Block Development Officer (VP)
BDO Office, P.N.Palayam Block
Salem District - P.N.Palayam Block - Construction of Drain, Providing Paver block and Construction of Compound wall in Sekkadipatty Panchayat at No of Works 05 at PMAGY-2022-23 Package No.01-2022-23.
2023_RDTN_329990_1
Roc.No.906/2023/T1
Open Tender
Civil Works - Others
Item Wise
90 days
BDO Office, P.N.Palayam Block
As per tender Document
3 documents required · 3 mandatory
₹0
₹20,000
5 Jul 2023
20 Jun 2023
30 Jun 2023
20 Jun 2023
30 Jun 2023
20 Jun 2023
Amount
1.) Construction of Drain Mariamman Kovil Street Aathidravidar Colony @ Sekkadipatty H/O Sekkadipatty
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and erecting centering shuttering inculding necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, roof slabs, staircase stpes, bed blocks, critical Plane Surface
Cement concrete 1:3:6 mix using 20mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Plastering with Cement mortar 1:5 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
2) Providing Paverblock in Mariamman kovil 2nd street Aathidravidar colony @ Sekkadipatty H/O Sekkadipatty
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying of Interlocking concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of spec.
Plastering with Cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
3) Providing Paverblock in South street colony @ Anantha Nagar H/O Sekkadipatty
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying of Interlocking concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of spec.
Plastering with Cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
4) Providing Paverblock in North street colony @ Anantha Nagar H/O Sekkadipatty
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying of Interlocking concrete Block (Surface Textured) Pavements having thickness 60mm and compacted over a thin bedding sand layer of 30 mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of spec.
Plastering with Cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete.
Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete.
5) Construction of Compound wall and Cement concrete Road in Colony Mayanam @ Anantha Nagar H/O Sekkadipatty.
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and erecting centering shuttering inculding necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, roof slabs, staircase stpes, bed blocks, critical Plane Surface
Above GL
Supplying and fabricating and placing in position MS steel or ribbed for steel for all reinforced cement concrete works as per the design given inculding cost of steel and binding wire in all floors etc., complete complying with standard specification Up to 16 mm dia
Reinforced cement concrete 1:1:5:3 mix using 20mm ISS Metal inculding cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Priming coat of cement paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete road
Earth work Excavation for Foundation in all soils and sub Soil as per SS2 for foundation etc., completed SS 2B
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Supplying and erecting centering shuttering inculding necessary supports for plane surface in foundation and basement and in all floors for RCC column footing column plinth beam, roof slabs, staircase stpes, bed blocks, critical Plane Surface
Cement concrete 1:3:6 mix using 20mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Cement concrete 1:4:8 mix using 40mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal inculding cost and conveyance of all materisl to site and labour charges for mixingfor mixing, laying and curing etc complete
Provision for Bitumin pad Expension Joint 15mm
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
EPS CONSTRUCTION
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .