Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.3 LAccepted-AOC 7 11 1 BROJONATH LAHIRI BISHNUPUR SOUTH 24 PGS WEST BENGAL 743503 | 24 PARAGANAS SOUTH | WEST BENGAL | 743503 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹44.6 L+₹2.3 L (5.44%)Rejected-Finance PO CHANDL PS BISHNUPUR DIST SOUTH 24 PGS PIN 743503 | 24 PARAGANAS SOUTH | WEST BENGAL | 743503 | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹44.7 L+₹2.5 L (5.84%)Rejected-Finance 10 1 GROUND FLOOR WEST GHOSH PARA JAGATDAL JAGATDAL JAGATDAL NORTH 24 PARGANAS WEST BENGAL 743125 | 24 PARAGANAS NORTH | WEST BENGAL | 743125 | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹45.2 L+₹3.0 L (6.99%)Rejected-Finance 44B CIRCULAR GARDEN REACH ROAD KOLKATA 700 023 | KOLKATA | WEST BENGAL | 700023 | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹45.4 L+₹3.1 L (7.34%)Rejected-Finance P 45 KHIRODE VIDYA BINOD AVENUE KOLKATA 700003 | KOLKATA | WEST BENGAL | 700003 | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | INDIA ELECTRICAL EQUIPMENTS L4 | UNITED ENGINEERS L2 | RADHA ENTERPRISE L3 | KAMAKHYA TRADERS L9 | GHOSH ENTERPRISE L7 | SK CONSTRUCTION SYNDICATE & ENGG CO L1 | NIRMAL DAS AND CO. L6 | UNIVERSAL TRADING CENTRE L5 | ARATI TRADING CO L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (Un-reinforced) in ground floor and paving nexc 15cm thick above or below GL complete all as specified and directed | 3 | Cum | 261 ₹783 | 668 ₹2,004 | 477 ₹1,431 | 214 ₹642 | 132 ₹396 Lowest | 800 ₹2,400 | 495 ₹1,485 | 470 ₹1,410 | 314 ₹942 |
| 2.00 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in mortar complete all as specified and directed. | 1.6 | X Sqm | 21 ₹33.6 Lowest | 231 ₹369.6 | 159 ₹254.4 | 64 ₹102.4 | 187 ₹299.2 | 260 ₹416 | 222 ₹355.2 | 232 ₹371.2 | 300 ₹480 |
| 3.00 | Dismantling floors hearth or wall tilling including cement mortor bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed | 180 | Sqm | 31 ₹5,580 | 44 ₹7,920 | 22 ₹3,960 | 44 ₹7,920 | 16 ₹2,880 Lowest | 38 ₹6,840 | 32 ₹5,760 | 62 ₹11,160 | 21 ₹3,780 |
| 4.00 | Demolition of brick work or stone masonry built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 1 | Cum | 745 ₹745 | 1,022 ₹1,022 | 471 ₹471 | 544 ₹544 | 444 ₹444 Lowest | 800 ₹800 | 585 ₹585 | 874 ₹874 | 687 ₹687 |
| 5.00 | Taking down cement plaster of any description on brick work or stone masonry wall including racking ot joints hacking for key scrubbing down with water etc. complete all as specified and directed | 140 | Sqm | 26 ₹3,640 | 74 ₹10,360 | 62 ₹8,680 | 31 ₹4,340 | 24 ₹3,360 Lowest | 52 ₹7,280 | 32 ₹4,480 | 55 ₹7,700 | 48 ₹6,720 |
| 6.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as directed and directed | 1 | Cum | 741 ₹741 | 1,044 ₹1,044 | 147 ₹147 Lowest | 210 ₹210 | 210 ₹210 | 1,100 ₹1,100 | 441 ₹441 | 1,010 ₹1,010 | 465 ₹465 |
| 7.00 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm complete all as specified and directed. | 36 | Each | 100 ₹3,600 | 196 ₹7,056 | 114 ₹4,104 | 80 ₹2,880 Lowest | 110 ₹3,960 | 160 ₹5,760 | 205 ₹7,380 | 147 ₹5,292 | 201 ₹7,236 |
| 8.00 | All as item No. 07 above but exc 1.5 Sqm and nexc 4.0 Sqm each. | 32 | Each | 100 ₹3,200 Lowest | 210 ₹6,720 | 116 ₹3,712 | 102 ₹3,264 | 112 ₹3,584 | 180 ₹5,760 | 210 ₹6,720 | 158 ₹5,056 | 205 ₹6,560 |
| 9.00 | Taking down of shutters of any description nexc 1.0 Sqm each complete all as specified and directed | 60 | Per leaf | 50 ₹3,000 | 81 ₹4,860 | 95 ₹5,700 | 102 ₹6,120 | 65 ₹3,900 | 80 ₹4,800 | 120 ₹7,200 | 47 ₹2,820 Lowest | 135 ₹8,100 |
| 10.00 | Taking down of shutters of any description exc 1.0 Sqm and nexc 2.0 Sqm each complete all as specified and directed. | 10 | Per leaf | 50 ₹500 Lowest | 105 ₹1,050 | 102 ₹1,020 | 105 ₹1,050 | 66 ₹660 | 100 ₹1,000 | 128 ₹1,280 | 58 ₹580 | 138 ₹1,380 |
Tender Value
₹38.0 L
EMD Value
₹75,960
Closing Date
6 Aug 2026, 6:00 pmClosed
SHRI RAKESH KUMAR
GARRISON ENGINEER (CENTRAL) KOLKATA NAPIER ROAD HASTINGS 700022
WELCOME MAINTENANCE TO OFFR QTRS AT BMC UNDER GE (C) KOLKATA
2026_MES_779236_1
8961/E8
Open Tender
Miscellaneous Works
Item Rate
270 days
Kolkata
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE(CENTRAL) KOLKATA
₹75,960
Yes
26 Sept 2026
17 Jul 2026
7 Aug 2026
17 Jul 2026
6 Aug 2026
1 Aug 2026
17 Jul 2026 - 31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete (Un-reinforced) in ground floor and paving nexc 15cm thick above or below GL complete all as specified and directed | 3 | Cum | - | - |
| 2 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in mortar complete all as specified and directed. | 1.6 | X Sqm | - | - |
| 3 | Dismantling floors hearth or wall tilling including cement mortor bedding (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified and directed | 180 | Sqm | - | - |
| 4 | Demolition of brick work or stone masonry built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 1 | Cum | - | - |
| 5 | Taking down cement plaster of any description on brick work or stone masonry wall including racking ot joints hacking for key scrubbing down with water etc. complete all as specified and directed | 140 | Sqm | - | - |
| 6 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as directed and directed | 1 | Cum | - | - |
| 7 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm complete all as specified and directed. | 36 | Each | - | - |
| 8 | All as item No. 07 above but exc 1.5 Sqm and nexc 4.0 Sqm each. | 32 | Each | - | - |
| 9 | Taking down of shutters of any description nexc 1.0 Sqm each complete all as specified and directed | 60 | Per leaf | - | - |
| 10 | Taking down of shutters of any description exc 1.0 Sqm and nexc 2.0 Sqm each complete all as specified and directed. | 10 | Per leaf | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TENDER8961.pdf
Tender Documents • 1.41 MB
BOQ_872777.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .