 1 to 2HP capacity, greasing to the bearing, checking of the electrical control system, wiring, switches, relays, contactors, tightening of the losse contacts, rectifying of the defects, faults, refixing the fan motors with blades in the original position, reconnecting, fixing of the covers all as specified and directed of 2 Nos fan motors of 5.5 TR (11 TR) capacity.
All as per item No. 65 above but 2 Nos fan motors of 17.5 TR ( 35 TR) capacity
All as per item No. 65 above but 4 Nos fan motors of 12 TR (48 TR) capacity.
All as per item No. 65 above but 6 Nos fan motors of 11 TR (65/66 TR) capacity.
All as per item No. 65 above but 4 Nos fan motors of 19 TR (75/76 TR) capacity.
All as per item No. 65 above but 6 Nos fan motors of 16 TR (95/96 TR) capacity.
All as per item No. 65 above but 8 Nos fan motors of 20 TR (160 TR) capacity.
Opening the condensing unit system of any capacity by removing the covers opening the unserviceable fan motors 1 to 2HP capacity, transporting to work shop, cutting and removing of the burnt out winding conductors,rewinding of the same with same size and gauge of super enamelled copper conducotr, insulating, varnishing, greasing, bringing back to site, refixing conductor in the original position, reconnecting and testing complete all as directed
Opening condensing unit system of any capacity by removing of the covers opening the fan motor system, removing the unserviceable, wornout, jammed bearing, supply and fix new bearing and refixing reconnecting and testing complete all as directed.
Disconnecting and removing the unserviceable 3 pole power contactor CLO2, from the existing position and supply and fix new CLO2, 25 Amps power contactor and testing complete all as directed . Make:- GE or Equivalent in SIEMENS
Disconnecting and removing of the unserviceable 3 pole power contactor SCO3 (II), from the existing position and supply and fix new SCO3 (II) , 20 Amps power contactor and testing complete all as directed . Make:- Fuji electronics or Equivalent in GE
Disconnecting and removing the unserviceable 3 pole power contactor 10E, 3RT1015-1A BOI, from the existing position and supply and fix new 10E, 3RT1015-1A BOI, 25 Amps power contactor and testing complete all as directed. Make:- Siemens or Equivalent in GE
Disconnecting and removing the unserviceable 3 pole power contactor C25 DND 30, from the existing position and supply and fix new C25 DND 30, 30 Amps power contactor and testing complete all as directed Make:- BCH or Equivalent in L&T
Disconnecting and removing the unserviceable 3 pole power contactor CM15DN3, from the existing position and supply and fix new CM15DN3, 27 Amps power contactor and testing complete all as directed . Make:- BCH or Equivalent in L&T
Disconnecting and removing the unserviceable 3 pole power contactor 10E3RT1015- 1A BOI, from the existing position and supply and fix new 10E3RT1015- 1A BOI, 25 Amps power contactor and testing complete all as directed . Make:- Siemens or Equivalent in GE
Removing unserveaceble blade of any size, sweep and any size of shaft of make Voltas, blue star , carrier trane, York , Dhunham bush etc and supply ,fix and testing of blade of condenser fan of any capacity for air cooled chiller units as specified and directed. Note : This item will be operated as per recommendation of OEM in wirting.
Disconnecting and removing unserviceble condensing motor both mechanically and electrically and Supply and fix with modification alongwith required contactors and auxilliary contactor of condensing motor unit motor capacity above 2 HP and up to 3 HP, 440 volts with / new blades and bracket etc all as directed Engineer in charge
Supply and fix dial type temperature gauge range ( 0 to 100 ) degree centigrade including removing unserviceable gauge all as directed.
Supply and fix 3 pole MCCB 315 Amp having current carrying capacities with adjustable thermal and adjustable magnetic settings, 50 Hz with 16 KA rupturing capacity at 415 volt, conform to IEC -60947-II/ IS-13947-II including provision of copper cable/ extended terminals of suitable ratings from MCCBs to busbar and connection of LT cables with suitable size aluminium lugs including dismantling the unserviceable MCCBs from the panel boards complete all as specified and directed. Make: Havell's/Standard/L&T/GE.
All as per item No. 83 above but 200 Amp, 16 KA
All as per item No. 83 above but 160 Amp, 16KA
All as per item No. 83 above 100 Amp , 16 KA
Taking down unserviceable condenser fan motor PCB of chiller package AC plant of Make : Carrier/Trane/Bluestar/Dhanumbush capacity of 120 to 160 TR and supply and fix new condenser fan motor PCB to micro process based control panel capacity of 160 TR and refixing to chiller package and programing to the entire panel for smooth functioning, testing complete all as directed. Note : The work shall be executed through OEM of make trane.
Taking down the old unserviceable compressors, supply and fix new hermetically sealed scroll compressors suitabel for air cooled chilled water plant and packaged units of 11 TR capacity with mounting assembly such as rubber springs etc after disconnecting all electric connections, pumpdown complete system including alteration of refrigerant piping suction and discharge,pressure testing the complete system with nitrogen after carried out repairs, flushing out the complete system, vacuuming and gas charging with suitable gas to obtained design cooling, closing of suction and discharge valves complete all as specified and directed.
Removing unserviceable discharge pressure transducer and supply and fix new discharge pressure transducer of 160TR plant of Model 30GX-182-AO520PEE of make carrier complete all as specified and directed.
Removing unserviceable suction pressure transducer and supply and fix new suction pressure transducer of 160TR plant of Model 30GX-182-AO520PEE of make carrier complete all as specified and directed.
Removing unserviceable oil pressure transducer and supply and fix new oil pressure transducer of 160TR plant of Model 30GX-182-AO520PEE of make carrier complete all as specified and directed.
CHITRA ENGINEERING CORPORATION
S.S.ENGINEERING CORPORATION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .