Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹10.1 L (8.39%)Admitted-Finance | ₹1.3 Cr+₹10.1 L (8.39%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹10.2 L (8.47%)Admitted-Finance | ₹1.3 Cr+₹10.2 L (8.47%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | J S B INFRA L2 | MAA MUNDESWARI ENTERPRISES L1 | M/s adrsh Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00The Work for verious system improvement / strengthening works in municipal area under UEDD-III & VIII Varanasi | ||||||
| 2.00 | Stay clamp for ST Pole with N&B | 52 | No | 12,740 ₹15,033.2 | 11,648 ₹13,744.64 Lowest | 13,000 ₹15,340 |
| 3.00 | LT. clamp for STP/PCC with N&B | 7 | No | 1,260 ₹1,486.8 Lowest | 1,260 ₹1,486.8 Lowest | 1,330 ₹1,569.4 |
| 4.00 | LT Shackle Insulator | 422 | Nos | 17,302 ₹20,416.36 | 16,880 ₹19,918.4 Lowest | 17,724 ₹20,914.32 |
| 5.00 | Loop/Stay Insulator | 530 | No | 13,780 ₹16,260.4 | 12,720 ₹15,009.6 Lowest | 14,310 ₹16,885.8 |
| 6.00 | MS X-arm Clamp for STP 9/11 mtr | 696 | No | 1,25,280 ₹1,47,830.4 | 1,16,928 ₹1,37,975.04 Lowest | 1,32,240 ₹1,56,043.2 |
| 7.00 | Eye bolt | 350 | Nos | 27,300 ₹32,214 | 25,200 ₹29,736 Lowest | 28,000 ₹33,040 |
| 8.00 | T/F base clamp with N&B | 28 | No | 6,860 ₹8,094.8 | 6,440 ₹7,599.2 Lowest | 7,000 ₹8,260 |
| 9.00 | Cable holding clamp | 56 | No | 8,680 ₹10,242.4 | 8,400 ₹9,912 Lowest | 8,960 ₹10,572.8 |
| 10.00 | holding clamp for GI Pipe | 2 | No | 490 ₹578.2 | 450 ₹531 Lowest | 500 ₹590 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
22 Sept 2023, 3:00 pmClosed
SUPERINTENDING ENGINEER
UEDC-II, CHANDRIKA NAGAR COLONY, SIGRA, VARANASI
The Work for system improvement / strengthening works in municipal area under UEDD-III and VIII, Varanasi on Semi Turn-Key Basis in System Strengthening Scheme 2023-24
2023_PVVNV_837457_1
47/UEDC-II(V)/2023-24
Open Tender
Electrical Works
Lump-sum
90 days
UECD-II
PLEASE REFER AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹6,195
EE, UECD-II, VARANASI
₹1.2 L
5 Oct 2023
13 Sept 2023
23 Sept 2023
13 Sept 2023
22 Sept 2023
13 Sept 2023
The Work for verious system improvement / strengthening works in municipal area under UEDD-III & VIII Varanasi
Stay clamp for ST Pole with N&B
LT. clamp for STP/PCC with N&B
LT Shackle Insulator
Loop/Stay Insulator
MS X-arm Clamp for STP 9/11 mtr
Eye bolt
T/F base clamp with N&B
Cable holding clamp
holding clamp for GI Pipe
HDPE pipe 110mm
GI pipe 100mm
M.S. Nut & Bolts off size
Dead end clamp with eye hook
Suspension clamp with eye hook
clamp for Eye hook with N&B
LT Cable S/C 1x35 sq mm
LT Distribution Box with clamp and N&B
LT Insulated piercing clamp for enagiging D/B
LT bare netural connector ( P.G. Clamp)
Allu Lug for 95 sq.mm
Allu. Lugs for 400 sq mm
Allu. Lugs for 630 sq mm
Allu. Lugs for 50 sq mm
Allu. Lugs for 1000 sq mm
Cost of copper Z clamp for 250 KVA T/F with nut bolt & washer
Cost of copper Z clamp for 400 KVA T/F with nut bolt & washer
Cost of copper Z clamp for 630 KVA T/F with nut bolt & washer
Supply and errection of LT MCCB 800 Amp.
Supply and errection of LT MCCB 400 Amp.
Supply and errection of LT MCCB 250 Amp.
Supply and errection of LT MCCB 100 Amp.
Supply and errection of LT Distribution paneel type A-2
Supply and errection of LT Feeder Piller
Supply and errection of LT Service Piller
Replacement/addition of LT Poles in Line
Carriage of S.T. Pole 9 mtr / PCC pole 8.5 mtr from store to site with loading & unloading
Dismantling of Old & Damaged pole 9/PCC pole 8.5 meter long after dismentling of cond. & accessories from line and its proper steking .
Erection grouting & plinthing of New 9/PCC pole 8.5meter long including fixing of accessories and resagging & stringing of old conductor on re-errected pole.
Fitting of Earthing rod
Carriage of Damaged / dismentilled pole from dumping store to Raja Talab store with loading & Unloading
Grouting of Stay, nozelling & fixing of stay wire etc.
Guarding of HT Lines
Labour charge for Laying and stringing of two nos GI wire with Lacing and binding
Fabrication and fixing of fitting
Carriage of material from store to work site including loading and unloading.
A. Replacement/addition of Poles in H.T Line 33KV or 11KV
Carriage of S.T. Pole 11 mtr from store to site with loading & unloading
Dismantling of Old & Damaged pole 11 meter long after dismentling of cond. & accessories from line and its proper steking .
Erection grouting & plinthing of New 11 meter long including fixing of accessories and resagging & stringing of old conductor on re-errected pole.
Fitting of Earthing rod
Carriage of Damaged / dismentilled pole from dumping store to Raja Talab store with loading & Unloading
Grouting of Stay, nozelling & fixing of stay wire etc.
Bifurcation of 11 KV overloaded feeders*
Loading unloading & carriage of Conductor, Earth rod, Stay set, G.I. wire, Angle, Channel etcfrom Raja Talab central store to site
Loading unloading & carriage of STP 11 Mtr longfrom Raja Talab central store to site
Loading unloading & carriage of 11 KV Cable, from Raja Talab central store to site
Erection grouting of 11 mtr D/P with fitting of all accessories including in cost of grouting material
Grouting & Nozzling of Stay including cost of Grouting material.
Laying & Dressing of U/G11 KV 3x185 sq mm XLPE cable D/C after digging of road including in cost of brick, Patiya & sand and C.I. Pipe required of Road X-ing as per NORMS
Laying & Dressing of U/G11 KV 3x185 sq mm XLPE cable through HDD Methode required of Road X-ing as per NORMS
Earthing of Pole by earthing rod
Fitting of Cable Marker with cost of Cable Marker
Jointing of 11 KV O/D H.S. J. Kit for 3x185 sq mm XLPE cable
Jointing of 11 KV S/T H.S. J. Kit for 3x185 sq mm XLPE cable
Hoisting of 11 KV 3x185 sq mm cable on Double Pole through G.I.Pipe of size 6' dia, 3 mtr long including its jumpring complete
Painting of STP 11 Mtr & fitting with 01 coat red oxide & 02 coat Allu. Paints after prepartion of sulface including cost of material
Additional LT Circuits*
Cartage of following material from Raja ka Talab Store to site including loading & unloading
Cartage of ABC Size (3x120+1x95+1x16) sqmm and Other material as per estimate
Cartage of S T Pole 9 meter long from Store to site including loading & unloading
Errection, grouting & plinthing of STP 9 Mtr including cost of grouting material
Erection & commissioning of (3x120) and 3x95 sq mm XLPE ABC with All accessories Dead end clamps, Suspension clamps, LT Cable S/C, Connector such as Clamp for pole and Eye Hook etc
Grouting of stay it nozelling fixing of stay wire complete including cost of grauting Material
Fixing of Dist. Boxes on LT Pole including all clamps and material for mounting, connection & sealing
Connection of Consumer service cable hrough distribution boxes after commissioning of ABC line.
Earthing of pole by earth rod
Painting of STP 11 mtr & fitting with one coat of Red-Oxide Post Man colour & two coat Al. Paints including cost of materials
Increasing Capacity of Distribution T/F from 63/100 to 250 KVA
Loading unloading & carriage of 250 KVA T/F from Raja Talab central store to site
Loading unloading & carriage of Other Material from Raja Talab central store to site
Dismentaling of old 100 KVA T/F and shuifting from work site to store including loading and unloadiung.
Errection & mounting of new 250 KVA T/F on existing D/P and making connection and jumpring by Laying of LT Cable
Sp. Earthing of 250 KVA T/F Netural or Body sepertaly Chemical pipe and connection with G.I. Strip off size 30x5 mm including cost of material
Increasing Capacity of Distribution Transformers from 250 to 400 KVA
Loading unloading & carriage of 400 KVA T/F and other material from Raja Talab central store to site
Dismentaling of old 250 KVA T/F and shuifting from work site to store including loading and unloadiung.
Errection & mounting of new 400 KVA T/F on existing D/P and making connection and jumpring by Laying of LT Cable
Sp. Earthing of 400 KVA T/F Netural or Body sepertaly Chemical pipe and connection with G.I. Strip off size 30x5 mm including cost of material
Increasing Capacity of Distribution T/F from 400/630 to Add. 250 KVA
Loading unloading & carriage of 250 KVA T/F from Raja Talab central store to site
Loading unloading & carriage of 9/11 Mtr ST Pole from Raja Talab central store to site
Loading unloading & carriage of condusctor, ABC Size (3x120+1x95+1x16) sq mm ,MS Channel, Angle, Disc, Pin, Earthing & Decentralised Materials from Raja Talab central store to site
Erection of D.P including grouting and plinthing of pole fitting fixing of S/S Base of M.S. Angle/Channel, fixing of all accessories
Laying and sagging of weasel for 11Kv line
Errection & mounting of 250 KVA T/F on D/P and making connection and jumpring.
Erection & commissioning of (3x120+1x95+1x16)sq mm XLPE ABC with All accessories Dead end clamps, Fixing of Dist. Boxes Suspension clamps, such as Clamp for pole and Eye Hook etc.
Errection of earthing rod
Fitting & fixing of LT bus bar
Painting of STP 9/11 mtr & fitting with one coat of Red-Oxide Post Man colour & two coat Al. Paints including cost of materials
Sp. Earthing of 250 KVA T/F Netural & Body sepertaly with Chemical pipe and connection with G.I. Strip off size 30x5 mm including cost of material
Replacement of Components in 33/11 kV SS
Loading unloading & carriage of all required materials including CT, Isolators, CRP,33kv vcb & Decentralised material etc. from store to site
Erection,connection,Fitting and testing of 33 KV lightening Arresters
Erection,connection,Fitting and testing of 33KV PT
Errection of 24 Volt battery and charger including all connection
Earthing of all equipment with earth strip
Earthing of DistributionTransfomers (chemical earthing)
Sp. Type earthing of Distribution transformer for Neutral or Body of diffrent capacity by Providing ans fixing of Chemical pipe and connectiom with the help of GI Strip 30x5 mm duly galvanized shall be used. Every DT shall have to such earthing one earthing for T/F Body and Second for Neutral both these points shall be connected to earth through GI strip (30x5 mm) separately. All required materials shall be supplied by the contractor.
Requirement of Mobile Distribution Transformer with Trolley*
Providing and fixing of movable trolly for 630 KVA Distribution transformer complete in all respect
Loading unloading & carriage of 630 KVA T/F from Raja Talab central store to site
Errection & mounting of 630 KVA T/F on new trolly and making connection and jumpring by Laying of LT Cable
Strengthening of L.T Line
Loading unloading & carriage of all material from Raja Talab central store to dump store and dump store to site
Fabrication of LT Bus Bar and fixing on existing DP then Bus Bar with ACSR Dog conductor
Fabrication of Areal Fuse unit and fixing on Bus Bar then making all LT circuit connection complete
Errection of LT Distribution Piller, Feeder Piller and Service piller alog with grouting and connection
Laying of LT cable by digging of road and providing of brick and sand
Lugging and connection of LT cable with service piller
Earthing of all LT Pannel
J S B INFRA
M/s adrsh Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .