Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC 94 PHASE II HOUSEING COLONY UDHAMPUR J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.7 Cr | L1 | Accepted-AOC Lowest |
| 2 | L2₹1.8 Cr+₹8.3 L (4.91%)Rejected-Finance | ₹1.8 Cr+₹8.3 L (4.91%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹1.9 Cr+₹18.7 L (11.0%)Rejected-Finance ASTBAL MOHALLA BANASAR BAGH ROAD PATIALA GATE SANGRUR 148001 | SANGRUR | SANGRUR | PUNJAB | 148001 | ₹1.9 Cr+₹18.7 L (11.0%) | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹1.9 Cr+₹21.8 L (12.9%)Rejected-Finance HOUSE NO 5 WARD NO 8 UDHAMPUR 182101 J K | UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.9 Cr+₹21.8 L (12.9%) | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹1.9 Cr+₹24.1 L (14.2%)Rejected-Finance NEAR INDUSTRIAL ESTATE THANDA PADDAR UDHAMPUR J K 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.9 Cr+₹24.1 L (14.2%) | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | M/S Inderjit Sharma and Co. L10 | SHIVAE CONSTRUCTION L1 | vijay builders L9 | V K Sales and Construction Co L13 | JINDAL BUILDERS L12 | K S BUILDERS L5 | M/S KIRAN CONSTRUCTIONS L8 | Onkar Nath Bhalla And Sons Contractor Pvt. Ltd. L11 | bamral builder L6 | M/S GURU DEV BUILDERS L2 | NARINDER KUMAR SONS L3 | M/s Rukmani Construction Company L4 | d d builders L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in any type of soil complete all as specified and as directed. | 3,500 | Sqm | 40 ₹1,40,000 | 25 ₹87,500 | 90 ₹3,15,000 | 27 ₹94,500 | 45 ₹1,57,500 | 46 ₹1,61,000 | 40 ₹1,40,000 | 15 ₹52,500 | 21 ₹73,500 | 21 ₹73,500 | 10 ₹35,000 Lowest | 30 ₹1,05,000 | 77 ₹2,69,500 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth but not exceeding 1.5m in depth, exceeding 1.5m in width as well as 10 sqm on plan) including getting out in all kind of soil and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by Engineer-in charge | 2,536 | Cum | 200 ₹5,07,200 | 170 ₹4,31,120 | 300 ₹7,60,800 | 67 ₹1,69,912 Lowest | 180 ₹4,56,480 | 186 ₹4,71,696 | 175 ₹4,43,800 | 150 ₹3,80,400 | 169 ₹4,28,584 | 70 ₹1,77,520 | 100 ₹2,53,600 | 150 ₹3,80,400 | 150 ₹3,80,400 |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5m in depth but not exceeding 3m depth, 1.5 m in width as well as 10 sqm on plan) including getting out in all kind of soil and disposal of excavated earth lead upto 50 m and lift upto 3m, as directed by Engineer-in charge | 200 | Cum | 230 ₹46,000 | 170 ₹34,000 | 300 ₹60,000 | 108 ₹21,600 | 207 ₹41,400 | 206 ₹41,200 | 175 ₹35,000 | 150 ₹30,000 | 169 ₹33,800 | 104 ₹20,800 | 100 ₹20,000 Lowest | 200 ₹40,000 | 150 ₹30,000 |
| 4.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 30cm in depth but not exceeding 1.5m depth, exceeding 1.5m in width as well as 10sqm on plan) including getting out in ordinary rock and disposal of excavated earth lead upto 50m and lift upto 1.5m, complete all as specified and as directed. | 283 | Cum | 230 ₹65,090 | 225 ₹63,675 | 300 ₹84,900 | 138 ₹39,054 | 315 ₹89,145 | 206 ₹58,298 | 175 ₹49,525 | 150 ₹42,450 | 169 ₹47,827 | 138 ₹39,054 | 100 ₹28,300 Lowest | 200 ₹56,600 | 150 ₹42,450 |
| 5.00 | Earth work in excavation by mechanical means (Hydraulic excavator) means over areas (exceeding 1.5m in depth and not exceeding 3.00m, exceeding 1.5m in width as well as 10sqm on plan) including getting out in ordinary rock and disposal of excavated earth lead upto 50m and lift upto 3m, as directed by Engineer-in charge. | 41 | Cum | 250 ₹10,250 | 250 ₹10,250 | 250 ₹10,250 | 204 ₹8,364 | 387 ₹15,867 | 186 ₹7,626 | 175 ₹7,175 | 150 ₹6,150 | 169 ₹6,929 | 210 ₹8,610 | 100 ₹4,100 Lowest | 200 ₹8,200 | 150 ₹6,150 |
| 6.00 | Forming embankment including raising (or lowering) earth, spreading in layers not exceeding 30cm thick, watering, ramming/rolling and finishing to required size, shape etc; not exceeding 1.5m high from the base complete all as specified and directed. | 1,500 | Cum | 80 ₹1,20,000 | 180 ₹2,70,000 | 250 ₹3,75,000 | 455 ₹6,82,500 | 126 ₹1,89,000 | 76 ₹1,14,000 | 250 ₹3,75,000 | 150 ₹2,25,000 | 69 ₹1,03,500 | 81 ₹1,21,500 | 50 ₹75,000 Lowest | 60 ₹90,000 | 150 ₹2,25,000 |
| 7.00 | Forming embankments including raising (or lowering) earth, spreading in layers not exceeding 30 cm thick; watering, ramming/rolling and finishing to equired size, shape etc., exceeding 1.5m but not exceeding 3.00 mtr high from base complete all as specified and directed. | 300 | Cum | 80 ₹24,000 | 250 ₹75,000 | 400 ₹1,20,000 | 445 ₹1,33,500 | 153 ₹45,900 | 166 ₹49,800 | 300 ₹90,000 | 250 ₹75,000 | 69 ₹20,700 | 160 ₹48,000 | 50 ₹15,000 Lowest | 100 ₹30,000 | 150 ₹45,000 |
| 8.00 | Framed work as in doors or gates of angle or other section with gusset plates, rails, braces, etc., complete, drilled for fixing of steel sheeting or other covering. doors etc; to be prepared for hanging or sliding with and including either hooks and hinges or steel hanging door fittings (exclusive of steel sheeting or other covering, running rails and guides) and hanging; also fastening and fixing conforming to Fe 410 -W(Gde E- 250) quality A, complete all as specified and directed. | 200 | Kg | 90 ₹18,000 | 95 ₹19,000 | 120 ₹24,000 | 102 ₹20,400 | 108 ₹21,600 | 104 ₹20,800 | 125 ₹25,000 | 150 ₹30,000 | 95 ₹19,000 | 120 ₹24,000 | 100 ₹20,000 | 125 ₹25,000 | 85 ₹17,000 Lowest |
| 9.00 | Demolition of Brickwork or stone/ boulder masonry, laid dry including stacking the serviceable materials within 100m and disposal of underviceable material, debris and rubbish to a distance not exceeding 100m complete all as specified and directed. | 144 | Cum | 350 ₹50,400 | 50 ₹7,200 | 250 ₹36,000 | 125 ₹18,000 | 270 ₹38,880 | 46 ₹6,624 | 300 ₹43,200 | 500 ₹72,000 | 90 ₹12,960 | 145 ₹20,880 | 100 ₹14,400 | 100 ₹14,400 | 20 ₹2,880 Lowest |
| 10.00 | Demolition of Brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles including stacking the serviceable materials within 100m and disposal of underviceable material, debris and rubbish to a distance not exceeding 100m complete all as specified and directed. | 112.5 | Cum | 350 ₹39,375 | 100 ₹11,250 | 200 ₹22,500 | 125 ₹14,062.5 | 351 ₹39,487.5 | 46 ₹5,175 Lowest | 300 ₹33,750 | 500 ₹56,250 | 90 ₹10,125 | 145 ₹16,312.5 | 100 ₹11,250 | 300 ₹33,750 | 50 ₹5,625 |
Tender Value
₹2.4 Cr
EMD Value
₹3.2 L
Closing Date
15 Sept 2025, 6:00 pmClosed
Chief Engineer Udhampur Zone
HQ Chief Engineer Udhampur Zone, PIN-900386, C/O 56 APO
PROVN OF PARKING FACILITY UNDER GE (N) UDHAMPUR
2025_MES_726447_1
87971-A/E8
Open Tender
Civil Works
Item Rate
365 days
Udhampur
As per NIT
8 documents required · 8 mandatory
₹2,000
GE (N) Udhampur
₹3.2 L
Yes
HQ Chief Engineer Udhampur Zone
1 Nov 2025
19 Aug 2025
17 Sept 2025
19 Aug 2025
15 Sept 2025
9 Sept 2025
19 Aug 2025 - 8 Sept 2025
24 Aug 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .