| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹3.4 LAccepted-AOC | l1 | Accepted-AOC L1 | |
| 2 | l2₹3.7 L+₹35,246.74 (10.4%)Rejected-AOC NO 69 1 A BLOCK 11TH STREET ANNA NAGAR EAST CRYSTAL COURT A BLOCK 11TH STREET ANNA NAGAR EAST CHENNAI TAMIL NADU 600102 | CHENNAI | TAMIL NADU | 600102 | l2 | Rejected-AOC Rejected due to L2 |
| Sl No | Description | Qty | Unit | R.S.S.ENTERPRISES L1 | SREE RAGAVENDRA INDUSTRIAL ENGINEERS L2 |
|---|---|---|---|---|---|
| 1.00 | Sweeping and mopping of the office floors (Flooring with ceramic / cement / granite tiles) steps, staircases, handrails with scented cleaning agents including clearing and disposal of waste papers daily, Dusting and cleaning of files records in racks, furnitures for twice in a week, cleaning of all partition walls, ceilings [Brick, Wooden & Aluminium, Glazed],Staircase, hand rails, doors, windows, blinds, Name boards, Electrical fittings viz. Tube Lights, fans, Electrical fixtures, switch boxes etc, removal of cobweb once in a month collecting and disposing all the waste to outside of the Office complex, with all general cleaning inside the office Floors etc… complete as directed by the Engineer at site including the cost of all labour, labour uniforms, lead, lift, T&P, cost of all consumable materials such as cleaning powder, Broom sticks, Cobweb sticks, Bamboo baskets, Swabs, Mops, Dungry cloth, Buckets, cost of all consumables etc. complete. ( To be carried out in all working days) | 83,415 | m2 | 1,05,102.9 ₹1,24,021.42 Lowest | 1,25,122.5 ₹1,47,644.55 |
| 2.00 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc.. ( To be carried out in all working days) | 33,810 | m2 | 9,804.9 ₹11,569.78 Lowest | 11,833.5 ₹13,963.53 |
| 3.00 | Sweeping of open areas around Office buildings collection and removal of garbage and wastes from campus to outside office complex daily, all general outdoor cleaning with sprinkling of water, including removal of weeds and unwanted materials as directed by the Engineer at site including the cost of all labour, labour uniforms lead, lift, T&P, cost of all materials such as coconut brooms, Bamboo baskets,cost of all consumables etc.. ( To be carried out in all working days)
Toilet | 9,309 | m2 | 27,927 ₹32,953.86 Lowest | 28,857.9 ₹34,052.32 |
| 4.00 | Water closets(IWC/EWC) | 1,820 | Nos | 15,106 ₹17,825.08 Lowest | 15,470 ₹18,254.6 |
| 5.00 | Urinals cleaning&providing scented urinal screen, | 420 | Nos | 2,797.2 ₹3,300.7 Lowest | 2,814 ₹3,320.52 |
| 6.00 | Wash basin | 2,940 | Nos | 16,758 ₹19,774.44 Lowest | 17,640 ₹20,815.2 |
| 7.00 | Supplying and transporting of portable water,filling in the sump once in three days including cost of water, transporting charges all leads lift etc., completed as directed by the engineer-in-charge | 70 | Trip | 57,400 ₹67,732 Lowest | 59,500 ₹70,210 |
| 8.00 | Supplying and transporting of packed drinking water cane ( 20 litres) 2 Nos per day for the use of Office staff including cost of water , Leads and labour etc., | 140 | days | 10,080 ₹11,894.4 Lowest | 10,500 ₹12,390 |
| 9.00 | Anti Termite Spraying using Chemical emulsion chloropyrifos 20% EC mixed with water will be sprayed at the ratio of 1:19 for 5 Litres mixed solution per 100 m2 once in 3 months to control Termite, Cockroaches, mites, Silver Fish, Cloth Moth, Spider, Ants etc.,Wooden portions will be mixed with concentrated chemicals or with Kerosene and as directed by the engineer at site ( 2 operations -every three month once ). | 696 | m2 | 2,672.64 ₹3,153.72 Lowest | 2,784 ₹3,285.12 |
| 10.00 | Mosquito Control for the entire building shall be carried out once in a fort-night and as directed by the engineer at site (12 services -2 services per every month) | 5,262 | m2 | 1,683.84 ₹1,986.93 Lowest | 1,841.7 ₹2,173.21 |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
23 Oct 2025, 2:00 pmClosed
Chief Engineer /Udangudi STPP-I
Chief Engineer / Udangudi STPP-I
Up keeping of temporary TNPGCL project office building and TCE office building at USTPP 1 by sweeping mopping of floor of the offices removal of cobweb and disposal of waste paper cleaning of toilets for a period of 6 Months from the date of commence
2025_EB_612654_1
CE/SE/C/C02/2025-26
Open Tender
Miscellaneous Works
Item Rate
Udangudi STPP-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹4,500
Yes
14 Nov 2025
10 Oct 2025
24 Oct 2025
10 Oct 2025
23 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
C02.pdf
Tender Documents • 0.67 MB
BOQ_732261.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .