Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹352.8 CrRejected-Finance | ₹352.8 Cr | L1 | Rejected-Finance Negotiated Bid Price is plus Seven Point Six Four percentage is too high over the current departmental value hence Board has decided to reject |
| 2 | L2₹365.4 CrRejected-Finance | ₹365.4 Cr | L2 | Rejected-Finance Plus Twenty Eight Point One Seven percentage excess over the current departmental value hence the L2 bidder have also been rejected |
Tender Value
₹280 Cr
EMD Value
₹1.4 Cr
Closing Date
10 May 2022, 3:00 pmClosed
The Chief Engineer TWAD Coimbatore
Office of The Chief Engineer TWAD Board No 30 Siruvani Nagar Bharathipark Road Coimbatore 641 043
CWSS to Rasipuram Municipality 8 Town Panchayats and certain other rural habitations in Namakkal District Package 2 Construction period 18 months Trial Run 6 months and Paid Maintenance 60 months
2022_TWAD_227289_1
IFB16CWSStoRasipuramPackage2
Open Tender
Civil Works
547 days
Rasipuram Municipality in Namakkal District
As per Clause 7.2 in the Technical Bid
3 documents required · 3 mandatory
₹0
₹1.4 Cr
Yes
Office of The Chief Engineer TWAD Board Coimbatore
10 Feb 2023
25 Mar 2022
11 May 2022
25 Mar 2022
10 May 2022
25 Mar 2022
25 Mar 2022 - 26 Apr 2022
13 Apr 2022
Booster Stations allied mechanical and civil works at Various Locations
Construction of Ground level Sump at Various Locations
Construction of Pumprooms at various locations
Construction of Compound wall at Various locations
Construction of 'C' type Quarters at Mallasamudram Intermediate Booster Station
Construction of 'B' type Quarters at Rasipuram Intermediate Booster Station
Construction of Toilet cum Bath of Size - 3 x 3 x 3 m at various locations
Construction of Security Room, HT & LT Panel Room, Compressor room and Office Room
Supply, Delivery, Erection, Testing and Commissioning of Clear Water Horizontal split casing Centrifugal Pumpset and Open Well submersible Pumpsets
Constructions of various capacities of Over Head Tank at Town Panchayats
Pumping main, Branches, Urban Feeder main and Distribution systems in 8 Town Panchayats :-
Pumping main (DI Pipes) from various Booster Stations to Group Sumps
Pumping main (HDPE Pipes) from various Booster Station to Group sumps
Urban Feeder Main from various Booster Stations to Group Sumps at 8 Town Panchayats
Distribution System in 8 Town Panchayats
House service Connection in 8 Town Panchayats
Rural feeder mains, Sumps, Pumpsets, Service Reservoirs, Distribution System and allied works in 4 unions
Rural Feeder Mains in Namagiripettai, Puduchatram, Vennadhur and Rasipuram Unions
Constructions of Ground Level Sumps of Various Capacities in Rural Areas
Construction of Pumprooms of Various Sizes in Rural Areas
Construction of Compound wall for Sumps in Namagiripettai, Puduchatram, Vennadhur and Rasipuram Unions
Construction of Over Head Tank of Various Capacities in Rural Areas
Supply, delivery and erection of Open Well Submersible Pumpsets in Namagiripettai Union
Supply, delivery and erection of Open Well Submersible Pumpsets in Puduchatram Union
Supply, delivery and erection of Open Well Submersible Pumpsets in Vennandur Union
Supply, delivery and erection of Open Well Submersible Pumpsets in Rasipuram Union
Annual Maintenance charges (Excluding energy charges) to be paid during contractor's maintenance period for 5 years
GVPR ENGINEERS LIMITED
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid