| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹289.4 CrAccepted-AOC | ₹289.4 Cr | 1 | Accepted-AOC Negotiated Rate as approved by Honble Cabinet Government of Assam |
| 2 | Rejected-Technical | - | - | Rejected-Technical Average Annual Turnover is not adequate as per the RFB |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not submitted hard copies of following mandatory documents in original as per Clause 7 of e-Procurement Notice.
1) Bid Security Declaration
2) Power of attorney
3) Affidavit |
| 4 | Rejected-Technical | - | - | Rejected-Technical Does not meet qualification Criteria as per Section III of the RFB |
| 5 | Rejected-Technical | - | - | Rejected-Technical Does not meet qualification Criteria as per Section III of the RFB |
Tender Value
₹116.0 Cr
Closing Date
15 Dec 2021, 2:00 pmClosed
State Project Director, AIWTDS
AIWTD Society Near Ulubari Flyover GUWAHATI 781007 Assam
Construction of Terminal and Riverine Infrastructure at Guwahati Gateway Ghat, Assam
2021_TDEP_22437_1
IN-IWT-244480-CW-RFB
Open Tender
Construction Works
910 days
Guwahati
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
Exempted
AIWTD Society office
21 May 2022
11 Aug 2021
15 Dec 2021
12 Aug 2021
15 Dec 2021
14 Sept 2021
3 Sept 2021
Bill No. 1 Engineering, Procurement of Materials and Construction of Site Grading
Preliminary works and Site Grading Carry out Topographic, Bathymetric and Geotechnical investigation surveys including report preparation as per the specifications. Complete site grading works required at the site for construction of permanent works.
Bill No. 2 Engineering, Procurement of Materials and Construction of Riverine Works
Bankseat Bankseat including mobilization and demobilization and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all aspects.
Dolphins for Intermediate Pontoons Dolphins for Intermediate pontoons including mobilization and demobilization and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all aspects.
Dolphins for Berthing Pontoons Dolphins for Berthing pontoons including mobilization and demobilization and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all aspects.
Link Spans Procure, supply, fabricate, install & commissioning of Pontoon with structural steel work welded in built up sections, framed work including cutting, hoisting and fixing in positions and applying paint (as per paint specifications) including drilling holes, fitting and fixing with bolts and nuts or welding, as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.
Berthing Pontoons Procure, supply, fabricate, install & commissioning of Pontoon with structural steel work welded in built up sections, framed work including cutting, hoisting and fixing in positions and applying paint (as per paint specifications) including drilling holes, fitting and fixing with bolts and nuts or welding, as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.
Intermediate Pontoons Procure, supply, fabricate, install & commissioning of Pontoon with structural steel work welded in built up sections, framed work including cutting, hoisting and fixing in positions and applying paint (as per paint specifications) including drilling holes, fitting and fixing with bolts and nuts or welding, as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.
Design Fee
BILL NO. 3-Engineering, Procurement of Materials and Construction of Terminal Building
Terminal Buildings and Ancillary services Building works including mobilization & demobilization of equipment, foundations (Cast-in-situ RCC bored piles) for superstructure of deck size 56.625m x 33.085m / 29.065m, control building, sheds, ready to use as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.
Design Fee
BILL NO. 4-Engineering, Procurement of Materials and Construction of Landscaping
Landscaping Landscaping including mobilization & de- mobilization, lawn making, planting, etc. and ready to use as per approved designs, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects..
BILL NO. 5-Engineering, Procurement of Materials & Construction of Electrical Works
Electrical Works All electrical works including mobilization & de-mobilization, installation of transformers, feeders, cables, earthing, lighting, etc. and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all respects. This also includes installation, commissioning and testing of solar power panels and back up as necessary, all complete.
BILL NO. 6-Engineering, Procurement of Materials & Construction of Water Supply, Sewerage and Drainage Works
Water Supply, Sewerage and Drainage All Water supply works including mobilization & de-mobilization, Water Treatment Plant, Storm water drainage, Irrigation network and ready to use as per approved designs, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects
BILL NO. 7- Engineering, Procurement of Materials & Construction of Plumbing Works
Plumbing Works Plumbing works in the terminal including mobilization and demobilization ready to use as per approved design, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects..
BILL NO. 8-Engineering, Procurement of Materials & Construction of firefighting system
Firefighting System Works Firefighting system works in the terminal including mobilization and demobilization ready to use as per approved design, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects..
BILL NO. 9-Environmental Management Plan (EMP)
All technical support needed to implement the EMP, and fulfil statutory environmental compliance requirements including monitoring and reporting
Plantation and management of flora as per the EMP
All precautionary measures to mitigate impacts on aquatic life as per the EMP
Construction of soak pits at construction sites & labour camps, Per site estimated Provision of clean drinking & domestic water facility at labour camps and construction site Per month
Health checkup camps for construction workers All other Environment, Health and Safety provisions and implementation of the Environmental health and Safety Systems during construction as per EMP As per standards and frequency described in the EMP Sufficient to comply with applicable regulations and the EMP
Terrestrial and Aquatic Fauna Per season(Once in six month)
Ambient Air Quality Per monitoringfor 24 months (Once in two month)
Surface Water Quality For upstream & downstream (Once in month)
Drinking Water Quality Once in month
Noise & Vibration Per monitoring for 24 months (Once in month)
Soil Quality, Erosion & Siltation and Riverbed Sediment Per Six months
All other items of the EMP,the Contractors EMP oritems needed forcompliance oftheapplicable regulations as described in the EMP(Unless specifically quoted, these will be deemed to be included in the Bid Price).
BILL NO. 10- Duties and Taxes
*Duties andTaxes including Goods and Service
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid