| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC B 1 146 SECTOR B ALIGANJ LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹20.8 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹21.0 LRejected-Finance 345 PANDAV NAGAR GAZIABAD | ₹21.0 L | L2 | Rejected-Finance HIGHER TO L1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical technically not qualified |
| Sl No | Description | Qty | Unit | UDAY ENGINEERS L1 | NIRMAL ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00REPLACEMENT OF SLUICE GATE | |||||
| 1.01 | Fabrication of Shutter Assembly (Size 1.50 x 1.50 mtr), Embedment parts, Super structure, lifting Mechanism of Shitlapur Head Regulator. Including cost of labour , material , scaffolding etc as required for proper completion of work | 1 | JOB | 6,98,000 ₹6,98,000 | 7,07,000 ₹7,07,000 |
| 1.02 | Fabrication of Shutter Assembly (Size 1.50 x 1.00 mtr) of Vishrampur Head Regulator, Embedment parts, Super structure, lifting Mechanism. Including cost of labour , material , scaffolding etc as required for proper completion of work | 1 | JOB | 6,69,900 ₹6,69,900 | 6,78,000 ₹6,78,000 |
| 1.03 | Erection of New Gate (Size 1.50 x 1.50 mtr) of Shitlapur Head Regulator. Dismantling of Old Gate, Testing and trial of gate after assembling of end box & roller assembly in gate and checking with loading and unloading with proper alignment including cost of labour , material , scaffolding etc as required for proper completion of work | 1 | JOB | 3,54,500 ₹3,54,500 | 3,59,200 ₹3,59,200 |
| 1.04 | Erection of New Gate (Size 1.50 x 1.00 mtr) of Vishrampur Head Regulator. Dismantling of Old Gate, Testing and trial of gate after assembling of end box & roller assembly in gate and checking with loading and unloading with proper alignment including cost of labour , material , scaffolding etc as required for proper completion of work. | 1 | JOB | 3,54,500 ₹3,54,500 | 3,59,200 ₹3,59,200 |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
9 Jan 2024, 3:00 pmClosed
works manager
IRRIGATION WORKSHOP DIVISION , BAREILLY
Rehabilitation and Improvement of Baghelkhand Dam by Replacing Head Regulator at Vishrampur and Sitlapur Under DRIP-II(Mechanical Work) in Balrampur District of Uttar Pradesh.
2023_UPIDM_868416_1
06/WM/IWDB/2023-24
Open Tender
Miscellaneous Works
365 days
Baghelkhand Dam
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹42,000
Yes
IRRIGATION WORKSHOP DIVISION , BAREILLY
19 Jun 2026
7 Dec 2023
9 Jan 2024
7 Dec 2023
9 Jan 2024
7 Dec 2023
18 Dec 2023
Amount
REPLACEMENT OF SLUICE GATE
Fabrication of Shutter Assembly (Size 1.50 x 1.50 mtr), Embedment parts, Super structure, lifting Mechanism of Shitlapur Head Regulator. Including cost of labour , material , scaffolding etc as required for proper completion of work
Fabrication of Shutter Assembly (Size 1.50 x 1.00 mtr) of Vishrampur Head Regulator, Embedment parts, Super structure, lifting Mechanism. Including cost of labour , material , scaffolding etc as required for proper completion of work
Erection of New Gate (Size 1.50 x 1.50 mtr) of Shitlapur Head Regulator. Dismantling of Old Gate, Testing and trial of gate after assembling of end box & roller assembly in gate and checking with loading and unloading with proper alignment including cost of labour , material , scaffolding etc as required for proper completion of work
Erection of New Gate (Size 1.50 x 1.00 mtr) of Vishrampur Head Regulator. Dismantling of Old Gate, Testing and trial of gate after assembling of end box & roller assembly in gate and checking with loading and unloading with proper alignment including cost of labour , material , scaffolding etc as required for proper completion of work.
NIRMAL ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid