| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.5 CrAccepted-AOC 519 P SECTOR 3 URBAN ESTATE KURUKSHETRA 136118 | KURUKSHETRA | KURUKSHETRA | HARYANA | 136118 | ₹9.5 Cr Quoted ₹9.7 Cr | L1 | Accepted-AOC OK |
| 2 | L2₹10.7 Cr+₹94.3 L (9.71%)Rejected-Finance 65 MODEL TOWN 136026 | KAITHAL | HARYANA | 136026 | ₹10.7 Cr+₹94.3 L (9.71%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Submission of Affadavit |
| 4 | Rejected-Technical SCF 55 SECTOR 7 URBAN ESTATE KURUKSHETRA 136118 | KURUKSHETRA | KURUKSHETRA | HARYANA | 136118 | - | - | Rejected-Technical Non Submission of Affadavit |
Tender Value
₹8.6 Cr
EMD Value
₹17.2 L
Closing Date
8 Mar 2022, 5:00 pmClosed
EXECUTIVE ENGINEER
PWD B AND R NIT CAMPUS KURUKSHETRA
Construction of New Road from Tangore to Jhansa with H.L Bridge over Markanda river in Kurukshetra District
2022_HRY_208529_1
TANGORETOJHANSA
Open Tender
Civil Works
Works
720 days
KURUKSHETRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹17.2 L
Yes
AMBALA
10 May 2022
17 Feb 2022
9 Mar 2022
17 Feb 2022
8 Mar 2022
17 Feb 2022
28 Feb 2022
Amount
Construction of Embankment with soil of CBR 8% (for new road) at RD Km. 0.00 to 2.657) with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications (Based on HSR17.6) Note: In case the quantity of earth work calculated with NSL and finished level found to be less than 27719.00cum. Then actual quantity (less than 27719.00cum) will be paid. In case quantity worked out is more than 27719.00cum, then only 27719.00cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 5 of DNIT. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer. (HSR 17.6)
Providing & laying Granular Sub-Base with Coarse Graded Material - Grading-I (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORT&H specifications. Grading I material Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer. (Based on HSR 17.15.1)
Providing & laying WBM (G-I) 63 to 45mm with screening of Type ‘A’ in layer of 75mm each, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.22.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying WBM (G-II) 53 mm to 22.4 mm with screening of Type ‘A’ in layer of 75mm each, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder VG – 10 using aggregate 13 mm nominal size 1.00 cum and bitumen 0.10 MT Per 100 Sqm & laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller complete as per technical clause 509 of MORT&H specifications:19 mm nominal chipping size, with bitumen (Based on HSR 17.32.3)
Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor @ 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications (HSR.17.26.2)
Providing and laying 30mm thick bituminous concrete (BC) with 100-120 TPH batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG -30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor controlto the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note: - I If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. II - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS – 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti – stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. (HSR.17.31.2)
Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within lead (HSR 17.75)
Earth work in excavation in all kind of soil by mechanical means Hydraulic excavator in foundation trenches or drains including dressing of sides and ramming of bottoms, lift up to any, including getting out the excavated soil and disposal of surplus excavated soil as directed by Engineer-in-charge, within any lead. (HSR 4.14.1)
Cement Concrete 1:8:16 with Over burnt (Jhama) Brick Aggregate: 90 mm to 40 mm size in foundation and plinth. (HSR 10.100.1)
Providing and laying in position cement concrete of specified grade 1:4:8 with stone aggregate 40 mm nominal size excluding the cost of centering and shuttering, complete in all respect. (HSR.6.1.6)
CEMENT CONCRETE Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 :2 :4 ( 1 Cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 40 mm nominal size). (HSR 6.1.3)
Brick work with common burnt clay non modular bricks of class designation 10.5 in foundation and plinth in cement Mortar 1:4. (HSR 7.21.1)
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (HSR 6.30.3)
12 mm cement plaster of mix : 1 :4 (1 cement: 4 fine sand) (HSR 11.5.3)
Providing and laying 600mm dia reinforced cement concrete pipe NP-4 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 :2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1000 mm dia, as per clause 2900 of MORT&H specifications Note: - Contractor shall supply bill of manufacture of pipes. Pipes should bear name of manufacturer and ISI mark along with bill duly valid ISI certificate of manufacturer should be supply. Without these bills certificate no payment shall be released. (HSR.17.61.1)
Raised and cut pointing on brick work with cement mortar 1 : 3 (HSR.11.25.2).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 : 1 ½: 3 ( 1 Cement: 1 ½ coarse sand (zone-Ill) : 3 cum graded stone aggregate 20 mm nominal size) (HSR 6.1.1)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size) (HSR 6.1.2)
Steel reinforcement Thermo-Mechanically Treated bars of grade Fe-500D or more for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level. Note: - Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 6.33.6)
Providing and laying Reinforced cement concrete 1:1½:3 with stone aggregate of 20mm nominal size in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement (HSR 6.16).
Providing and laying of flat brick or tile flooring with bricks of class designation 7.5 laid in cement sand mortar 1:4 on 100 mm thick cement concrete 1:8:16 and 100 mm sand filling and cement pointing 1:2 on top. (HSR 10.35.1)
12 mm cement plaster of mix 1 :6 (HSR.11.5.4)
White washing with lime to give an even shade HSR-30.23.1
Centering and shuttering including strutting, propping etc. and removal of form work for retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. (HSR 6.29.2)
Providing & fixing Reinforced cement concrete M-25 grade precast ordinary kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc complete as per technical clause 804 of MORTH Specifications (HSR.34.27.2)
Advance Direction signboard 1200x1200 square as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per dause 801 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012. Using retro reflective Sheeting Class C as per IRC 67 2012 (HSR 34.14.1)
Overhead sign board 6000x1500mm cantilever type single sided as per IRC 67-2012 with retro reflective Sheeting as per ASTM D 4956 - 09 and as per IRC 67 - 2012 fixed over 4mm thick Aluminium Composite Material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 40x40x6mm angle iron supported on designed single support system of MS pipe and plates in the form of a cantilever type truss made with 350NB pipe @50kg per metre as vertical support, 50NB pipe @ 4.50kg per metre and 40NB pipe @ 3.61kg per metre for truss including base plates, gusset plates, designed RCC foundation for fixing in ground complete as per clause 802 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent testlaboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012. Using high intensity Microprismatic grade retro reflective Sheeting Type IV as per ASTM D 4956 09 and as per IRC 67 2012. (HSR 34.20.2)
Reinforced cement concrete M 15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting In case of soft ground, a proper foundation may be provided as per approved design. In case foundation is required to be provided, the items of excavation and foundation concrete are required to be measured and paid separately. (HSR 34.28)
Providing & Marking center line / side line 2.5mm thick (minimum) with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use. (Based on HSR.34.26)
Reinforced Cement Concrete 1:1½:3 studs of standard design, fixed in position, i/c finishing with exterior paint & primer coat & one 100mm wide retro reflective prismatic band consisting of 3mm ACP having high intensity micro prismatic sheeting confirming to IRC: 67:2012 on it duly fixed with 5 numbers 2” long screws with roller plug complete in all respect.
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to any lead including removal and disposal of top organic soil as per technical clause 201 of MORT&H specifications.)In area of thorny jungle (By Manual Means) (HSR 17.2)
Construction of Embankment (for bridge portion) with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications Note:- Compensation for earth w ill vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth will not be required. The position is required to be cle arly stated in the cost estimate. (HSR 17.6) Note: In case the quantity of earth work calculated with NSL and finished level found to be less than 6516.34 cum. Then actual quantity (less than 2462.00cum) will be paid. In case quantity worked out is more than 6516.34cum, then only 6516.34cum will be paid. Excess quantity shall be incidental to work and nothing extra will be paid. Further it shall be ensured that atleast 500 mm of sub grade with earth of CBR 8% shall be constructed at each location. Wherever any cutting of existing subgrade is required on this account excavation as well as handling and disposal of earthwork to accommodate minimum 500mm thick subgrade of minimum 8% CBR shall be carried out by the agency at his own cost. Nothing extra will be paid on this account. Before start of work, L-section shall be got approved from the employer with respect to GTS. However, typical X-section attached at section 5 of DNIT. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Excavation for roadwork for widening in soil by mechanical means including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead as per technical clause 301 of MORT&H specifications. (Based on HSR 17.10.1)
Compaction & preparation of sub grade including loosening, levelling of earth layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications (Based on HSR 17.5.3)
Excavation for well cap, open foundations, Retaining Wall and Box Culvert through existing strata by mechanical means complete as per Drawings & Technical Specifications Clause 304 including all leads and lifts, dewatering and well compacted backfilling with excavated material upto ground level
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT H specifications to a thickness of notless than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behindabutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and MoRT&H Specification. (HSR 27.17)
PCC Grade M15 Note:- Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence not added in rate analysis of cement concrete works. (HSR 15.8.1)
Providing and Laying Cutting Edge of Mild Steel weighing 40 kg per metre for Well Foundation complete as per Drawing and Technical specification MORT&H clause 1200 & 1900. (HSR 15.10)
Sinking of 8 m external diameter well (other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level MORT&H clause 1200. Sandy Soil (HSR 15.19) Depth below bed level up to 3.0 M (HSR 15.19.1.1)
Beyond 3m up to 10 m depth (HSR 15.19.1.2)
Beyond 10 m up to 20m (HSR 15.19.1.3)
Sinking of 7 m external diameter well ( other than pneumatic method of sinking ) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per drawing and technical specifications. Depth of sinking is reckoned from bed level MORT&H clause 1200. Sandy Soil (HSR 15.18) Depth below bed level up to 3.0 M (HSR 15.18.1.1)
Beyond 3m up to 10 m depth (HSR 15.18.1.2)
Beyond 10 m up to 20m (HSR 15.18.1.3)
Plain/Reinforced Cement Concrete, in Well Foundations complete as per Drawing and Technical Specification, in Well Curb MORT&H clause 1200, 1500 & 1700. RCC M20 Grade With Batching Plant, Transit Mixer and Concrete Pump. (HSR 15.11.1.2)
Plain/Reinforced Cement Concrete, in Well Foundations complete as per Drawing and Technical Specification, in Well Steining RCC M25 Grade With Batching Plant, Transit Mixer and Concrete Pump. (HSR 15.12.5.2)
Foundations complete as per Drawing and Technical Specification, in Bottom Plug Concrete to be placed using tremie pipe Note: 10% extra cement to be added where under water concreting is involved. PCC Grade M20 Using Concrete Mixer (HSR 15.13.1.1)
Plain/Reinforced Cement Concrete, in Well Foundations complete as per Drawing and Technical Specification, in Well Cap RCC Grade M35 Using Batching Plant, Transit Mixer and Concrete Pump (HSR 15.16.4.2)
RCC Grade M35 Height up to 5m With Batching Plant, Transit Mixer and Conerete Pump. (HSR 27.12.1.2)
Plain/Reinforced Cement Concrete, in Well Foundations complete as per Drawing andTechnical Specification, in Well Steining RCC M40 Grade Using Batching Plant, Transit Mixer and Concrete Pump (HSR 15.12.9.1)
Steel reinforcement for R.C.C. work, where not included in thecomplete rate of RCC, including straightening, cutting, bending,placing in position, binding, wastage, overlaps, welded joints,spacer bars, chairs, stays, hangers and annealed steel wire etc.complete in all respect below plinth level Note:- Reinforcement shall be measured in length includinghooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. Thermo-Mechanically Treated bars of grade Fe-500D kgor more.(HSR 6.33.6)
RCC/PSC Grade M35 Using Concrete Mixer. For formwork and staging add the following: For T-beam & slab, 23-33 per cent of labour, material and machinery cost Height 5m to 10m (HSR 27.31.2.2)
PCC M15 Grade levelling course below approach slab complete as per drawing and MoRT&H MoRT&H specification clause 2700. (HSR 27.45)
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and MoRT&H specification clause 1500, 1600, 1700 & 2704. (HSR 27.46)
Provision of an Reinforced cement concrete crash barrier at the edges of the road,approaches to bridge structures and medians, constructed with M -20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO Ill dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified i) Excavation and backfilling are incidental to work and not to be measured separately. ii) Rate for RCC M 20 may be taken from chapter on super structure. (HSR 34.31)
Providing and laying (65mm thick) wearing course comprising of 40mm thick asphalt concrete overlaid by 25mm thick mastic asphalt including cost of prime coat, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, all complete as per Technical Specifications Clauses 509, 515 & Sub-clause 2702.1.2
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement up to 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation as per clause 2606 of MoRTH Specification (5th Revision, 2013). (HSR 27.55)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ retum wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1 V :20H towards drawing force. Complete as per drawing and MoRT&H Specifications (HSR 27.15)
Drainage Spouts complete as per drawing no. SD/205 and MoRT&H MoRT&H specification clause 2705 with 6 meter long GI 100 mm dia drainage GI light grade pipe (For Bridges). For fixing in position (HSR 27.44.2)
Bearing (rolled/Cast steel spherical bearing assembly of 250 tonne ) as per IRC: 83(Pt.-lV) section IX and clause 2014 of MoRTH specifications (RM166) Free Bearing V=160t
Guided Bearing V=160t
Fixed Bearing V=160t
Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1 :4 (1 cement: 4 coarse sand).Medium shade pigment using 50% white cement 50% cement (HSR 10.30.2)
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. Note:- 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2.Cost of painter is already included in hire charges of road marking machine. (HSR 34.26)
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408. Using Concrete Mixer (HSR 34.1.1)
Providing and erecting street light mounted on a steel circular hollow pole of standard specifications for street lighting, 9 m high spaced 20 m apart, 1.8 m overhang on both sides fixed in the median fitted with LED lamp (300 W) and fixed firmly in concrete foundation complete with electric cables, insulation, junction.
Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. (HSR 11.78)
100 mm dia PVC pipe. (B0241)
Providing and Laying 1200 mm Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row. concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1 :2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets 1200 mm dia, as per clause 2900 of MoRTH specifications.
Recovery Items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- NOTE:- Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price. Taking 50% bricks bats of
Taking 50% good bricks of
RCC Pipe 1200mm NP-4 NOTE:- All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shal be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purpose in case the agency quotes lesser than reserve price. NOTE:- 1. In case of any difference in the unit of nomenclature of any of the HSR/MORD Items depicted in this DNIT and that given HSR, the unit and nomenclature given in HSR /MORD shall be Applicable. 2. It may kindly be noted that the contractor would be obligated to carry out 05 years paid maintenance as per the rates fixed in the DNIT. However, the items of 05 years maintenance shall not be part of BOQ to avoid any confusion.
vijay kansal contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .