Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC VILL SORAIL SILCHAR KALAIN ROAD DIST CACHAR ASSAM | ₹4.9 L Quoted ₹5.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.4 LRejected-AOC | ₹5.4 L | L2 | Rejected-AOC Not L1 |
| Sl No | Description | Qty | Unit | NAZMUL HUSSAIN MAZARBHUIYA L2 | BASIR AHMED BARBHUIYA L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in foundation trenches etc. not exceeding 2 meters depth including dressing of bottom and sides of trenches and subsequent filling and compaction in 15cm layers as in column foundations,fence post,etc. and disposal of all surplus soil as directed within a lead of of 30 meters. (b) Hard Soil | 3.19 | Cum | 902 ₹2,877.38 | 900 ₹2,871 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches,plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m. | 4.52 | Cum | 900 ₹4,068 | 900 ₹4,068 |
| 3.00 | Providing and filling stone aggregates of size below 90mm in plinth,etc. in layers not exceeding 10 cm in depth, consolidating each layer by ramming and watering and dressing complete. | 0.75 | Cum | 6,500 ₹4,875 | 6,000 ₹4,500 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering-All work upto plinth level: 1:2:4 (1 cement :2 course sand :4 stone aggregate 20mm nominal size) | 2.27 | Cum | 13,000 ₹29,575 | 12,500 ₹28,437.50 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form form for all heights: (a) Foundations,footings,bases of columns etc. for mass concrete. | 5.7 | Sqm | 560 ₹3,192 | 550 ₹3,135 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form form for all heights: (a) Columns, pillars, piers, abutments, posts and struts. | 15.36 | Sqm | 580 ₹8,908.80 | 550 ₹8,448 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form form for all heights: (a) Lintels, beams, plinth beams, girders, bressumers and cantilevers, etc. | 23.27 | Sqm | 550 ₹12,798.50 | 550 ₹12,798.50 |
| 8.00 | Steel reinforcement for RCC work including straighthening,cutting, bending,placing in position and binding all complete. (a) Thermo-Mechanically treated bars of grade Fe-500 or more | 323.1 | Kg | 110 ₹35,541 | 105 ₹33,925.50 |
| 9.00 | Providing and laying in position reinforced cement concrete excluding cost of centering and shuttering ,finishing and reinforcement in - All work upto plinth level (a) 1: 1.5 :3 (1 cement :1.5 course sand :3 graded stone ) | 0.45 | Cum | 12,500 ₹5,625 | 12,500 ₹5,625 |
| 10.00 | Reinforced cement concrete work in walls including attached pillasters,columns,pillers, posts, piers, abutments, return walls, retaining walls, struts, buttresses, string or lacing courses, fillets etc. upto floor five level excluding cost of centering shuttering etc complete. (a) 1:1.5 :3 (1 cement :1.5 course sand :3 graded stone ) | 0.48 | Cum | 13,000 ₹6,240 | 12,500 ₹6,000 |
Tender Value
Refer Docs
EMD Value
₹23,000
Closing Date
29 Oct 2025, 4:00 pmClosed
Tuirial HPS, Mizoram
Tuirial HPS, Mizoram
Construction of Security Booth near Administrative building at THPS, Mizoram
2025_NEEPC_250673_1
THPS-14/2025
Open Tender
Civil Works - Buildings
120 days
Tuirial HPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹23,000
14 Jan 2026
27 Sept 2025
30 Oct 2025
27 Sept 2025
29 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
DrawingSecurityBoothAdminBuilding.pdf
Tender Documents • 0.53 MB
BidDocumentSecurityBoothnearAdminBuilding.pdf
Tender Documents • 0.95 MB
BOQ_287635.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid