THE BHOGPUR COOPERATIVE SUGAR MILLS LTD. BHOGPUR
Fabrication and Erection work
2024_Coop_121702_1
Fabrication and Erection
Open Tender
Miscellaneous Works
Item Rate
45 days
BHOGPUR
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1 L
10 Sept 2024
4 Jun 2024
21 Jun 2024
4 Jun 2024
21 Jun 2024
4 Jun 2024
Amount
FABRICATION AND ERECTION
Dismantling of MS/GI/ pipe line size--1/2" to 12"
Erection of MS/GI/ pipe line size--1/2" to 12"
Dismantling of MS/ pipe line size--14" to 50"
Fabrication of MS/pipe line size ---14" to 50" 3mm/6mm/8mm/10mm/12mm
Erection of fabricated MS/ pipe line size--14" to 50"
Dismantling of C I pipe line upto 12" Erection of C I pipe line upto 12"
Dismentalling of MS Nipple upto 12"dia and upto 1 meter long
Fabrication of MS Nipple upto 12"dia and upto 1 meter long
Erection of MSNipple Nipple upto 12"dia and upto 1 meter long
Dismentalling of faricated MS/ Nipple size--14"to 50"and upto 1 meter long
Fabrication of MS/GI/SS Nipple size ---14" to 50" and upto 1 meter long
Erection of faricated MS/GI/SS Nipple size--14' to 50" and upto 1 meter long
Dismantling of MS/Bend upto 12"dia
Fabrication of MS/ Bend upto 12"dia
Erection of MS/ Bend upto 12"dia
Dismantling of MS/GI/Bend size--14"to 50"
Fabrication of MS/GI/ Bend size ---14" to 50"
Erection of faricated MS/GI/Bend size--14' to 50"
Dismantling of MS/SS Cone size--upto 100"
Fabrication of MS/SS Cone size--upto 100"
Erection of MS/SS Cone size--upto 100"
Dismantling of C I Bend upto 12"
Erection of C I Bend upto 12"
Dismantling of C I Tee upto 12"
Erection of C I Tee upto 12"
Dismantling of C I Cross upto 12"
Erection of C I Cross upto 12"
Dismantling of MS/SS Tee size--upto 100"
Fabrication of MS/SS Tee size--upto 100"
Erection of MS/SS Tee size--upto 100"
Dismantling of MS/SS Cross size--upto 100"
Fabrication of MS/SS Cross size--upto 100"
Erection of MS/SS Cross size--upto 100"
Dismantling, fabrication & Erection of railing of pipe.
Dismantling of railing of pipe.
Fabrication of railing pipe
Erection of railing pipe
Fixing of G.I wire weaved fencing around cold water reservoir
Dismantling and washing of old flange
Fabrication and Drilling of flange from MS plate
Replacement of Square bar/Rail 40mm/50mm
Replacement of Runner Flat of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator/MBC/RBC 65mm/75mm
Replacement of Angle of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator/MBC/RBC 65mm/75mm/90mm
Replacement of Side plate of Cane Carrier/Secondary cane carrier/IRC/Bagasse Elevator / MBC / RBC Chains 6mm/8mm
Dis.Fab. and Erection of hood of Cane Leveller/Cane Chopper with supporting angle 10mm/12mm
Dis.Fab. and Erection of both side plate of hood of Cane Leveller/Cane Chopper with supporting angle 10mm/12mm
Dis.Fab. and Erection of both side plate ( MS/SS 10mm/12mm) of Fibrizer with supporting angle
Dis.Fab. and Erection of front side plate ( MS/SS 10mm/12mm) of Fibrizer with supporting angle
Dis. Fab. and Erection of round Trough of Secondary cane Carrier/IRC/Bgasse Elevator/MBC/RBC 8mm/10mm/12mm plate
Dis. Fab. and Erection of base plate( MS/SS-- 8mm/10mm/12mm) of Secondary cane Carrier/IRC/Bagasse Elevator/MBC/RBC
Fabrication of Rakes of Secondary cane Carrier / IRC with attachment from MS pipe Size-- 4" and 1"
Fabrication of Rakes of Bagasse Elevator/MBC with attachment from MS pipe Size-- 3" and 1"
Dismentalling of MS/SS Round/Square tank
Fabrication of MS/SS Round/Square tank
Erection of MS/SS Round/Square tank
DismentallingBagacilo Screen frame Fabrication Bagacilo Screen frame ErectiontionBagacilo Screen frame
DismentallingBagacilo Railing frame Fabrication Bagacilo Railing frame ErectiontionBagacilo Railing frame
Dismentalling of CI/GM Sluice/Angle/Butterfly Valve Size upto---16" Erection of CI/GM Sluice/Angle/Butterfly Valve Size upto---16"
Dismentalling of Pan Discharge Butterfly valve Erection of Pan Discharge Butterfly valve
Dismentalling of SS/Brass tube of Evaporators (S.K,V.C,Quads) Fitting of SS/Brass tube of Evaporators (S.K,V.C,Quads)
Dismentalling of SS/Brass tube of Pans Fitting of SS/Brass tube of Pans
Dismentalling of SS/Brass tube of Juice Heaters Fitting of SS/Brass tube of Juice Heaters
MS Straight/Right angle valve Size-300mm,350mm,400mm,450mm,600mm,700mm,900mm and 1000mm Dis., Erection
Hydraulic Testing of Evaporators (S.K,V.C,Quads) Hydraulic Testing of Pans Hydaulic Testing of Juice Heaters
MS Blind Size----1" to 50" Dis., Fab., Erection
Dismantling of GI/Colored coated sheet Fitting of GI/Colored coated sheet
Dismantling of ACC sheet Fitting of ACC sheet
Dismantling of MSReducer size--upto 100"
Fabrication of MSReducer size--upto 100"
Erection of MS Reducer size--upto 100"
Dismantling of stair casing Fabrication of stair casing Erection of Stair casing
Dismantling of Monkey Ladder Fabrication of Monkey Ladder Erection of Monkey Ladder
Dismantling of fabricated frame of pump & motor Fabrication of frame of pump & motor Erection of frame of pump & motor
Dismantling of juice/water/syrup/molasses pump Erection of juice/water/syrup/molasses pump
Dismantling of Injection/Spray/Massicuite/Magma pump Erection of Injection/Spray/Massicuite/Magma pump
Dismantling of motor upto 50HP Erection of motor up to 50HP
Dismantling of motor 55 HP to 250 HP Erection of motor 55 HP to 250 HP
Dismantling of bewel geared discharge valve and fitting of butterfly valve with modification of nipple & flange
Strengthening of building structure column binder
Shifting & erection of dry seed Elevator with modification (at new mill); 01 No. Scope of work 1. Shifting of dry seed elevator as such from existing site to near the side wall. 2. Fabrication of required staging on which it is to be mounted. 3. Ladder and platform is to be shifted as such. 4. Dismantling & shifting of drive along with motor is to carried out. 5. All required connections are to be made. 6. Complete trial of the unit. Remarks: civil work will be in the scope of Mills.
Replacement of Shell of Pan 60 Ton
Dismantling Fabrication & erection of pan shell.All dismantled connections to be connected.
Replacement of Save All of pan
Dismantling & erection of save all of pan . All dismantled connections to be connected
Replacement of stirrer shaft of Air Cooled Crystalizer--A, B & C
Dismantling & erection of stirrer shaft of Air Cooled Crystalizer--A, B &C . All dismantled connections to be connected. Dismantling & fitting of drive gear arrangement.
Replacement of Top Cone Of pan
Dismantling & erection of top cone of pan . All dismantled connections to be connected.
Replacement of Bottom Cone Of pan
Dismantling & erection of bottom cone of pan . All dismantled connections to be connected.
Replacement of cooling coils of vertical crystallizer as per drg.
Dismantling & erection of cooling coils of vertical crystallizer . All dismantled connections to be connected.
Shifting & Erection of Pug Mill, Magma Mixture from old Mill to new mill Pug Mill 01 No. 1. Shifting & erection of Pug Mill. 2. Fabrication Of required staging on which it is to be mounted. 3. Ladder and platform are to be shifted if existing available 4. Dismantling& shifting of drive along with motor is to be carried out. 5. All required connections are to be made. 6. Complete trial of unit. Magma Mixture 01 No. 1. Shifting & erection of magma mixture. 2. Fabrication Of required staging on which it is to be mounted. 3. Ladder and platform are to be shifted if existing available 4. Dismantling& shifting of drive along with motor is to be carried out. 5. All required connections are to be made. 6. Complete trial of unit.
Shifting of vacuum crystallizer-A in place of dry seed crystallizer-at the same floor 01 no.
Dismantling & erection of vacuum crystallizer-A in place of mid dry seed crystallizer . All dismantled connections to be connected.
Shifting & erection of 40 tons dry seed crystallizer (Mid one): 01 No. Scope of work
1. Shifting of dry seed crystallizer as susuch from existing site to near the 4th crystallizer on the ground floor. 2. Fabrication of required staging on which it is to be mounted. 3. Ladder & platform is to be fabricated & erected. 4. Dismantling & shifting of drive along with motor are to be carried out 5. All required connections are to be made. 6. Complete trial of the unit.
Erection of New SS condenser:01 No
Scope of work 1. Erection of SS Pan Condenser along with valves and tail pipe. 2. Fabrication of required staging on which it is be mounted. 3. All required connections are to be made. 4. Complete trial of the unit.
Replacement of mud boot
Dismantling,fabrication& erection of mud boot. All dismantled connections to be connected
Replacement of compartment bottom plate of Juice clarifier
Dismantling fabrication & Erection of compartment plate
Dismantling of Massecuite gutter Fabrication of Massecuite gutter Erection of Massecuite gutter
Dismantling , fabrication & erection of dorr compartment shell with MS plate channel angles.The erection work for this will also include all connections which are dismantled during dismantling.
Dismantling , fabrication & erection of dorr compartment/chamber roof with MS plate channel angles supports.The erection work for this job will also include all connections which are dismantled during dismantling
Dismantling of top/ bottom cover of juice heater Erection of top & bottom cover
Dismantling & erection of square channel for rubber strip fitting of juice heaters
Dismantling , fabrication and erection of compartment box of juice heater
Side plate of bottom saucer of pan below tubes 1-Dismantling of side plate 6-8 iches wide from periphery of pan 2-fabrication of 6-8 inches wide strips 12/16mm thick of pan diameter 3-Erection of 6/8 inches strips and welded from body cone with bottom saucer.
Repair of M/S scrapper of primary/ secondary clarifier of ETP
Dismantling , fabrication & erection of drum of primary/secondary clarifier of ETP
Dismantling of old mud mixer scroll Fabrication and Erection of new Mud Mixer Scroll
Modification of Mud mixer Trough To increase the length of mud mixer trough by approx. 1 mtr.
MS Replacement of Bagacilo Line Dismantling, Fabrication and Erection of Bagacilo line
Dismantling, Fabrication and Erection of Bagacillo Cyclone
Erection of oil skimmers.
Fabrication & erection of MS shoot for DSM screen
Fabrication , erection of corrugated 6./8 inch wide plate for equal water distributing at ETP
Modification of sugar grader plates of wire netting discharging point of sugar inside the sugar grader make it leak proof to avoid mixing of M/S sugar
Dismantling, Fabrication and Erection of worn out stirrer arm of vertical crystallizers drive.
Replacement of distance piece of vapour pipe upto 1.5 mtr
Sulphur furnace (Extra work ) Scope of work a. Top baffle plate to be dismantle and erected 250 mm away from existing site. b. Dismantling of existing worn out baffle plate , fabricate and erect at existing site
Gate frame of magma mixture Scope of work a. Fabrication of frame along with MS channel. b. Drill to be made in both MS channel. c. Erection of frame at site
Shiftingofsugarhopper from old plant to new plant Dismantling & erection of sugar hopper.
Erection & commissioning of Hopper Tray with decking plate, connection arrangement of connecting rod and angle klits for wooden strips fitting approx. length 10 mtr.
Dismantling, shifting and erection of sugar elevator from old plant to new plant complete with structure
Dismantling, shifting and erection of sugar Grader from old plant to new plant complete with structure
Planetarygearbox Erection& commissioning of planetary gear box at vertical crystallizer Any additional job to complete the erection work of planetary gear box to be carried out by the contractor
Fabrication&erectionofpneumaticshoot of Grader
Erectionofpneumaticclamps of Grader
Repair of stirrer shaft of vacuum crystallizer Dismantling & erection of stirrer shaft of vacuum crystallizer after repair.
Strengthening of stirrer shaft of air cooled crystallizer • Dismantling & erection of stirrer shaft of air cooled crystallizer after repair.
Dismantling of platform
Fabrication of platform
Erection of platform
FabricationandErectionofcaneunloaderbridgeplatform
Dis,feb,&errectionofumbrellaofpanalongwithitssupports
Dismantling of J-pipe of pans -Fabrication of J-pipe of pans -Erection of J-pipe of pans
Dismantling of vapour/exhaust pipe size-700mm/900mm/1000mm/1100mm
Fabrication of vapour/exhaust pipe from 8mm/10mm thick plate
Erection of vapour/exhaust pipe
Dismantlingofstructureas per the instructionof CE
Fabricationofstructure
Erectionof structure
Patch work of different equipment
Tostraighttheolddamagedvaporpipeandroundtankforplatform.
Dismantling of Steam coilof molasses storage tank atpanstation size 1” to 2”. -Fabrication of Steam coilof molasses storage tank atpanstation size 1” to 2”. -Erection of Steam coilof molasses storage tank atpanstation size 1” to 2”.
Dis, fab, &errection of juice coilof juice clarifier size 4”,5” &6” alongwith its nipple.
Dis. Fab&ErectionofWt.Juice pump strainer
Dismantling,FabricationandErectionofpan SAVE-ALLtopplate
Planetarygearbox Erectionofplanetarygearboxof horizontal crystallizer
Replacementofoldgatevalvewithnewgatevalveofcrystallizers
Dismantling of double beat valve and erection of same of juice heater at existing site.
Dismantling of old Transient heater and Erection of new Transient heater along with all connections and valve.
Fabrication & Erection of Factory structure Complete window (frame &grills)
Modification,& Erection of mill house Rotary screen inlet juice Tank &platform
Fabrication and erection of excess bagasse carrier toRBCas per the dirction of CE scope of work (A) Fabrication and erection of column and structure for Belt conveyor , Along with drive system and discharge chuteto RBC Column and steel structure
Fabricationanderectionofcoolingtowerstructureandshed
Strengthening of pans/vacuum crystallizer shell with angle and channels in round shape with MS angle 75mmx75mm and dia 4mtr ( Two rounds )
Strengthening of evaporator shell with angle and channels in round shape with MS angle 75mmx75mm and dia 2.80mtr ( Two rounds )
Dismantling , fabrication & erection of juice feed boxes of juice heater double beat valve.The erection work for this job will also include all connections which are dismantled during dismantling.
Dismantling , fabrication & erection of melter of sulphur furnace as per existing design. This work include dismantling and erection of all connections, man hole, flanges etc.
Dismantling , fabrication & erection of scrubber of sulphur furnace as per existing design. This work include dismantling and erection of all connections, man hole, flanges etc.
Replacement of sealing ring of dorr mud boot
Dismantling , fabrication & erection of worn out heavy / light vacuum tank of RVF including all connections.
Dismantling , fabrication & erection of MS barometric condenser of RVF. This job will include all connections which are dismantled during dismantling.
Dismantling , fabrication & erection of bottom trough of RVF
Dismantling , fabrication & erection of down take of pan from 10/12 plate
Dismantling , fabrication & erection distributor of pans
Replacement of feed box of pans including all connections
Fitting of pad, ribs on shaft of air cooled /vacuum crystallizer and fitting of angle and ribbon
Strengthening of cane unloader column
Fabrication & erection of milk of lime preparation and addition to lime slaker with tank dia app.1.0 meter and hot and cold water adition connection in front of lime slaker.
Dismantling of SS pipe line size--1/2" to 12"
Erection of SS pipe line size--1/2" to 12"
Dismantling of SS Bend upto 12"dia
Fabrication of SS Bend upto 12"dia
Erection of SSBendupto 12"dia
Dismantling of SS Bend size--14"to 50"
Fabrication of SS Bend size ---14" to 50"
Erection of fabricated SS Bend size--14' to 50"
TAB ENGINEERING WORKS
MOHAMAD MUSTKEEM
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .