Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33,182.88Admitted-Finance | -15.00% | ₹33,182.88 | L1 | Admitted-Finance |
| 2 | L2₹39,038.68+₹5,855.80 (17.6%)Admitted-Finance | +0.00% | ₹39,038.68+₹5,855.80 (17.6%) | L2 | Admitted-Finance |
| 3 | L3₹46,495.07+₹13,312.19 (40.1%)Admitted-Finance | +19.10% | ₹46,495.07+₹13,312.19 (40.1%) | L3 | Admitted-Finance |
| 4 | L4₹46,842.51+₹13,659.63 (41.2%)Admitted-Finance | +19.99% | ₹46,842.51+₹13,659.63 (41.2%) | L4 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
17 Aug 2026, 2:00 pmClosed
Executive Engineer PHED Dn Siwana
Executive Engineer PHED Division Siwana
Annual Rate Contract for Lowering Unlowering of Source under Sub Dn Siwana
2026_PHCJO_584812_2
Nivida No 2026-27/09
Open Tender
Civil Works - Water Works
Percentage
365 days
Executive Engineer PHED Dn Siwana
refer to TD
2 documents required · 2 mandatory
₹500
Executive Engineer PHED Dn Siwana
₹20,000
Yes
22 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to store as direction, receiving repaired / new pump set from store/ divisional store , testing the same, transportation to site and lowering back into tube well along with submersible cable, lowering pipes, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any. (Upto 20 Km distance run by lowering machine) ( Rates are Exclusive of GST ) For three Phase pump set G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50 mm | 1 | Each | 1,367.8 | ₹1,367.8 |
| 2 | 65 mm | 1 | Each | 1,630.51 | ₹1,630.51 |
| 3 | 80 mm | 1 | Each | 1,805.08 | ₹1,805.08 |
| 4 | HDPE Pipe Lowering Assembly of nominal dia 63 MM | 1 | Each | 919.49 | ₹919.49 |
| 5 | 75 mm | 1 | Each | 1,094.07 | ₹1,094.07 |
| 6 | 90 mm | 1 | Each | 1,268.64 | ₹1,268.64 |
| 7 | Add above item 1.1 for depth above 120 mtr for each 10 mtr depth | 1 | Each | 0.1 | ₹0.1 |
| 8 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. | 1 | Each | 0.1 | ₹0.1 |
| 9 | For single Phase pump set G.I. Double Flanged Pipe Lowering Assembly of nominal dia 32 mm | 1 | Each | 1,153.39 | ₹1,153.39 |
| 10 | 50 mm | 1 | Each | 1,200 | ₹1,200 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
002.pdf
Tender Documents • 0.32 MB
BOQ_1039319.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .