| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.6 LAccepted-AOC | ₹12.6 L Quoted ₹12.5 L | L1 | Accepted-AOC ACCEPT |
| 2 | L2₹12.6 LRejected-Finance | ₹12.6 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | MANU CONSTRUCTION L2 | A.S.Arivazhagan L1 |
|---|---|---|---|---|---|
| 1.00Description | |||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 A | 19.32 | per Cum. | 112 ₹2,164 Lowest | 112 ₹2,164 Lowest |
| 3.00 | Supplying and erecting centering for sides and soffits etc completed | 210 | per Sqm. | 350 ₹73,500 | 318 ₹66,780 Lowest |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 92.4 | per Cum. | 4,754 ₹4,39,270 Lowest | 4,754 ₹4,39,270 Lowest |
| 5.00 | Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 88.62 | per Cum. | 6,123 ₹5,42,620 Lowest | 6,123 ₹5,42,620 Lowest |
| 6.00 | Provision for Bitumen pad in 12mm thick | 1 | per Cum. | 1,500 ₹1,500 Lowest | 1,500 ₹1,500 Lowest |
| 7.00 | Labour welfare fund 1.00 % | 1 | Nos | 10,590.54 ₹10,591 | 10,523.34 ₹10,523 Lowest |
| 8.00 | GST 18.00 % | 1 | Nos | 1,90,629.72 ₹1,90,630 | 1,89,420.12 ₹1,89,420 Lowest |
Tender Value
₹12.6 L
EMD Value
₹12,570
Closing Date
4 Mar 2024, 12:00 pmClosed
BLOCK DEVELOPMENT OFFICER, PERNAMALLUR
BLOCK DEVELOPMENT OFFICE, PERNAMALLUR
Providing Cement Road to Perumal Koil Street at Namathodu Panchayat in Peranamallur Block in Tiruvannamalai District under Mines and Minerals Scheme - 2023-2024
2024_RDTN_431407_1
42/2024/A6, 24.01.2024
Open Tender
Civil Works
Lump-sum
90 days
PERNAMALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,570
29 Jun 2026
28 Feb 2024
4 Mar 2024
28 Feb 2024
4 Mar 2024
28 Feb 2024
Amount
Description
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 A
Supplying and erecting centering for sides and soffits etc completed
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Provision for Bitumen pad in 12mm thick
Labour welfare fund 1.00 %
MANU CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].