| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-Finance | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹14.0 L+₹29,483.50 (2.15%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹14.3 L+₹57,265.25 (4.18%)Rejected-Finance | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹15.1 L+₹1.4 L (10.2%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 | |
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | jitendra prasad L4 | Mudit Lal Goel Contractor L3 | M/S SHREE JEE CONSTRUCTIONS L2 | M/S YOGESH ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 63.08 | CuM. | 67 ₹4,226.36 | 83.99 ₹5,298.09 | 50 ₹3,154 Lowest | 53.6 ₹3,381.09 |
| 2.00 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 19.22 | CuM. | 5,000 ₹96,100 | 5,384.35 ₹1,03,487.15 | 4,500 ₹86,490 Lowest | 4,800 ₹92,256 |
| 3.00 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 79.99 | CuM. | 6,800 ₹5,43,932 | 7,100 ₹5,67,929 | 7,000 ₹5,59,930 | 6,550 ₹5,23,934.5 Lowest |
| 4.00 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.) | 32.27 | CuM. | 5,000 ₹1,61,350 | 4,762.69 ₹1,53,692.17 Lowest | 5,500 ₹1,77,485 | 5,400 ₹1,74,258 |
| 5.00 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) | 54.82 | SqM. | 120 ₹6,578.4 | 80 ₹4,385.6 Lowest | 100 ₹5,482 | 108.17 ₹5,929.88 |
| 6.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 162.37 | SqM. | 550 ₹89,303.5 Lowest | 640 ₹1,03,916.8 | 700 ₹1,13,659 | 560 ₹90,927.2 |
| 7.00 | Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete (per M.T.) | 5.47 | M.T. | 64,500 ₹3,52,815 Lowest | 64,756.88 ₹3,54,220.12 | 76,000 ₹4,15,720 | 67,900 ₹3,71,413 |
| 8.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 2.4 | R.M. | 280 ₹672 | 235.17 ₹564.41 | 200 ₹480 Lowest | 234 ₹561.6 |
| 9.00 | Providing and laying Thermacol sheet in expention joint including i/c all cost of material, labour, T&P etc. complete | 3.3 | SqM. | 180 ₹594 | 151.18 ₹498.9 | 100 ₹330 Lowest | 580 ₹1,914 |
| 10.00 | Earth work for filling in approch road, repairing & strengthening of banks including all lift and all lead with rammimg & dressing, proper i/c all cost of material, labour, T&P etc. complete | 1,532.2 | CuM. | 155 ₹2,37,491 | 83.99 ₹1,28,689.48 | 20 ₹30,644 Lowest | 60 ₹91,932 |
Tender Value
₹17.1 L
EMD Value
₹34,260
Closing Date
14 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-08/EE/2026-27 New construction of bridge (box culvert) at Km 17.380 of Rajwaha Right Akbarpur. LOT-03
2026_UPIDC_1192818_3
TN-08/E.E/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹34,260
30 Oct 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
14 Oct 2026
5 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 63.08 | CuM. | - | - |
| 2 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 19.22 | CuM. | - | - |
| 3 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 79.99 | CuM. | - | - |
| 4 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.) | 32.27 | CuM. | - | - |
| 5 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) | 54.82 | SqM. | - | - |
| 6 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 162.37 | SqM. | - | - |
| 7 | Supplying & Laying TMT Steel bar Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete (per M.T.) | 5.47 | M.T. | - | - |
| 8 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 2.4 | R.M. | - | - |
| 9 | Providing and laying Thermacol sheet in expention joint including i/c all cost of material, labour, T&P etc. complete | 3.3 | SqM. | - | - |
| 10 | Earth work for filling in approch road, repairing & strengthening of banks including all lift and all lead with rammimg & dressing, proper i/c all cost of material, labour, T&P etc. complete | 1,532.2 | CuM. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.18 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2251479.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .