Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SHED NO 7 SURVEY NO 407 CORRTECH ENERGY LIMITED SARKHEJ BAVLA HIGHWAY CHANOGDAR AHMEDABAD GUJARAT 382213 | AHMADABAD | GUJARAT | 382213 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 126 BOTAHGHULI OPP BOR NAMGHAR PANJABARI GUWAHATI KAMRUP ASSAM 781037 | KAMRUP METRO | ASSAM | 781037 | Admitted-Finance |
| 4 | Admitted-Finance NEAR LIONS CLUB KOTHAMANGALAM ERNAKULAM KERALA 686691 | ERNAKULAM | KERALA | 686691 | Admitted-Finance |
| 5 | Rejected-Technical A 412 413 SWASTIK DISA BUSINESS PARK VIA VADHANI INDUSTRIAL ESTATE LBS MARG GHATKOPAR MUMBAI MAHARASHTRA 400086 | MUMBAI SUBURBAN | MAHARASHTRA | 400086 | Rejected-Technical Offer not meeting technical experience PQC as per tender NIT Cl. 13(C). |
Tender Value
Refer Docs
Closing Date
30 Sept 2021, 3:00 pmClosed
GM T
SRPL Chennai
Carrying out DCVG, CIPS, Soil resistivity survey in CBPL, Chennai ATFPL and DDPL pipelines
2021_SRCHN_137954_1
SRP21TS018
Open Tender
Electrical - All
Works
180 days
Manali
Refer NIT
6 documents required · 6 mandatory
Exempted
2 Feb 2022
10 Sept 2021
1 Oct 2021
10 Sept 2021
30 Sept 2021
15 Sept 2021
10 Sept 2021 - 14 Sept 2021
Amount
Manali Jurisdiction (CBPL)
Conducting "Soil Resistivity Survey" at every 125M interval in Mainline as per the specification, approved procedures and instructions of Site Engineer / Engineer-in-Charge.
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
Manali Jurisdiction (ATFPL)
Conducting "Soil Resistivity Survey" at every 125M interval in Mainline as per the specification, approved procedures and instructions of Site Engineer / Engineer-in-Charge.
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
Chittoor Jurisdiction(CBPL)
Conducting "Soil Resistivity Survey" at every 125M interval in Mainline as per the specification, approved procedures and instructions of Site Engineer / Engineer-in-Charge.
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
Bangalore Jurisdiction(CBPL)
Conducting "Soil Resistivity Survey" at every 125M interval in Mainline as per the specification, approved procedures and instructions of Site Engineer / Engineer-in-Charge.
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
Bangalore Jurisdiction(DDPL)
Conducting "Soil Resistivity Survey" at every 125M interval in Mainline as per the specification, approved procedures and instructions of Site Engineer / Engineer-in-Charge.
Conducting Close Interval ON/OFF Potential Logging Survey at an interval of 1 m over the buried line in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications, and approved procedures identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects and directions of Site Engineer / Engineer-in-Charge.
Conducting Direct Current Voltage Gradient Survey over the buried line to identify / pin point the coating defects in the right of way including the cost of all expert manpower, transportation and camping facilities etc. to their employees, materials, test instruments, equipments, consumables etc., required for the survey as per the standard specifications and approved procedures, identification of areas/locations where coating repair is required alongwith suggestion for remedial measures etc. including the submission of draft reports in 2 sets and incorporation of owner's comments in the draft report and final reports in 6 sets including one soft copy containing the survey results in the graphical as well as tabular forms computerised colour print and complete in all respects as per directions of Site Engineer / Engineer-in-Charge. Note : The item includes establishing the coating defect at specified locations by excavation in coordination with mainline contractor, who will arrange to repair the defects.
TechnoCorr Engineering Pvt Ltd
CORRTECH ENERGY LIMITED
MITCORR CATHODIC PROTECTION PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .