Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Jul 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE VELLORE
Operation and Maintenance, TANGEDCO, Gandhinagar,Vellore
Works Contract for Erection of poles, transportation of poles, paving of HT/LT lines, erection of 1 No. Single Pole DT works and replacement of damaged poles and other allied works in Junior Engineer/West/Vellore Section
2023_EB_334189_1
010
Limited
Electrical and Maintenance Works
Works
180 days
West Vellore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
21 Jul 2023
1 Jul 2023
15 Jul 2023
1 Jul 2023
14 Jul 2023
1 Jul 2023
1 Jul 2023 - 14 Jul 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Loading, Transporting and unloading of poles and associated Materials from substore /vellore to West/Vellore section work spot upto 5 kms. | 21 | Per Pole | - | - |
| 2 | Loading, Transporting and unloading of distribution transformer from central stores /vellore to West/Vellore section work spot upto 10 kms. | 1 | Per each | - | - |
| 3 | Excavation, erection and fixing with various types of line materials for HT pole. | 10 | Per pole | - | - |
| 4 | Excavation, erection and fixing with various types of line materials for LT pole. | 10 | Per pole | - | - |
| 5 | Excation and erection of Stay set Complete | 3 | Per pole | - | - |
| 6 | Excavation, erection of single pole DT structure with square pole and stay as per TNEB Standard, painting and earthing and inculding fixing of all structure materails and erection of Distribution transformer of capacity upto 100 KVA. | 1 | Per Loc | - | - |
| 7 | Stringing of 7/3.35 ACSR / 7/3.15 AAAC size of conductor (circuit length as mentioned in sanction copy) | 1.22 | Per KM | - | - |
| 8 | Dismantling of all size of poles. | 10 | Per pole | - | - |
| 9 | E.P.F. @13 % should be Entered by the Bidder | 1 | Percentage | - | - |
| 10 | E.S.I. @3.25 % should be Entered by the Bidder | 1 | Percentage | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.41 MB
BOQ_396976.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .