| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹2.3 L+₹3,597 (1.56%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹2.4 L+₹6,917 (3.00%)Rejected-Finance 1191 ARDEVOK ROAD BARASAT 24 PGS N KOL 700125 | BARASAT | NORTH 24 PARGANAS | WEST BENGAL | 700125 | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
3 Dec 2025, 12:00 pmClosed
EEC BR-X
28 P.A. SHAH
MAINTENANCE OF PAVER BLOCK NEAR PREM NOS-70/2 D.P.S ROAD,38/1 K.P ROY LANE ETC IN WD NO- 089, BR-X
2025_KMC_944439_1
X/089/030/2025-2026
Open Tender
CIVIL WORKS
Percentage
W089
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
19 Feb 2026
10 Nov 2025
6 Dec 2025
10 Nov 2025
3 Dec 2025
10 Nov 2025
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm.
Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (b) For each additional Depth of 150mm and part thereof.
Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (b) For Medium Sand
BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
SUPPLYING AND LAYING IN THE SPECIFIED PATTERN OF INTERLOCKING CONCRETE BLOCK PAVEMENTS (ICBP) WITH CONCRETE BLOCKS ( WITH CONCRETE GRADE AS SPECIFIED AS PER TABLE 1 OFIS 15658:2006) AMNUFACTURED FROM BIS LICENSE MANUFRACTURER, WITH SPACER NIB (SMALL PROTRUDING PROFILES ON THE VERTICAL FACE OF A PAVER BLOCK USED AS A DEVICE FOR KEEPING MINIMUM JOINT GAP IN BETWEEN THE PAVING BLOCKS, AS PER CL NO 3.26 OF IS: 15658) AND OF SPECIFIED SIZE AND SHAPE WITH ASPECT RATIO ( THE RATIO OF LENGTH TO THICKNESS OF APAVER BLOCK AS PER TABLE 2 OF IS: 15658 WITH FLEXTURAL STRENGTH/BREAKING LOAD AS PER ANNEXTURE G OF IS: 15658 , ON THE PREPARED BASE COURSE OF SPECIFIED CBR AS PER TABLE 1 OF IRC SP 63(2018) OR ELSE AS MENTIONED IN DESIGN AND DRAWING WITH A CUSHION OF COMPACTED BEDING SAND OF 25-35 MM THICK ( GRADING OF THE BEDDING SAND AS PER CLAUSE 6.5.1 OF IRC SP-63) AND FILLING UP YHR GAPS IN BETWEEN PAVER BLOCKS WITH JOINTFILLING SAND ( THE GRADING OF THE JOINT FILLING SAND WILL BE AS PER CLAUSE 6.5.2 OF IRC SP 63 ) AND COMPLETING THE EDGES WITH CUT BLOCKS AS PER CLAUSE 6.5.2 OF IRC SP 63) AND WITH PROPER CONFINEMENT OF BEDDING AND JOINT FILLING SAND, COMPACTION, LEVELLING AND FILLING UP THE EDGE GAP. 50 MM THICK (II) COLOURED DECORATIVE
ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES
Laying of interlocking Paver Blocks as per approved design over 20-30mm th medium yellow sand bed with true to line,lavelling,proper compaction with vibrator etc. with jointing with kerb/edge should be made with Cement Concrete (1:2:4)etc. as per the direction of the Engineer-in-charge and including cost of materials,labour etc. complete
Estimated amount
Add: 9%SGST
Add: 9%CGST
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.15 MB
form.pdf
Tender Documents • 0.08 MB
BOQ_2242098.xls
BOQ • 0.29 MB
civil_new.pdf
Additional Documents • 2.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .