Tender Value
₹15.3 L
EMD Value
₹30,660
Closing Date
22 Jul 2026, 6:00 pmClosed
eo office sadulshahar
ward no. 09 sadulshahar
Construction of a public toilet at the Tehsil office
2026_DLB_573914_2
802
Open Tender
Civil Works
Percentage
180 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
eo nagarpalika sadulshahar
₹30,660
Yes
9 Jul 2026
9 Jul 2026
23 Jul 2026
9 Jul 2026
22 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable materialand disposal of unserviceable material within 50 metres lead as per direction of Engineer-in charge. In cement mortar | 14.78 | cum | 462.5 | ₹6,835.66 |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 12.4 | cum | 930 | ₹11,532 |
| 3 | Dismantling of flushing cistern of any size including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead. | 5 | each | 593 | ₹2,965 |
| 4 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | 32.02 | cum | 229.5 | ₹7,347.67 |
| 5 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 6.92 | cum | 4,575 | ₹31,659 |
| 6 | Brick work with FPS bricks of class designation 75 in foundation and plinth in :Cement mortar 1:6 (1 cement : 6 coarse sand) | 29.6 | cum | 5,400 | ₹1,59,840 |
| 7 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 29.76 | cum | 178.5 | ₹5,312.16 |
| 8 | Brick work with FPS bricks of class designation 75 in superstructure above plinth level uptotwo stories in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 42.15 | cum | 6,300 | ₹2,65,545 |
| 9 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 37.95 | sqm | 426 | ₹16,166.7 |
| 10 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform. | 43.4 | sqm | 456 | ₹19,790.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_1020922.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .