Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹2,560
Closing Date
28 Nov 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Water Works Division Srinagar
Executive Engineer Water Works Division Srinagar Lal Chowk Exchange Road Srinagar
Part A Improvements and extension by way of laying and fitting of 40mm dia G.I. sub main to Razdan Bagh near Masjid Usman Pathpora Chattabal Srinagar to replace the decades old choked and damaged pipeline. Part B Improvements to water supply to Gous
2020_PHE_109302_6
E-NIT No. 23/WWD of 2020-21
Open Tender
Civil Works - Water Works
Item Rate
10 days
Various areas of Srinagar City
As per NIT
3 documents required · 3 mandatory
₹130
Yes
Executive Engineer Water Works Division Srinagar
₹2,560
Yes
30 Nov 2020
16 Nov 2020
30 Nov 2020
16 Nov 2020
28 Nov 2020
16 Nov 2020
120 days
Amount
Part-A
Earthwork in excavation by manual means in trenches of foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms , lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth up to 1m from cutting edge. All kinds of soil.
Laying & fitting of following dia G.I pipes complete excluding cost of pipes and earth work including all types of carriages. 40mm dia G.I pipe.
Making connections of G.I distribution branch with G.I main of following size by providing & fixing of Tees, including cutting & threading the pipe Complete. 25-40 dia nominal bore.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Layer not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
Carriage of materials from Divisional store up to the site of work including loading, un-loading & stacking complete for an average lead of 5Km
Part-B
Earthwork in excavation by manual means in trenches of foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, including dressing of sides and ramming of bottoms , lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth up to 1m from cutting edge. All kinds of soil.
Earth work excavation in trenches for pipes in ordinary/Macadam/Tar cut /soft rock/tiles, muck etc and in all conditions of saturation for required width and depth as directed by engineer in-charge by Manual or Mechanical means as per site requirement, including dressing of sides, ramming of bottoms, site clearance, including dewatering, close timbering if required (complete job).
Laying & fitting of following dia G.I pipes complete excluding cost of pipes and earth work including all types of carriages. 50mm dia G.I pipe.
Making connections of G.I distribution branch with G.I main of following size by providing and fixing of Tees, including cutting and threading the pipe Complete.
50-80 dia nominal bore.
25-40 dia nominal bore.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Layer not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
Carriage of material from Divisional store up to the site of work including loading, un-loading & stacking complete for an average lead of 05Km.
Part-C
Earthwork in excavation by manual means in trenches of foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5 mts from cutting edge, disposed earth is to be leveled and neatly dressed in:(All kinds of soil)
Laying and fitting of following dia G.I pipes complete excluding cost of pipes and earth work, including types of carriages.
40 mm dia G.I pipe
25 mm dia G.I pipe
Making connections of G.I distribution branch with G.I main of following size by providing and fixing of Tees, including cutting and threading the pipe Complete. 25-40 dia nominal bore.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Layer not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
Carriage of materials from Divisional store up to the site of work including loading, un-loading & stacking complete for an average lead of 6Km
Part-D
Earthwork in excavation by manual means in trenches of foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5 mts from cutting edge, disposed earth is to be leveled and neatly dressed in:(All kinds of soil)
Laying and fitting of following dia G.I pipes complete excluding cost of pipes and earth work, including types of carriages. 25 mm dia G.I pipe.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Layer not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
Carriage of materials from Divisional store up to the site of work including loading, un-loading & stacking complete for an average lead of 5Km
Part-D
Earthwork in excavation by manual means in trenches of foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5 mts from cutting edge, disposed earth is to be leveled and neatly dressed in:(All kinds of soil)
Laying and fitting of following dia G.I pipes complete excluding cost of pipes and earth work, including types of carriages. 25mm dia G.I pipe.
Making connections of G.I distribution branch with G.I main of following size by providing and fixing of Tees, including cutting and threading the pipe Complete. 25-40 dia nominal bore.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. Layer not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead up to 50m and lift up to 1.5m.
Carriage of materials from Divisional store up to the site of work including loading, un-loading and stacking complete for an average lead of 8Km
stage.html
html • 0.02 MB
finance_209148.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .