Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | -36.05% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 LAdmitted-Finance | -30.20% | ₹3.5 L | L2 | Admitted-Finance |
| 3 | L3₹4.0 LAdmitted-Finance | -18.96% | ₹4.0 L | L3 | Admitted-Finance |
Tender Value
₹5.0 L
EMD Value
₹9,960
Closing Date
5 Mar 2026, 6:00 pmClosed
Commissioner
Municipal Council Deeg
Construction of CC road from Daudyal house to Baldev house, Ward No. 22
2026_DLB_541502_1
Enit14Mirman 2025-26
Open Tender
Civil Works
15 days
deeg
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
commissioner
₹9,960
Yes
12 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
5 Mar 2026
23 Feb 2026
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffoldingwherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.Cement Concrete Grade M-15 and above and PCC blocks
Carriage ofMaterials bymechanicaltransportincludingloading, unloading andstacking ::
Providing, laying and spreading of granular sub-base by providingcoarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material
Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_965285.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid