Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹4.7 L
Closing Date
9 Jul 2026, 5:00 pm
Similar tender results from the same govt authority in the past 3 years.
General Manager
General Manager, UPSIDA Head Office Kanpur
Construction of Balance R.C.C Central Verge and P/L of Railing at I.A. Surajpur Site-5 Kasna Distt- G.B. Nagar.
2026_SIDC_1161649_1
CD_II_77_DT_05062026
Open Tender
Civil Works
180 days
G.B. Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,731
UPSIDA
₹4.7 L
18 Jun 2026
18 Jun 2026
9 Jul 2026
18 Jun 2026
9 Jul 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Foundation including in ordinary soil (Loam clay, or sand) wtering lift upto 1.5meter and lead upto 30m. including filling. the sides and of foundation ramming of excavated earth into the trenches or into disposal trenches or into the plinth and removal and of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. | 1,117.89 | Cum | 110 | ₹1,22,967.9 |
| 2 | Concrete with 4cm gauge stone ballast, coarse sand & cement in poroportion of 8:4:1 (8 graded stone aggregate: 4 coarse sand : 1cement :) including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 390.5 | Cum | 6,100 | ₹23,82,050 |
| 3 | R.C.C. work with cement, approved coarse sand & 2cm gauge approved stone grit in proportion of 1:1.5:3 in RCC Raft foundation footing and RCC column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc and also including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 726.86 | Cum | 9,310 | ₹67,67,066.6 |
| 4 | M.S. (tor Steel or plain) in Plain work such as R.C.C. work
including beding for proper shape as necessary including bending
for proper complition of the work and including supply of all
material and wastage, bend hooks, and authorised overlapping
shall be measured labour and T&P etc. required for proper
completion of the work as per direction of Engineer-in-Charge.
Work Including cost of binding wire | 57,058.51 | Kg | 86.86 | ₹49,56,102.18 |
| 5 | Taking out existing kerb stones of all types from footpath/ central
verge, including removal of mortar etc., disposal of unserviceable
material to the dumping ground, for which payment shall be made
separately and stacking of serviceable material within 50 metre
lead as per direction of Engineer-in-Charge. | 7,100 | Rm | 30 | ₹2,13,000 |
| 6 | Laying at or near ground level old kerb stones of all types in
position to the required line, level and curvature, jointed with
cement mortar 1:3 (1 cement: 3 coarse sand), including making
joints with or without grooves (thickness of joints, except at sharp
curve, shall not be more than 5 mm), including making drainage
opening wherever required etc. complete as per direction of
Engineer-in-charge. (Length of finished kerb edging shall be
measured for payment). (Old kerb stones shall be supplied by the
department free of cost) | 3,550 | Rm | 83.45 | ₹2,96,247.5 |
| 7 | Concrete with 2cm gauge stone grit, coarse and cement in
proportion of 4:2:1 including supply of all material, labour and T&P
etc. required for proper completion of the work as per direction of
Engineer-in-Charge. | 12.96 | Cum | 7,050 | ₹91,368 |
| 8 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including qutting, hoisting, fixing in position and applying a priming coat of approved stèel primer, including welding and bolted with special shaped washers etc. 10.16.1 Hot finished welded type tu | 28,200 | Kg | 148.22 | ₹41,79,804 |
| 9 | Painting priming and roofs or othe iron work in large areas with one coat two coat of approved (above or equivlent) including supply of all materials, labour Tools & plants etc. required for proper completionof the work. | 3,905 | Sqm | 100 | ₹3,90,500 |
| 10 | Providing wall putty on new surface with approved quality material of Berger/J.K./Birla or similar make 2 coats. | 1,065 | Sqm | 90 | ₹95,850 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
feeformat.xls
Tender Documents • 0.02 MB
BOQ_2177510.xls
BOQ • 0.30 MB
etenderdocuments.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid