Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
22 Dec 2023, 3:00 pmClosed
Block Development officer(BP),
PU office veppur-621717
Construction of wier and Desilting of Pond at othiyam kasivuneer kuttai (asur road) HO othiyam Panchayat
2023_RDTN_400441_2
15thcfc/BP/B2/1733/2023 11.12.2023
Open Tender
Civil Works - Water Works
Item Rate
90 days
PU office veppur
as per tender documents
4 documents required · 4 mandatory
₹0
₹12,000
Yes
27 Dec 2023
16 Dec 2023
22 Dec 2023
16 Dec 2023
22 Dec 2023
16 Dec 2023
Amount
Clearing Juliflora Jungle with uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance, cost and conveyance of all charges etc complete
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting etc., complete.
Supplying and filling in foundation, basement, etc with filling m.sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc., complete.
Cement Concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing, laying, curing etc., complete.
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc., complete.Centering for Below GL for Footing
Centering for Above GL
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc., complete.
Provision for Name board Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Stalin P
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].