Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹0.99Admitted-Finance | ₹0.99 | L1 | Admitted-Finance |
| 2 | L2₹1.33Admitted-Finance 52 A 6TH FLOOR INDUSTRIAL DIVISION ADI SHANKARACHARYA MARG OPP POWAI LAKE POWAI MUMBAI MUMBAI MAHARASHTRA 400072 MH19E0037546 27AADCI5198M1ZX B M R MSME STATUS AS NOT VERIFIED | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹1.33 | L2 | Admitted-Finance |
| 3 | L3₹2.20Admitted-Finance 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | ₹2.20 | L3 | Admitted-Finance |
| 4 | L4₹2.35Admitted-Finance GROUND FLOOR 72 BUSINESS PARK CROSS ROAD C MAROL INDUSTRIAL AREA MIDC ANDHERI EAST MUMBAI MUMBAI MAHARASHTRA 400093 | MUMBAI SUBURBAN | MAHARASHTRA | 400093 | ₹2.35 | L4 | Admitted-Finance |
| 5 | L5₹2.97Admitted-Finance | ₹2.97 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | IRCLASS Systems and Solutions Private Limited L2 | CMEC CONSULTING ENGINEERS PVT. LTD. L5 | Bureau Veritas (India) Pvt. Ltd L4 | National Council for Cement and Building Materials L1 | rites limited L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | The bidder's charges towards Third Party Inspection & Quality Control/Assurance for the works:
1. Construction and Widening of Concrete Road, Retaining Walls etc. in Harbour area.
2. Construction of Retaining Walls in the Stack yard (MCHP area).
(To be quoted as consolidated percentage inclusive of all duties, cess all other incidentals like transport, insurance etc excluding GST as applicable).
NB: The payment will be released in percentage basis proportionate to the release of R/A Bills of the contracting agency for the project works. | 1 | PERCENTAGE | 1.33 ₹1.33 | 2.97 ₹2.97 | 2.35 ₹2.35 | 0.99 ₹0.99 | 2.2 ₹2.20 |
Tender Value
₹58.1 Cr
EMD Value
₹50,000
Closing Date
20 Sept 2022, 5:15 pmClosed
P. K. Mohanty,EE,HWD-I,PPA
Office of the Harbour Works Division No.I, Engineering Department, Paradip Port Authority, First Floor, Administrative Building, Mob-9938935675
Third Party Inspection and Quality Control/ Assurance for the works 1. Construction and Widening of Concrete Road, Retaining Walls etc. in Harbour area. 2. Construction of Retaining Walls in the Stack yard (MCHP area).
2022_MoS_709457_1
CE/HWDI/ACCTS-39/21(Pt-I)/401
Open Tender
Civil Works
547 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
As per eTCN and TD.
₹50,000
Yes
6 Jan 2023
30 Aug 2022
21 Sept 2022
30 Aug 2022
20 Sept 2022
30 Aug 2022
Amount
The bidder's charges towards Third Party Inspection & Quality Control/Assurance for the works: 1. Construction and Widening of Concrete Road, Retaining Walls etc. in Harbour area. 2. Construction of Retaining Walls in the Stack yard (MCHP area). (To be quoted as consolidated percentage inclusive of all duties, cess all other incidentals like transport, insurance etc excluding GST as applicable). NB: The payment will be released in percentage basis proportionate to the release of R/A Bills of the contracting agency for the project works.
IRCLASS Systems and Solutions Private Limited
rites limited
Bureau Veritas (India) Pvt. Ltd
CMEC CONSULTING ENGINEERS PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_746382.xls
BOQ • 0.27 MB
TPQATD.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid