Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-Finance LUCKNOW | UTTAR PRADESH | 226020 | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹3.4 L+₹269.60 (0.08%)Rejected-Finance 0 DADACHAWAR DADACHAWAR MAU MAU UTTAR PRADESH 275306 | MAU | UTTAR PRADESH | 275306 | L2 | Rejected-Finance Above to Lowest Rate | |
| 3 | L3₹3.4 L+₹336.99 (0.10%)Rejected-Finance | L3 | Rejected-Finance Above to Lowest Rate | |
| 4 | L4₹3.4 L+₹2,021.98 (0.60%)Rejected-Finance | L4 | Rejected-Finance Above to Lowest Rate | |
| 5 | L5₹3.4 L+₹5,391.95 (1.60%)Rejected-Finance | L5 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹3.4 L
EMD Value
₹33,700
Closing Date
16 Jun 2026, 1:00 pmClosed
Executive Officer
NPP MAU
WARD NO 03 BADUAGODAM LOKAAPUR DALIT BASTI ME MAHENDRA KE MAKAN SE HARENDRA KE MAKAN TAK NALI NIRMAD WA INTARLOCKING KARYA
2026_DOLBU_1129812_2
68-13
Open Tender
Civil Works
Percentage
120 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹832
Executive Officer
₹33,700
17 Jul 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
16 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials
and including grass cutting /Dressing and
carrage of matrials by Head load | 1 | JOB | 2,500 | ₹2,500 |
| 2 | E/W filling in embankment with cartage soil
up to 8.00 km distances etc com. | 60.64 | CUM | 301 | ₹18,252.64 |
| 3 | Dismenteling of Brick Work including
Stacking of materials as directed by the
Engineer-in-Charge with the distance of
60.00m. Work SI No. 692 | 6.41 | CUM | 435 | ₹2,788.35 |
| 4 | E/W in Excavation in ordenery soil in
foudation including labour and matrials
and T/P with all com. Work SI No. 251 | 27.75 | CUM | 115 | ₹3,191.25 |
| 5 | C.C. Work in 1:6:12 in cement, fine sand
and 40 mm Gauge Brick Ballast including
labour and matrials , T/P with all com.
Work SI No. 273 | 4.85 | CUM | 3,250 | ₹15,762.5 |
| 6 | M-150 B/W in 1:4 in cement and coar sand
mortar including labour and matrials , T/P
with all com. Work SI No.305
DEDUCTED TO OLD BRICKS & BATS RS. 8507.00 | 10.54 | CUM | 4,980 | ₹52,497.96 |
| 7 | 12mm thick Plaster work in 1:3 in cement
and fine sand mortar including labour and
matrials, T/P with all com. Work SI No.583 | 35.52 | SQM | 189 | ₹6,713.28 |
| 8 | R.C.C. Work in 1:1.5:3 in cement coarse
sand and 20mm gauge including labour
and matrials, T/P with all com. Work SI
No.285 | 0.38 | CUM | 9,430 | ₹3,583.4 |
| 9 | MS work in R.C.C. work including
labour and matrials , T/P with all com.
Work SI. No.504 | 0.3 | QTL | 5,650 | ₹1,695 |
| 10 | Construction of Granular sub base (GSB) by
providing coarse graded material spreading
in uniform layers with motor grader on
prepared surface, mixing by mix in place
method with rotavator at OMC, and
compacting with vibratory roller to achieve
the desired density, complete as per Clause
401 .. | 6.6 | CUM | 3,492.6 | ₹23,051.16 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
tech6801.pdf
Tender Documents • 6.53 MB
BOQ_2166512.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .