Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.2 CrAccepted-AOC 332 1 CORPORATE MILLER 3RD FLOOR THIMMAIAH ROAD VASANTH NAGAR BANGALORE KARNATAKA 560052 | BENGALURU URBAN | KARNATAKA | 560052 | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹18.9 Cr+₹1.2 Cr (6.91%)Rejected-Finance 2 302 A UDS SALAI OFF OLD MAHABALIPURAM ROAD THORAIPAKKAM KANCHIPURAM TAMIL NADU 600097 | CHENNAI | TAMIL NADU | 600097 | L2 | Rejected-Finance Other than L1 | |
| 3 | Rejected-Technical 15 5 1ST MAIN 2ND CROSS K S TOWN BANGALORE BANGALORE RURAL KARNATAKA 560060 | BENGALURU URBAN | KARNATAKA | 560060 | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | Updater Services Limited L2 | Dusters Total Solutions Services Pvt. Ltd. L1 |
|---|---|---|---|---|---|
| 1.00Schedule-A (Mechanical Part-1) | |||||
| 1.01 | Carryingout the Operation and Monitoring of Centralized Air conditioning systems, DX AC Plants, Air Cooling and Ventilation System installed in Factory premises, as per the scope of work detailed in Clause No 2.1 of Annexure-A1, and for list of assets/areas indicated in Table 1A of Annexure-A2, or as directed by Engineer-in-charge etc., complete. | 12 | Per Month | 2,47,635.64 ₹29,71,627.68 | 2,21,867.1 ₹26,62,405.2 Lowest |
| 1.02 | Carryingout the Comprehensive Maintenance of FRP type Cooling Towers installed at CCP-I,CCP-II,ETD QA, EMI/EMC Chiller Plant in Factory premises, as per the scope of work detailed in Clause No 2.2.1 of Annexure-A1, and for list of assets/areas indicated in Table 1B of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (14nos. x 04 service) | 56 | Each Service | 14,837.76 ₹8,30,914.56 Lowest | 28,500 ₹15,96,000 |
| 1.03 | Carryingout the Comprehensive Maintenance of AHUs and Fan coiled units connected to central chiller plants in Factory premises, as per the scope of work detailed in Clause No 2.2.2 of Annexure-A1 and for list of assets/areas indicated in Table 1C of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (101 nos. x 03 service) | 303 | Each Service | 2,156 ₹6,53,268 | 1,496.25 ₹4,53,363.75 Lowest |
| 1.04 | Carryingout Comprehensive Maintenance of pumps installed at CCP-I,CCP-II,ETD QA, EMI/EMC Chiller Plant in Factory premises, as per the scope of work detailed in Clause No 2.2.3 of Annexure-A1 and for list of assets/areas indicated in Table 1D of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (39nos. x 02 service) | 78 | Each Service | 6,440 ₹5,02,320 | 3,990 ₹3,11,220 Lowest |
| 1.05 | Carrying out Annual maintenance Contract for screw chilling unit for McQuay make as per the scope of work detailed in Clause No 2.2.4 of Annexure-A1 and for list of assets/areas indicated in Table 1E of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (07 Nos x 3 service) | 21 | Each Service | 39,200 ₹8,23,200 Lowest | 75,075 ₹15,76,575 |
| 1.06 | Carrying out Annual maintenance Contract for screw chilling unit for Dunham Bush make as per the scope of work detailed in Clause No 2.2.4 of Annexure-A1 and for list of assets/areas indicated in Table 1F of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (06 Nos x 3 service) | 18 | Each Service | 1,83,630.22 ₹33,05,343.96 | 41,266.17 ₹7,42,791.06 Lowest |
| 1.07 | Carryingout the Operation and Monitoring of Centralized Air conditioning systems, DX AC Plants, Air Cooling and Ventilation System installed in Factory premises, as and when required (except regular shifts operated in SOQR No. 1.01) for Sundays/holidays/on need basis during working days etc., as per the scope of work detailed in clause No.2.1 of Annexure-A1 and for the list of assets/areas indicated in Table 1A of Annexure-A2 or as directed by Engineer-in-charge etc. | 850 | Per Man Day | 1,299 ₹11,04,150 | 1,219.05 ₹10,36,192.5 Lowest |
| 1.08 | Carrying out the Comprehensive Maintenance of DX type Air Conditioning System as per the scope of work detailed in Clause No 2.3.1 of Annexure-A1 and for list of assets/areas indicated in Table 2A of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (18 Nos.X02 Service) | 36 | Each Service | 8,772.96 ₹3,15,826.56 Lowest | 14,000 ₹5,04,000 |
| 1.09 | Carrying out the Comprehensive Maintenance of Air Cooling/Ventilation Plants as per the scope of work detailed in Clause No 2.3.2 of Annexure-A1 and for list of assets/areas indicated in Table 2B of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (15 Nos.X2 Service) | 30 | Each Service | 38,536.96 ₹11,56,108.8 | 35,700 ₹10,71,000 Lowest |
Tender Value
₹14.1 Cr
EMD Value
₹5 L
Closing Date
8 Jul 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. Gen. Manager (Contracts)
ES/Contracts, BEL, Bangalore - 560013
Annual Contract for Management of Facilities in BE Factory.
2024_BEL_95048_1
06/000005/2024
Open Tender
Miscellaneous
Item Rate
730 days
BEL, Bangalore
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹5 L
Yes
video conferencing
21 Nov 2024
5 Jun 2024
8 Jul 2024
5 Jun 2024
8 Jul 2024
5 Jun 2024
5 Jun 2024 - 11 Jun 2024
12 Jun 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule-A (Mechanical Part-1) | |||||
| 1.01 | Carryingout the Operation and Monitoring of Centralized Air conditioning systems, DX AC Plants, Air Cooling and Ventilation System installed in Factory premises, as per the scope of work detailed in Clause No 2.1 of Annexure-A1, and for list of assets/areas indicated in Table 1A of Annexure-A2, or as directed by Engineer-in-charge etc., complete. | 12 | Per Month | - | - |
| 1.02 | Carryingout the Comprehensive Maintenance of FRP type Cooling Towers installed at CCP-I,CCP-II,ETD QA, EMI/EMC Chiller Plant in Factory premises, as per the scope of work detailed in Clause No 2.2.1 of Annexure-A1, and for list of assets/areas indicated in Table 1B of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (14nos. x 04 service) | 56 | Each Service | - | - |
| 1.03 | Carryingout the Comprehensive Maintenance of AHUs and Fan coiled units connected to central chiller plants in Factory premises, as per the scope of work detailed in Clause No 2.2.2 of Annexure-A1 and for list of assets/areas indicated in Table 1C of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (101 nos. x 03 service) | 303 | Each Service | - | - |
| 1.04 | Carryingout Comprehensive Maintenance of pumps installed at CCP-I,CCP-II,ETD QA, EMI/EMC Chiller Plant in Factory premises, as per the scope of work detailed in Clause No 2.2.3 of Annexure-A1 and for list of assets/areas indicated in Table 1D of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (39nos. x 02 service) | 78 | Each Service | - | - |
| 1.05 | Carrying out Annual maintenance Contract for screw chilling unit for McQuay make as per the scope of work detailed in Clause No 2.2.4 of Annexure-A1 and for list of assets/areas indicated in Table 1E of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (07 Nos x 3 service) | 21 | Each Service | - | - |
| 1.06 | Carrying out Annual maintenance Contract for screw chilling unit for Dunham Bush make as per the scope of work detailed in Clause No 2.2.4 of Annexure-A1 and for list of assets/areas indicated in Table 1F of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (06 Nos x 3 service) | 18 | Each Service | - | - |
| 1.07 | Carryingout the Operation and Monitoring of Centralized Air conditioning systems, DX AC Plants, Air Cooling and Ventilation System installed in Factory premises, as and when required (except regular shifts operated in SOQR No. 1.01) for Sundays/holidays/on need basis during working days etc., as per the scope of work detailed in clause No.2.1 of Annexure-A1 and for the list of assets/areas indicated in Table 1A of Annexure-A2 or as directed by Engineer-in-charge etc. | 850 | Per Man Day | - | - |
| 1.08 | Carrying out the Comprehensive Maintenance of DX type Air Conditioning System as per the scope of work detailed in Clause No 2.3.1 of Annexure-A1 and for list of assets/areas indicated in Table 2A of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (18 Nos.X02 Service) | 36 | Each Service | - | - |
| 1.09 | Carrying out the Comprehensive Maintenance of Air Cooling/Ventilation Plants as per the scope of work detailed in Clause No 2.3.2 of Annexure-A1 and for list of assets/areas indicated in Table 2B of Annexure-A2 or as directed by Engineer-in-charge etc., complete. (15 Nos.X2 Service) | 30 | Each Service | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Applications-FMC-Factory.xls
BOQ Document • 0.06 MB
BOQ_104496.xls
BOQ Document • 0.35 MB
145628750.pdf
Tender Document • 0.79 MB
Tender-Document-Factory.pdf
Tender Document • 4.02 MB
145628756.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .