| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 CrAdmitted-Finance | ₹8.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.0 Cr+₹1.9 Cr (23.3%)Admitted-Finance 9 FLOOR INFINITY TOWER C DLF CYBER CITY PHASE LL GURGAON HARYANA 122002 LETTER OF INTENT | ₹10.0 Cr+₹1.9 Cr (23.3%) | L2 | Admitted-Finance |
| 3 | L3₹12.0 Cr+₹3.9 Cr (48.1%)Admitted-Finance T 305 TF TIRUPATI PLAZA SECTOR XI MLU PKT 4 PLOT NO 11 DWARKA NEW DELHI 110075 | SOUTH WEST | DELHI | 110075 | ₹12.0 Cr+₹3.9 Cr (48.1%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical 702 C B SQUARE ANDHERI KURLA ROAD J B NAGAR ANDHERI EAST MUMBAI 400059 INDIA | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | - | - | Rejected-Technical Rejected |
| 5 | Rejected-Technical 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | - | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
11 Nov 2019, 3:00 pmClosed
General Manager(CS_BD)
17 Jawahar building, Rajaji Salai Chennai 600001
Selection of Independent Engineer (IE) for construction of IOCL Captive Jetty project at Kamarajar Port
2019_MoS_511911_1
KPL/PPD/IOCL/IE/2019
Open Tender
Civil Works - Others
Works
1980 days
Kamarajar Port Limited
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2 L
Yes
Kamarajar Port Limited
1 Feb 2020
17 Oct 2019
12 Nov 2019
17 Oct 2019
11 Nov 2019
6 Nov 2019
17 Oct 2019 - 25 Oct 2019
25 Oct 2019
Amount
Carrying out Review and approval of DPR, Designs and drawings, Issue of completion certificate by Kamarajar Port Limited to IE, as detailed below: 1.Review and approval of the DPR, Design and Drawings of the project. 2.Review of Construction methodology, quality assurance procedures, procurement, engineering and construction time schedule submitted by the Concessionaire.complete. 3.Review and recommendation of the Operation and Maintenance plan prepared by the Concessionaire. 4.Verification of the Documents on Manufacture and delivery of the POL /LPG Handling Equipment as submitted by the Concessionaire. 5.Issue of Provisional / Completion certificate for the Project. 6.Vetting of as-built drawings by the Independent Engineer, Completion of work,Certification of Actual Project cost and reasonableness of variation(+/-), if any and issue of completion certificate by Kamarajar Port Limited to the IE for the project.
Description of Work / Item(s)
Amount
Monthly payment for the services of Inspection of the Construction as per TOR for 60 months during Construction Phase and until completion of 6 months from the date of commencement of commercial operation.
Team Leader / Project Manager
Civil / Resident Engineer
Mechanical Engineer
Electrical Engineer
Geo-Technical Engineer
Environmental / Health & Safety Engineer
Description of Work / Item(s)
Amount
BoQ 1 - Review and approval of DPR, Designs and drawings, Issue of completion certificate by Kamarajar Port Limited to Independent Engineer.
BoQ - 2 - Monthly payment for the services of Inspection of the Construction as per TOR for 60 months during Construction Phase and until completion of 6 months from the date of commencement of commercial operation.
LnT Infrastructure Engineering Limited
AECOM INDIA PVT. LTD.
AECOM INDIA PVT. LTD.
Egis India Consulting Engineers Private Limited
AECOM INDIA PVT. LTD.
Egis India Consulting Engineers Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .