Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.6 L+₹76,208.49 (9.73%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.7 L+₹82,885.98 (10.6%)Rejected-AOC 127 A JAMES LONG SARANI NANDAN PALLY KOLKATA 700008 | KOLKATA | KOLKATA | WEST BENGAL | 700008 | L3 | Rejected-AOC L3 |
Tender Value
Refer Docs
EMD Value
₹15,700
Closing Date
29 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
the D.G. (E)
15n Nellie Sengupta Sarani Kolkata-700 087
OPERATION AND MAINTENANCE OF ELECTRIC FURNACE AT KASHIMITRA BURNING GHAT
2024_KMC_769857_1
KMC/LTG/OM/05/CRK/FUR/24-25
Open Tender
Electrical Work/ Equipment
Item Rate
365 days
KASHIMITRA BURNING GHAT
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,700
7 Jan 2025
15 Nov 2024
2 Dec 2024
15 Nov 2024
29 Nov 2024
15 Nov 2024
Amount
Engagement of three (03) nos. Electrical Furnace Operators ( Skilled Category) in 3 shift during 24 hrs. having ability of fault-finding of furnace, minor repairing connected with the electrical and mechanical works including experience of trolley movement system. (As per Mpl. Secretary's Circular No. 04 of 2024-25 dt. 21.06.2024).
Proportionate Casual Leave imposed as per Mpl. Secretary's Circular No.23 of 2012-13 dt.10.12.2012 vide the MIC Item No.M 39.7 dt.14.08.2012. adding the total wages amount 4.53%.
Engagement of a Reliever for operators (Skilled category) in the weekly off-Days (As per Mpl. Secretary's Circular No. 04 of 2024-25 dt. 21.06.2024). Total nos. of off-days for an operator in a year = 52 nos. Total off -days for three (03) nos. operators = (52 X 3) nos. = 156 nos. Total working days for Relieve throughout year = 156 Days
Labour charges for cleaning the inside of Duct Passage by opening inspection cover with Vacuum Cleaner and manually.
Labour charges for cleaning and checking the major parts by opening the charging trolley.
Labour charges for cleaning the Chain Sprocket by opening back portion of the front door and adjusting the counter balancing weight to make free movement of the door.
SIMPLE ENGINEERING AND CO. (BID ID -5763755)
S S ENTERPRISE (BID ID -5763738)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .