Loading…
Loading…
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
31 Aug 2026, 4:00 pm3d left
ADGP Hqrs PHQ
Srinagar
Construction
2026_DGPJK_321189_1
e-NIT/EE-PCD/PHQ/69/2026-27
Open Tender
Civil Works
Percentage
365 days
14th Bn Manasbal
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
Exen PCD PHQ
₹9.2 L
PCD PHQ Srinagar
18 Aug 2026
18 Aug 2026
1 Sept 2026
18 Aug 2026
31 Aug 2026
22 Aug 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil. | 758.75 | Cum | 256.85 | ₹1,94,884.94 |
| - | Providing and laying of stone soling / boulders hand packed dry including ramming, dressing, watering all complete and cost of material involved complete. | 95.07 | Cum | 1,100 | ₹1,04,577 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 45.83 | Cum | 5,202.9 | ₹2,38,448.91 |
| - | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge.
Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately All works upto plinth level | 298.81 | Cum | 8,021.1 | ₹23,96,784.89 |
| - | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge.
Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately All works above plinth level upto floor V level | 348.13 | Sqm | 9,412.05 | ₹32,76,616.97 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 55.27 | Cum | 5,733.6 | ₹3,16,896.07 |
| - | Dry random rubble masonry with hard stone in foundation and plinth with bond stone (Quarry) | 66.75 | Cum | 5,536.55 | ₹3,69,564.71 |
| - | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 399.87 | Cum | 218.4 | ₹87,331.61 |
| - | Supplying and filling in plinth with fine/sand under floors including, watering, ramming consolidating and dressing complete | 267.86 | Cum | 1,204.5 | ₹3,22,637.37 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,00,277.03 | Kg | 123.2 | ₹1,23,54,130.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
Tendernotice_2.pdf
PDF • 16.86 MB
BOQ_1071687.xls
BOQ • 7.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].